{"id":10185,"date":"2024-02-13T00:03:25","date_gmt":"2024-02-12T16:03:25","guid":{"rendered":"https:\/\/wp-productionenv-bjg9h2g2bgg5b8aa.southeastasia-01.azurewebsites.net\/news\/cleanest-first-flight-ula-president-reflects-on-inaugural-vulcan-launch-and-future-of-program\/"},"modified":"2024-02-13T00:03:25","modified_gmt":"2024-02-12T16:03:25","slug":"cleanest-first-flight-ula-president-reflects-on-inaugural-vulcan-launch-and-future-of-program","status":"publish","type":"post","link":"https:\/\/starpath.global\/news\/cleanest-first-flight-ula-president-reflects-on-inaugural-vulcan-launch-and-future-of-program\/","title":{"rendered":"\u2018Cleanest first flight,\u2019 ULA president reflects on inaugural Vulcan launch and future of program"},"content":{"rendered":"<figure id=\"attachment_65326\" aria-describedby=\"caption-attachment-65326\" style=\"width: 876px\" class=\"wp-caption alignnone\"><img fetchpriority=\"high\" decoding=\"async\" class=\"size-full wp-image-65326\" src=\"http:\/\/spaceflightnow.com\/wp-content\/uploads\/2024\/02\/20240211_Vulcan_Launch_Remote1_AB_SFN.jpg\" alt=\"\" width=\"876\" height=\"584\" srcset=\"https:\/\/spaceflightnow.com\/wp-content\/uploads\/2024\/02\/20240211_Vulcan_Launch_Remote1_AB_SFN.jpg 876w, https:\/\/spaceflightnow.com\/wp-content\/uploads\/2024\/02\/20240211_Vulcan_Launch_Remote1_AB_SFN-300x200.jpg 300w, https:\/\/spaceflightnow.com\/wp-content\/uploads\/2024\/02\/20240211_Vulcan_Launch_Remote1_AB_SFN-678x452.jpg 678w, https:\/\/spaceflightnow.com\/wp-content\/uploads\/2024\/02\/20240211_Vulcan_Launch_Remote1_AB_SFN-768x512.jpg 768w\" sizes=\"(max-width: 876px) 100vw, 876px\"><figcaption id=\"caption-attachment-65326\" class=\"wp-caption-text\">The inaugural Vulcan rocket, powered by two Blue Origin-built BE-4 engines, lifts off from SLC-41 at Cape Canaveral Space Force Station on Jan. 8, 2024. Image: Adam Bernstein\/Spaceflight Now<\/figcaption><\/figure>\n<p>United Launch Alliance entered an important new era for the company with the debut of its Vulcan rocket in early January. The flight was one that was highly anticipated by those both inside and outside ULA and, by all metrics, it was a highly successful mission for ULA.<\/p>\n<p>To mark a month after this inaugural launch, Spaceflight Now sat down with ULA President and CEO Tory Bruno for a discussion about that first certification flight and the year ahead for the company and the rocket.<\/p>\n<p>\u201cThis was the cleanest first flight I\u2019ve ever seen. I\u2019ve personally been involved with about three dozen of them,\u201d Bruno said. Prior to his time with ULA, Bruno was the vice president and general manager of Lockheed Martin\u2019s Strategic and Missile Defense Systems.<\/p>\n<p>Bruno was among the launch team on console during the countdown, which was run from the Advanced Spaceflight Operations Center (ASOC) at Cape Canaveral Space Force Station. He said the lack of issues during the countdown threw him for a loop at times.<\/p>\n<p>\u201cIt was a very clean countdown. Not an exaggeration, true story, there\u2019s probably 25 minutes or so, I\u2019m sitting on console, silence and I thought my headset was busted,\u201d Bruno said. \u201cI\u2019m like, \u2018Maddie, find IT, my headset is broken.\u2019 They come back, \u2018No, Tory, there\u2019s literally nothing happening. It\u2019s just that quiet.\u2019\u201d<\/p>\n<p>Bruno said the only issue came towards the end of the roughly 320-second first stage burn of the Vulcan booster: it ended about 1.2 seconds early. He described that as a thermal modeling issue where the last bit of propellant that was moving through the feed line was warmer than anticipated, which triggered the shutdown.<\/p>\n<figure id=\"attachment_65327\" aria-describedby=\"caption-attachment-65327\" style=\"width: 876px\" class=\"wp-caption alignnone\"><img loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-65327\" src=\"http:\/\/spaceflightnow.com\/wp-content\/uploads\/2024\/02\/20240211_Vulcan_Cert-1_launch_MC.jpg\" alt=\"\" width=\"876\" height=\"584\" srcset=\"https:\/\/spaceflightnow.com\/wp-content\/uploads\/2024\/02\/20240211_Vulcan_Cert-1_launch_MC.jpg 876w, https:\/\/spaceflightnow.com\/wp-content\/uploads\/2024\/02\/20240211_Vulcan_Cert-1_launch_MC-300x200.jpg 300w, https:\/\/spaceflightnow.com\/wp-content\/uploads\/2024\/02\/20240211_Vulcan_Cert-1_launch_MC-678x452.jpg 678w, https:\/\/spaceflightnow.com\/wp-content\/uploads\/2024\/02\/20240211_Vulcan_Cert-1_launch_MC-768x512.jpg 768w\" sizes=\"(max-width: 876px) 100vw, 876px\"><figcaption id=\"caption-attachment-65327\" class=\"wp-caption-text\">ULA\u2019s Vulcan rocket launches on its first certification flight, carrying Astrobotic\u2019s Peregrine lunar lander onboard. Image: Michael Cain\/Spaceflight Now<\/figcaption><\/figure>\n<p>\u201cThat was less than a sigma, like 7\/10 of a sigma in performance, which would be well within flight-to-flight variation. So, that is a post-flight observation,\u201d Bruno explained. \u201cObviously, we knew it did that in real time. Afterwords is when we understood it was a thermal modeling issue.\u201d<\/p>\n<p>Bruno said the likely solution will be to adjust the amount of propellant reserve to account for that. He said that work will be done in time, but that it isn\u2019t a pressing issue for their next several flights.<\/p>\n<p>He said while that was the only issue of note, they will continue reviewing the data through the end of February. The reason for that is because with data handoffs that happen between ground stations during flight, there are pieces of the puzzle that need to be fitted together in a thorough, post-flight analysis.<\/p>\n<p>\u201cOver time, all this other data comes in, it gets cleaned up, it gets synchronized in time and events because obviously data you collect in Guam versus real time data down from TDRSS (Tracking and Data Relay Satellite System) is not going to be exactly in the same time reference. So you have to do all of that manually and then you comb through it,\u201d Bruno explained.<\/p>\n<p>\u201cSo, that\u2019s why it\u2019ll take until then. They haven\u2019t found anything yet. It\u2019s just literally the cleanest first flight I\u2019ve ever experienced. It was like the 90th Atlas, not the first Vulcan.\u201d<\/p>\n<h4>Dream Chaser and Cert-2<\/h4>\n<p>With the first flight of Vulcan now largely in the rearview mirror, the ULA team is pressing ahead with the second certification mission. The payload is Sierra Space\u2019s Dream Chaser spaceplane on a cargo supply mission to the International Space Station.<\/p>\n<p>Bruno said they don\u2019t need to wait for the conclusion of the data review to continue the momentum on this next mission.<\/p>\n<p>\u201cWe\u2019ll just continue to build and ship and transport and be ready. We\u2019ll do that in parallel because it\u2019ll finish up pretty soon,\u201d Bruno said. \u201cWe\u2019re probably 20, 25 days away from completely finishing every last little bit of data review. So, no reason to wait for that. We\u2019ll work in parallel.\u201d<\/p>\n<p>When Bruno spoke with Spaceflight Now on Jan. 31, he said that both the Vulcan booster and the Centaur 5 upper-stage were built and that the Blue Origin-built BE-4 engines that power the first stage were out in Texas for testing.<\/p>\n<p>\u201cOnce they come through, then we can finish it and we\u2019ll be ready to go,\u201d Bruno said. \u201cAnd then we\u2019ll be waiting on our payload, which is the way we like it.\u201d<\/p>\n<p>On Feb. 5, Bruno posted to social media, stating that one of the BE-4 engines for the Cert-2 mission inside the rocket factory in Decatur, Alabama. A couple days later he shared an image of the engine as well.<\/p>\n<p><iframe id=\"twitter-widget-0\" scrolling=\"no\" frameborder=\"0\" allowtransparency=\"true\" allowfullscreen=\"true\" class=\"\" style=\"position: absolute; visibility: hidden; width: 0px; height: 0px; display: block; flex-grow: 1;\" title=\"X Post\" src=\"https:\/\/platform.twitter.com\/embed\/Tweet.html?dnt=true&amp;embedId=twitter-widget-0&amp;features=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%3D%3D&amp;frame=false&amp;hideCard=false&amp;hideThread=false&amp;id=1755259367668998298&amp;lang=en&amp;origin=https%3A%2F%2Fspaceflightnow.com%2F2024%2F02%2F12%2Fcleanest-first-flight-ula-president-reflects-on-inaugural-vulcan-launch-and-future-of-program%2F&amp;sessionId=4ea359076c94ce4e2e004f4e76e756f787fd22bf&amp;theme=light&amp;widgetsVersion=6a3ad42b224df%3A1778106238597&amp;width=550px\" data-tweet-id=\"1755259367668998298\"><\/iframe><\/p>\n<blockquote class=\"twitter-tweet\" data-width=\"550\" data-dnt=\"true\" data-twitter-extracted-i1782461765411840777=\"true\">\n<p lang=\"en\" dir=\"ltr\">Nothing quite as pretty on a Wednesday morning as a brand new shiny #BE4 rolling over to get installed on the next #Vulcan\u2026 pic.twitter.com\/NEUvO7VPhK<\/p>\n<p>\u2014 Tory Bruno (@torybruno) February 7, 2024<\/p>\n<\/blockquote>\n<p><script async=\"\" src=\"https:\/\/platform.twitter.com\/widgets.js\" charset=\"utf-8\"><\/script><\/p>\n<p>Reaffirming what he previously stated before the Cert-1 launch, Bruno said that as far as Vulcan readiness is concerned, ULA would be prepared to support the Cert-2 launch in the April timeframe. He said because they have two staging areas for rocket integration, that won\u2019t create a conflict with the Crewed Test Flight of Boeing\u2019s Starliner spacecraft, which is targeting a launch no earlier than mid-April.<\/p>\n<p>Meanwhile, up in Sandusky, Ohio, at NASA\u2019s Glenn Research Center, the Dream Chaser spaceplane, dubbed Tenacity, is undergoing environmental testing before it will be shipped down to the Cape to go through final checkouts and cargo loading.<\/p>\n<p>Speaking at a media event before the next stage of testing began, Sierra Space CEO Tom Vice described their excitement at finally reaching this stage.<\/p>\n<p>\u201cWe are coming out of years of development, years of hard work, years of resolving really tough engineering challenges that come from revolutionizing the way we do things,\u201d Vice said. \u201cAnd we are really excited that this year we enter orbital operations for NASA. It is a year that we change how we connect Earth and space.\u201d<\/p>\n<p><iframe loading=\"lazy\" title=\"Sierra Space's Dream Chaser spaceplane undergoes key testing at NASA's Armstrong Test Facility\" width=\"678\" height=\"381\" src=\"https:\/\/www.youtube.com\/embed\/hbQ-wHT0fTc?feature=oembed\" frameborder=\"0\" allow=\"accelerometer; autoplay; clipboard-write; encrypted-media; gyroscope; picture-in-picture; web-share\" allowfullscreen=\"\"><\/iframe><\/p>\n<h4>National security readiness and West Coast launches<\/h4>\n<p>Getting through these two consecutive certification flights are critical for ULA in clearing the vehicle to start flying National Security Space Launch (NSSL) missions.<\/p>\n<p>\u201c[Assured Access to Space] has a new entrant cert. guide that defines those different ways. And when you look through that, you can actually see there\u2019s a variety of ways a launch service provider can certify,\u201d said U.S. Space Force Lt. Col. David Schill, the Space Launch Delta 45 Vulcan Centaur materiel leader, in a pre-produced video regarding the Vulcan Cert-1 launch.<\/p>\n<p>\u201cWhat ULA has done is they selected an approach, which requires two consecutive, successful launches. And in addition to those two consecutive, successful launches, a government team has technical insight into and acceptance of the system design,\u201d Schill said. \u201cSo, that\u2019s really unique in this case and which makes Vulcan special is that deep, technical insight that we have into the program.\u201d<\/p>\n<figure id=\"attachment_65328\" aria-describedby=\"caption-attachment-65328\" style=\"width: 876px\" class=\"wp-caption alignnone\"><img loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-65328\" src=\"http:\/\/spaceflightnow.com\/wp-content\/uploads\/2024\/02\/20240211_Vulcan_Remote_5_Adam_SFN.jpg\" alt=\"\" width=\"876\" height=\"1226\" srcset=\"https:\/\/spaceflightnow.com\/wp-content\/uploads\/2024\/02\/20240211_Vulcan_Remote_5_Adam_SFN.jpg 876w, https:\/\/spaceflightnow.com\/wp-content\/uploads\/2024\/02\/20240211_Vulcan_Remote_5_Adam_SFN-214x300.jpg 214w, https:\/\/spaceflightnow.com\/wp-content\/uploads\/2024\/02\/20240211_Vulcan_Remote_5_Adam_SFN-678x949.jpg 678w, https:\/\/spaceflightnow.com\/wp-content\/uploads\/2024\/02\/20240211_Vulcan_Remote_5_Adam_SFN-768x1075.jpg 768w\" sizes=\"auto, (max-width: 876px) 100vw, 876px\"><figcaption id=\"caption-attachment-65328\" class=\"wp-caption-text\">A pair of Blue Origin BE-4 engines sandwiched between two Northrop Grumman GEM 63XL solid rocket boosters power ULA\u2019s Vulcan rocket on its inaugural launch. Image: Adam Bernstein\/Spaceflight Now<\/figcaption><\/figure>\n<p>Through five years of NSSL Phase 2 Contract Launch Service Task Order awards, ULA has 48 missions ahead of it that are valued at about $3.1 billion. Among those missions, 47 will be launched using its Vulcan rocket.<\/p>\n<p>The first such mission on deck for Vulcan will be USSF-106, a multi-manifest mission consisting of the Navigation Technology Satellite-3 (NTS-3) and another payload for the U.S. Space Force.<\/p>\n<p>These missions are coordinated through the U.S. Space System Command, which is headquartered at the Los Angeles Air Force Base in California. While SSC said the specific cost of the USSF-106 mission with Vulcan is proprietary information to ULA, it has publicly stated that the mission was part of a two-launch award worth $278.7 million. The other mission in that bundle, USSF-51, is set to launch using ULA\u2019s Atlas 5 rocket as soon as March.<\/p>\n<p>In a joint statement to Spaceflight Now, Col. Doug Pentecost, the SSC\u2019s Deputy Program Executive Officer for Assured Access to Space, and Michael Sanjume, the senior materiel leader for Vulcan Systems and Operations described the timeline following the Cert-2 launch.<\/p>\n<p>\u201cOnce ULA has completed their second certification flight (\u2018Cert-2\u2019), the government will do its final analysis for certification over a few months, allowing for USSF-106 to launch this summer,\u201d they said in their statement.<\/p>\n<p>Between ULA\u2019s three rockets, Pentecost and Sanjume said there are five NSSL missions on the 2024 manifest:<\/p>\n<ul>\n<li>USSF-106 \u2013 Vulcan<\/li>\n<li>GPS 3-SV07 \u2013 Vulcan<\/li>\n<li>USSF-87 \u2013 Vulcan<\/li>\n<li>USSF-51 \u2013 Atlas 5<\/li>\n<li>NROL-70 \u2013 Delta 4 Heavy<\/li>\n<\/ul>\n<p>USSF-51 and NROL-70 are slated to be the final NSSL missions using ULA\u2019s legacy rockets, according to Pentecost and Sanjume. The latter of the two will mark the final Delta rocket to launch before that line is officially retired.<\/p>\n<p>Bruno said there are important reasons to retire the Delta 4 Heavy, not least of which is the cost savings per launch with Vulcan. But he said it will be somewhat sad to see it\u2019s final flight.<\/p>\n<p>\u201cIt\u2019s a beautiful rocket. It\u2019s launched amazing missions. It\u2019s the most metal of all rockets, as I like to say. It sets itself on fire before going to space,\u201d Bruno said. \u201cI just love it and so, we\u2019re all going to miss it. It\u2019ll be bittersweet.\u201d<\/p>\n<figure id=\"attachment_62542\" aria-describedby=\"caption-attachment-62542\" style=\"width: 1200px\" class=\"wp-caption alignnone\"><img loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-62542\" src=\"http:\/\/spaceflightnow.com\/wp-content\/uploads\/2023\/06\/20230622d4hitlquick.jpg\" alt=\"\" width=\"1200\" height=\"800\" srcset=\"https:\/\/spaceflightnow.com\/wp-content\/uploads\/2023\/06\/20230622d4hitlquick.jpg 1200w, https:\/\/spaceflightnow.com\/wp-content\/uploads\/2023\/06\/20230622d4hitlquick-300x200.jpg 300w, https:\/\/spaceflightnow.com\/wp-content\/uploads\/2023\/06\/20230622d4hitlquick-678x452.jpg 678w, https:\/\/spaceflightnow.com\/wp-content\/uploads\/2023\/06\/20230622d4hitlquick-768x512.jpg 768w\" sizes=\"auto, (max-width: 1200px) 100vw, 1200px\"><figcaption id=\"caption-attachment-62542\" class=\"wp-caption-text\">Liftoff of ULA\u2019s Delta 4-Heavy rocket on the NROL-68 mission. Credit: Michael Cain \/ Spaceflight Now \/ Coldlife Photography<\/figcaption><\/figure>\n<p>The final award of NSSL Phase 2 missions last year came as ULA and other launch providers are jockeying for the Phase 3 missions. Those will be split up into two lanes: Lane 1, which opens up opportunities for newer launch companies and smaller rockets and Lane 2, which requires a capability to launch payloads to any and all orbits.<\/p>\n<p>That second lane will have a 60-40 task order split with a carveout for seven missions for a total of up to three providers. Bruno said ULA will compete to win the 60 percent slice of the pie as they did with Phase 2, but said the 40 percent slice is fine as well.<\/p>\n<p>\u201cThey\u2019re all interesting missions. There\u2019s a lot more total missions in Phase 3 than there are in Phase 2. So, in terms of business-wise, it\u2019s great to be in either one,\u201d Bruno said. \u201cWe are going to go and bid on the ones for Lane 1 for any that we think we\u2019re competitive for and we\u2019d be good for.\u201d<\/p>\n<p>Bruno said that while Lane 1 is intended as a so-called \u201csandbox\u201d for launch providers, he was told that because of the number of missions that will be in Lane 1, that the government wants bigger players, like ULA, to bid on some of those missions as well.<\/p>\n<p>\u201cI think we\u2019ll scoop up some of these, where there\u2019s an urgent need and we\u2019re especially well-suited and maybe these other players just can\u2019t do it,\u201d Bruno said. \u201cThey can bid one at a time on any mission that they are comfortable and have the capability for, which is different than being in Lane 2, where you have to be able to fly everything in order to even bid.\u201d<\/p>\n<p>Looking ahead to Vulcan launches supporting NSSL missions, ULA is continuing work to convert Space Launch Complex 3 (SLC-3) at Vandenberg Space Force Base from an Atlas 5 pad into one for Vulcan.<\/p>\n<p>He said the Phase 3 contract will further increase the need for West Coast launches of Vulcan beyond what\u2019s required in Phase 2.<\/p>\n<p>\u201cThere are more missions in that timeframe going out of Vandenberg than there are now. And so, we\u2019re taking advantage of this quiescent period to reconfigure the pad for Vulcan, which is different from what you saw us do out here in Cape Canaveral, where we reconfigured the pad in between Atlas launches and configured it in order to be able to fly either rocket, back and forth,\u201d Bruno said.<\/p>\n<p>\u201cBut out at Vandenberg, it\u2019s a hard cut over. The last Atlas rocket\u2019s already gone out of there,\u201d he added. \u201cSo, the pad is down and we\u2019re constructing it for Vulcan uniquely. We\u2019ll be flying out of there and there will be more flights in that window of time out of Vandenberg than there are nowadays, obviously before the stop.\u201d<\/p>\n<figure id=\"attachment_59694\" aria-describedby=\"caption-attachment-59694\" style=\"width: 1200px\" class=\"wp-caption alignnone\"><img loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-59694\" src=\"http:\/\/spaceflightnow.com\/wp-content\/uploads\/2022\/11\/20221110atlas5jpss2-1.jpg\" alt=\"\" width=\"1200\" height=\"800\" srcset=\"https:\/\/spaceflightnow.com\/wp-content\/uploads\/2022\/11\/20221110atlas5jpss2-1.jpg 1200w, https:\/\/spaceflightnow.com\/wp-content\/uploads\/2022\/11\/20221110atlas5jpss2-1-300x200.jpg 300w, https:\/\/spaceflightnow.com\/wp-content\/uploads\/2022\/11\/20221110atlas5jpss2-1-678x452.jpg 678w, https:\/\/spaceflightnow.com\/wp-content\/uploads\/2022\/11\/20221110atlas5jpss2-1-768x512.jpg 768w\" sizes=\"auto, (max-width: 1200px) 100vw, 1200px\"><figcaption id=\"caption-attachment-59694\" class=\"wp-caption-text\">The final Atlas 5 rocket launches from Vandenberg Space Force Base on Nov. 10, 2022, carrying the JPSS-2 satellite onboard. File Photo: Alex Polimeni \/ Spaceflight Now<\/figcaption><\/figure>\n<p>Bruno said this new wave of launches that will be calling upon Vulcan is just one half of the equation for them as they start ramping up the commercial side of their business.<\/p>\n<p>\u201cWe\u2019re going to be super busy and our biggest challenge is not worrying about winning these contracts. It\u2019s about ramping up and building all the infrastructure and expanding the factories to keep up with that launch tempo,\u201d Bruno said.<\/p>\n<h4>Commercial buildup<\/h4>\n<p>The emergence of Vulcan into ULA\u2019s launch fleet begins a key shift for the company. It moves from one focused predominantly on government payloads to one with a roughly 50-50 split with commercial flights. Bruno said the equation is actually tipping slightly more towards the commercial side these days.<\/p>\n<p>He said about 70 percent of their commercial business is driven by their 47-launch contract with Amazon to launch its Kuiper satellite constellation. The tech giant purchased the final nine Atlas 5 flights available as well as 38 Vulcan flights.<\/p>\n<p>\u201cIf you asked me today, I would say it\u2019s 48 because we flew their prototype one and two mission as well, which was not originally part of our contract. But they needed us and they needed us in a hurry because those spacecraft go to orbit and they demonstrate certain key technologies for them,\u201d Bruno said. \u201cAnd it\u2019s to confirm the design path they\u2019re on as they were entering into high-rate production. So it was urgent, if you will.\u201d<\/p>\n<p>Originally, the two satellites were set to fly on an ABL RS1 rocket, which was later switched to be part of the first Vulcan flight. After the announcement of Vulcan\u2019s debut slipped from a May 4, 2023, opportunity, Amazon pivoted to the Atlas 5 rocket they launched on in September.<\/p>\n<p>\u201cIt was a five-month integration of flight, which is pretty short. The standard is you order your ride to space two years out. And doing it in five months was pretty challenging,\u201d Bruno said. \u201cAnd so, we stepped up and we did it for our customer, like a good partner, and I\u2019m glad we did because it was, again, a beautiful mission. But their mission was stellar as well.\u201d<\/p>\n<figure id=\"attachment_64023\" aria-describedby=\"caption-attachment-64023\" style=\"width: 678px\" class=\"wp-caption alignnone\"><img loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-64023\" src=\"http:\/\/spaceflightnow.com\/wp-content\/uploads\/2023\/10\/20231006-Atlas-5-launch-ascent-Michael.jpg\" alt=\"\" width=\"678\" height=\"452\" srcset=\"https:\/\/spaceflightnow.com\/wp-content\/uploads\/2023\/10\/20231006-Atlas-5-launch-ascent-Michael.jpg 678w, https:\/\/spaceflightnow.com\/wp-content\/uploads\/2023\/10\/20231006-Atlas-5-launch-ascent-Michael-300x200.jpg 300w\" sizes=\"auto, (max-width: 678px) 100vw, 678px\"><figcaption id=\"caption-attachment-64023\" class=\"wp-caption-text\">The Atlas 5 roars away from Cape Canaveral with the first Amazon Project Kuiper satellites. Image: Michael Cain\/Spaceflight Now.<\/figcaption><\/figure>\n<p>Bruno said once Vulcan starts flying Kuiper missions, it will launch 45 satellites with each flight. Atlas 5 rockets will carry 27 satellites each. Bruno said for these mega-satellite constellations, it\u2019s important to get as many satellites on orbit as quickly as possible.<\/p>\n<p>\u201cThey don\u2019t start being useful until you get about 60 to 70 percent of that first shell on orbit. So, you\u2019re building a lot of satellites and you\u2019re spending a lot of money and you\u2019re signing up subscribers, but you\u2019re not providing any service until you break that threshold,\u201d Bruno said. \u201cSo, the front end of this for a commercial application, like Kuiper, like OneWeb, anybody, Starlink, is you want to rapidly get them up there and hit that.\u201d<\/p>\n<p>Bruno said the other side of the equation for Amazon or other owners of these mega-constellations is what he described as the \u201cdollar per spacecraft on orbit.\u201d<\/p>\n<p>\u201cThe way people would talk about lift in the old days was dollars-per-kilogram, which by the way, was never ever meaningful, until now. Why wasn\u2019t it meaningful? Cause the rocket\u2019s the rocket and every mission that flies does not max out its mass capability, right?\u201d Bruno said.<\/p>\n<p>\u201cBut with small satellites in these mega-constellations, you really do fill up the whole payload fairing and fill up your mass capacity on every, single launch. And the more you fly, remember I said dollar-per-satellite, that\u2019s the denominator,\u201d he added. \u201cAnd so, it has a very powerful effect on the economic attractiveness of the lift part of the equation.\u201d<\/p>\n<p>In order to meet the demand from Amazon and future commercial partners, ULA is going through a large expansion of both its factory in Decatur, Alabama, as well as the support infrastructure along its supply chain.<\/p>\n<p><iframe loading=\"lazy\" title=\"ULA Vulcan Rocket First Flight - 4K launch replay\" width=\"678\" height=\"381\" src=\"https:\/\/www.youtube.com\/embed\/EVnMS3xJPc4?feature=oembed\" frameborder=\"0\" allow=\"accelerometer; autoplay; clipboard-write; encrypted-media; gyroscope; picture-in-picture; web-share\" allowfullscreen=\"\"><\/iframe><\/p>\n<p>On the factory side, Bruno said they are putting in a second production line to manufacture the Centaur 5 upper stages and placing them in their finished goods warehouse. They are also in the process of building a second transport barge that will be used alongside the Rocketship.<\/p>\n<p>\u201cWe\u2019ve let our subcontract to our ship builder, Bollinger. They\u2019re doing design work right now. Keel will be placed next year. And so, our mighty fleet of one Rocketship will become two Rocketships, so we\u2019re doubling the fleet,\u201d Bruno said. \u201cIt\u2019s actually a little bit more than doubling, capability-wise, because it\u2019s a bigger ship.\u201d<\/p>\n<p>Bruno teased that he already has a name picked out for the second ship, but will wait to disclose it at a later date.<\/p>\n<p>He added that at the Cape, the Spaceflight Processing Operations Center (SPOC), where the Vulcan Launch Platform (VLP) was built, is being converted into a second Vertical Integration Facility (VIF). That will allow for two rockets, either an Atlas and a Vulcan or two Vulcans, to be prepped for launches simultaneously. Bruno said that will be operational before the end of 2024.<\/p>\n<p>On the supply chain side, Bruno said that Northrop Grumman is \u201cessentially building a whole other rocket motor fabrication facility for us.\u201d He also noted that Blue Origin\u2019s 200,000-square-foot expansion to its rocket engine factory in Huntsville, Alabama is also nearing completion.<\/p>\n<p>During a May 25, 2023, Huntsville City Council meeting, a proposal to purchase 14.83 acres of land at Cummings Research Park near the current engine factory site was approved. Blue Origin purchased the land for $1,427,378.50, according to Shane Davis, Huntsville\u2019s director of urban and economic development.<\/p>\n<p>Both Aerojet Rocketdyne, the supplier of the RL10 upper stage engines, and L3Harris, which provides the avionics for Vulcan, are increasing their infrastructure as well to support the goal of launching Vulcan 25 times per year.<\/p>\n<p>\u201cWe don\u2019t hit the every two week tempo, 25 equivalent per year, until the back half of 2025,\u201d said Bruno. \u201cSo, if you were to come into our facilities and talk to our people, you\u2019d hear people talking about 25 in 25.\u201d<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The inaugural Vulcan rocket, powered by two Blue Origin-built BE-4 engines, lifts off from SLC-41 at Cape Canaveral Space Force Station on Jan. 8, 2024. Image: Adam Bernstein\/Spaceflight Now United Launch Alliance entered an important new era for the company with the debut of its Vulcan rocket in early January. The flight was one that [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":"","_links_to":"","_links_to_target":""},"categories":[2],"tags":[276,1017,1228,363,364],"class_list":["post-10185","post","type-post","status-publish","format-standard","hentry","category-news","tag-kuiper","tag-national-security-space-launch","tag-nssl","tag-ula","tag-vulcan"],"acf":[],"_links":{"self":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/10185"}],"collection":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/comments?post=10185"}],"version-history":[{"count":0,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/10185\/revisions"}],"wp:attachment":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/media?parent=10185"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/categories?post=10185"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/tags?post=10185"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}