{"id":11911,"date":"2021-01-15T22:33:53","date_gmt":"2021-01-15T14:33:53","guid":{"rendered":"https:\/\/wp-productionenv-bjg9h2g2bgg5b8aa.southeastasia-01.azurewebsites.net\/news\/nasa-proceeds-with-sls-booster-stacking-in-florida-before-core-stage-arrives\/"},"modified":"2021-01-15T22:33:53","modified_gmt":"2021-01-15T14:33:53","slug":"nasa-proceeds-with-sls-booster-stacking-in-florida-before-core-stage-arrives","status":"publish","type":"post","link":"https:\/\/starpath.global\/news\/nasa-proceeds-with-sls-booster-stacking-in-florida-before-core-stage-arrives\/","title":{"rendered":"NASA proceeds with SLS booster stacking in Florida before core stage arrives"},"content":{"rendered":"<figure id=\"attachment_49643\" aria-describedby=\"caption-attachment-49643\" style=\"width: 1200px\" class=\"wp-caption alignnone\"><img fetchpriority=\"high\" decoding=\"async\" class=\"size-full wp-image-49643\" src=\"http:\/\/spaceflightnow.com\/wp-content\/uploads\/2021\/01\/KSC-20210112-PH-KLS01_0009large.jpg\" alt=\"\" width=\"1200\" height=\"800\" srcset=\"https:\/\/spaceflightnow.com\/wp-content\/uploads\/2021\/01\/KSC-20210112-PH-KLS01_0009large.jpg 1200w, https:\/\/spaceflightnow.com\/wp-content\/uploads\/2021\/01\/KSC-20210112-PH-KLS01_0009large-300x200.jpg 300w, https:\/\/spaceflightnow.com\/wp-content\/uploads\/2021\/01\/KSC-20210112-PH-KLS01_0009large-768x512.jpg 768w, https:\/\/spaceflightnow.com\/wp-content\/uploads\/2021\/01\/KSC-20210112-PH-KLS01_0009large-678x452.jpg 678w\" sizes=\"(max-width: 1200px) 100vw, 1200px\"><figcaption id=\"caption-attachment-49643\" class=\"wp-caption-text\">In this Jan. 12 photo, the lower two segments of each Space Launch System solid rocket booster are seen stacked on the SLS Mobile Launcher inside the Vehicle Assembly Building. Credit: NASA\/Kim Shiflett<\/figcaption><\/figure>\n<p>NASA ground crews at the Kennedy Space Center are continuing to stack segments of the Space Launch System\u2019s side-mounted solid rocket boosters on a mobile launch platform inside the iconic Vehicle Assembly Building.<\/p>\n<p>The joints connecting each piece of the five-segment rocket motors are certified for one year once booster stacking begins, a clock that began ticking Jan. 7 with the hoisting of the SLS\u2019s left-hand aft center booster segment on top of the booster\u2019s lowermost piece.<\/p>\n<p>But the 12-month certification limit, a holdover from the space shuttle program, could be extended with an engineering review, according to John Honeycutt, NASA\u2019s Space Launch System program manager at the Marshall Space Flight Center in Alabama.<\/p>\n<p>The SLS boosters are derived from the space shuttle\u2019s solid rocket motors, and segments flying on the first SLS test launch have been refurbished from the shuttle program. The Northrop Grumman-built solid rocket boosters on the Space Launch System have five segments, while the shuttle\u2019s boosters had four segments with pre-packed solid propellants.<\/p>\n<p>The extra segment gives the SLS boosters more thrust during launch.<\/p>\n<p>Honeycutt said Jan. 12 that NASA decided to move forward with booster stacking at Kennedy before the test-firing of the SLS core stage at the Stennis Space Center in Mississippi. The hot fire test is planned Saturday at Stennis, followed by delivery of the core stage to Kennedy by barge before the end of February.<\/p>\n<p>Ground crews with NASA and Jacobs, the space agency\u2019s ground systems contractor at Kennedy, began stacking the five-segment boosters on the SLS mobile launch platform Nov. 20. Teams paused stacking operations after installing the aft booster assemblies, which include the rocket nozzles, on the mobile launch platform to wait for completion of a cryogenic tanking test on the SLS core stage in Mississippi.<\/p>\n<p>The core stage fueling test Dec. 20 was the penultimate test of the year-long \u201cGreen Run\u201d test campaign at Stennis, setting the stage for the core stage hot fire test Saturday.<\/p>\n<figure id=\"attachment_37656\" aria-describedby=\"caption-attachment-37656\" style=\"width: 985px\" class=\"wp-caption alignnone\"><img loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-37656\" src=\"http:\/\/spaceflightnow.com\/wp-content\/uploads\/2019\/03\/sls_block_1_expanded_view_orion_copy.jpg\" alt=\"\" width=\"985\" height=\"750\" srcset=\"https:\/\/spaceflightnow.com\/wp-content\/uploads\/2019\/03\/sls_block_1_expanded_view_orion_copy.jpg 985w, https:\/\/spaceflightnow.com\/wp-content\/uploads\/2019\/03\/sls_block_1_expanded_view_orion_copy-300x228.jpg 300w, https:\/\/spaceflightnow.com\/wp-content\/uploads\/2019\/03\/sls_block_1_expanded_view_orion_copy-768x585.jpg 768w, https:\/\/spaceflightnow.com\/wp-content\/uploads\/2019\/03\/sls_block_1_expanded_view_orion_copy-678x516.jpg 678w, https:\/\/spaceflightnow.com\/wp-content\/uploads\/2019\/03\/sls_block_1_expanded_view_orion_copy-80x60.jpg 80w\" sizes=\"(max-width: 985px) 100vw, 985px\"><figcaption id=\"caption-attachment-37656\" class=\"wp-caption-text\">This illustration shows the components of the Space Launch System\u2019s Block 1 configuration, which is the version scheduled to fly on the rocket\u2019s first mission, designated Artemis 1. Credit: NASA<\/figcaption><\/figure>\n<p>With the fueling rehearsal accomplished, NASA managers opted to go ahead with stacking the next two segments of the left-hand and right-hand boosters. Those were added on the Mobile Launcher inside High Bay 3 of the Vehicle Assembly Building on Jan. 7 and Jan. 12.<\/p>\n<p>\u201cSo far, it\u2019s gone smoothly, and we\u2019ve got the aft segments stacked on the (Mobile Launcher) as well as the aft-centers,\u201d Honeycutt told Spaceflight Now.<\/p>\n<p>With the stacking of the two aft-center segments, the 12-month certification clock will expire in January 2022. Honeycutt said this week that the SLS continues to work toward a launch date at the end of 2021.<\/p>\n<p>The Space Launch System will launch NASA\u2019s Orion crew capsule on an unpiloted mission to the moon, where the spacecraft will enter lunar orbit for a series of checkouts in deep space before returning to Earth for a parachute-assisted splashdown in the Pacific Ocean.<\/p>\n<p>It will be the first launch under NASA\u2019s Artemis program, which aims to land astronauts on the moon for the first time since 1972. A Trump administration goal to perform the next crewed lunar landing by the end of 2024 is unlikely to be continued by the Biden administration, and the scope of technical work and a lack of funding from Congress meant the window was already closing on achieving a lunar landing with astronauts in the next four years.<\/p>\n<p>If the first SLS\/Orion flight, known as Artemis 1, the second SLS\/Orion mission could launch in 2023 to send four astronauts around the moon and back to Earth. But development of a lunar lander to carry astronauts to the surface of the moon remains in the early stages.<\/p>\n<p>Nevertheless, the first launch of the 322-foot-tall (98-meter) Space Launch System, although years behind schedule and over budget, is a big step on NASA\u2019s effort to return astronauts to the moon. The powerful launcher\u2019s two solid rocket boosters and four hydrogen-fueled RS-25 core stage engines will generate up to 8.8 million pounds of thrust at liftoff, more than the thrust generated by the Apollo-era Saturn 5 moon rocket.<\/p>\n<p>Like the SLS core stage, the twin boosters will be expended on each mission. The shuttle boosters were recovered and reused, and the rocket motors on the Artemis 1 mission include hardware flown on 40 space shuttle missions.<\/p>\n<p>\u201cOur team is locked in and focused on delivering the rocket for a 2021 launch,\u201d Honeycutt said.<\/p>\n<figure id=\"attachment_45879\" aria-describedby=\"caption-attachment-45879\" style=\"width: 1500px\" class=\"wp-caption alignnone\"><img loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-45879\" src=\"http:\/\/spaceflightnow.com\/wp-content\/uploads\/2020\/06\/artemis1boosters.jpg\" alt=\"\" width=\"1500\" height=\"942\" srcset=\"https:\/\/spaceflightnow.com\/wp-content\/uploads\/2020\/06\/artemis1boosters.jpg 1500w, https:\/\/spaceflightnow.com\/wp-content\/uploads\/2020\/06\/artemis1boosters-300x188.jpg 300w, https:\/\/spaceflightnow.com\/wp-content\/uploads\/2020\/06\/artemis1boosters-768x482.jpg 768w, https:\/\/spaceflightnow.com\/wp-content\/uploads\/2020\/06\/artemis1boosters-678x426.jpg 678w\" sizes=\"(max-width: 1500px) 100vw, 1500px\"><figcaption id=\"caption-attachment-45879\" class=\"wp-caption-text\">Elements of the SLS solid rocket boosters for the Artemis 1 mission. Credit: Northrop Grumman<\/figcaption><\/figure>\n<p>But given the history of delays in the SLS program, and problems that often crop up during launch campaigns for new rockets, the risk of a further schedule slip is not insignificant.<\/p>\n<p>Honeycutt said engineers are making measurements and collecting data as ground teams stack each segment of the Artemis 1 boosters inside the Vehicle Assembly Building. The data could help NASA and Northrop Grumman, the booster manufacturer, extend the certification of the rocket motor joints beyond 12 months.<\/p>\n<p>\u201cWe\u2019re just having to be very conscious as we move through the stacking, making sure we take time to assess the data and making sure that we\u2019re ready to go stack the next segment,\u201d Honeycutt said. \u201cAnd then that gives us the best opportunity to do some sort of a life extension on the booster stacking in the event that we need that.\u201d<\/p>\n<p><b><i>Email the author.<\/i><\/b><\/p>\n<p><em><strong>Follow Stephen Clark on Twitter: @StephenClark1.<\/strong><\/em><\/p>\n","protected":false},"excerpt":{"rendered":"<p>In this Jan. 12 photo, the lower two segments of each Space Launch System solid rocket booster are seen stacked on the SLS Mobile Launcher inside the Vehicle Assembly Building. Credit: NASA\/Kim Shiflett NASA ground crews at the Kennedy Space Center are continuing to stack segments of the Space Launch System\u2019s side-mounted solid rocket boosters [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":"","_links_to":"","_links_to_target":""},"categories":[2],"tags":[304,1700,1826,1545,1923,428,25,1803],"class_list":["post-11911","post","type-post","status-publish","format-standard","hentry","category-news","tag-artemis","tag-artemis-1","tag-green-run","tag-human-spaceflight","tag-john-honeycutt","tag-kennedy-space-center","tag-launch","tag-marshall-space-flight-center"],"acf":[],"_links":{"self":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/11911"}],"collection":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/comments?post=11911"}],"version-history":[{"count":0,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/11911\/revisions"}],"wp:attachment":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/media?parent=11911"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/categories?post=11911"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/tags?post=11911"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}