{"id":13881,"date":"2018-04-09T21:56:46","date_gmt":"2018-04-09T13:56:46","guid":{"rendered":"https:\/\/wp-productionenv-bjg9h2g2bgg5b8aa.southeastasia-01.azurewebsites.net\/news\/boeing-proposes-extending-test-flight-of-commercial-crew-capsule\/"},"modified":"2018-04-09T21:56:46","modified_gmt":"2018-04-09T13:56:46","slug":"boeing-proposes-extending-test-flight-of-commercial-crew-capsule","status":"publish","type":"post","link":"https:\/\/starpath.global\/news\/boeing-proposes-extending-test-flight-of-commercial-crew-capsule\/","title":{"rendered":"Boeing proposes extending test flight of commercial crew capsule"},"content":{"rendered":"<figure id=\"attachment_31502\" aria-describedby=\"caption-attachment-31502\" style=\"width: 676px\" class=\"wp-caption alignnone\"><img fetchpriority=\"high\" decoding=\"async\" class=\" wp-image-31502\" src=\"http:\/\/spaceflightnow.com\/wp-content\/uploads\/2018\/04\/cst100_dock_art.jpg\" alt=\"\" width=\"676\" height=\"531\" srcset=\"https:\/\/spaceflightnow.com\/wp-content\/uploads\/2018\/04\/cst100_dock_art.jpg 900w, https:\/\/spaceflightnow.com\/wp-content\/uploads\/2018\/04\/cst100_dock_art-300x236.jpg 300w, https:\/\/spaceflightnow.com\/wp-content\/uploads\/2018\/04\/cst100_dock_art-768x603.jpg 768w, https:\/\/spaceflightnow.com\/wp-content\/uploads\/2018\/04\/cst100_dock_art-678x533.jpg 678w\" sizes=\"(max-width: 676px) 100vw, 676px\"><figcaption id=\"caption-attachment-31502\" class=\"wp-caption-text\">Artist\u2019s illustration of a CST-100 Starliner spacecraft docked at the International Space Station. Credit: Boeing<\/figcaption><\/figure>\n<p>NASA has agreed to consider a Boeing proposal to extend the first piloted test flight of its commercial CST-100 Starliner crew capsule from two weeks to up to six months with an extra crew member for the International Space Station, hedging against potential delays that could jeopardize U.S. crew access to the orbiting outpost, officials said last week.<\/p>\n<p>The U.S. space agency said Thursday it recently updated its contract with Boeing to enable the first test flight of the company\u2019s CST-100 Starliner crew ferry ship to remain at the space station for up to six months. The original plan called for a two-week test flight to the space station and back to Earth.<\/p>\n<p>In addition, the updated contract would allow NASA and Boeing to fly a third crew member on the CST-100 spacecraft\u2019s Crew Flight Test. Officials previously planned for the Crew Flight Test to carry a Boeing test pilot and a NASA astronaut.<\/p>\n<p>\u201cExact details of how to best take advantage of the contract modification are under evaluation, but the changes could allow for additional microgravity research, maintenance, and other activities while Starliner is docked to station,\u201d NASA said in a statement. \u201cAdding a third crew member on Boeing\u2019s flight test could offer NASA an additional opportunity to ensure continued U.S. access to the orbital laboratory.\u201d<\/p>\n<p>Boeing could also carry cargo to the space station abroad the CST-100 Starliner test flights under the terms of the updated contract.<\/p>\n<p>If exercised, the options for a longer-duration Crew Flight Test with an extra crew member could blunt the impact of delays in the readiness of Boeing and SpaceX capsules to begin regular crew rotation flights to and from the space station.<\/p>\n<p>The U.S.-built commercial crew craft will end NASA\u2019s reliance on Russian Soyuz spaceships to deliver astronauts to the space station and return them to Earth. NASA has secured Soyuz seats for U.S. astronauts and crew members from other station partners through 2019, but officials do not plan further Soyuz seat purchases.<\/p>\n<p>That puts the onus on Boeing and SpaceX to deliver.<\/p>\n<p>\u201cThis contract modification provides NASA with additional schedule margin if needed,\u201d said William Gerstenmaier, associate administrator of NASA\u2019s human exploration and operations mission directorate at NASA Headquarters in Washington. \u201cWe appreciate Boeing\u2019s willingness to evolve its flight to ensure we have continued access to space for our astronauts. Commercial space transportation to low-Earth orbit from U.S. soil is critical for the agency and the nation.\u201d<\/p>\n<p>NASA said it will consider a similar contract update with SpaceX, should the company propose one.<\/p>\n<p>The flight sequence currently planned by NASA, Boeing and SpaceX includes unpiloted test flights of the CST-100 Starliner and Crew Dragon spacecraft to dock with the space station, followed by demonstration flights with two-person crews. Each company plans one unpiloted test flight and one demo mission with an on-board crew.<\/p>\n<p>The latest schedule released by NASA indicates Boeing and SpaceX plan to launch their initial crew capsule test flights into orbit as soon as August \u2014 without a crew. Astronauts would strap into the CST-100 Starliner for its Crew Flight Test in November, followed by the first Crew Dragon test flight with humans on-board in December.<\/p>\n<p>But those mission schedules are optimistic, and they assume Boeing and SpaceX quicken their development pace in the coming months. In addition to the test flights to the space station, Boeing is finishing up structural testing and plans a pad abort test to verify the CST-100\u2019s escape rockets can safely get a crew away from an exploding rocket on the launch pad. SpaceX\u2019s upcoming work includes a vacuum test of the Crew Dragon spacecraft, final qualification of its parachutes and an in-flight abort test, designed to check the capsule\u2019s ability to get away from a launch failure after liftoff.<\/p>\n<p>\u201cI would say the schedule the contractors have laid out is aggressive,\u201d said Steve Stich, deputy manager of NASA\u2019s commercial crew program, in a briefing with reporters April 2. \u201cWhat we have seen from both Boeing and SpaceX is when we get to a point where maybe the dates are no longer supportable with what testing they have to do, then those dates get adjusted. The reason those dates get adjusted is the fact that there\u2019s work to complete to ensure those spacecraft are safe.\u201d<\/p>\n<p>After the successful completion of the crew demonstration flights, Boeing and SpaceX will be formally certified by NASA to begin regular crew rotation missions, carrying four astronauts at a time to and from the space station. The spacecraft will stay docked to the complex for up to seven months, serving as a lifeboat for the crew to escape in case of an emergency.<\/p>\n<p>NASA has a contract with Boeing worth up to $4.2 billion to complete development of the CST-100 crew capsule, conduct the two test flights to the space station, and fly up to six subsequent crew rotations. NASA\u2019s contract with SpaceX, covering Crew Dragon development, test flights and up to six crew rotations, is valued at up to $2.6 billion.<\/p>\n<p>Officials did not disclose how the updates to the Boeing contract could change the deal\u2019s monetary value.<\/p>\n<p>NASA says the cost-per-seat on the CST-100 and Crew Dragon capsules will average out at about $58 million. The Russian government charged NASA as much as $81 million per round-trip Soyuz ticket.<\/p>\n<p>Boeing\u2019s crew capsule will lift off on a United Launch Alliance Atlas 5 rocket from Cape Canaveral\u2019s Complex 41 launch pad, while SpaceX will launch its piloted missions on the company\u2019s own Falcon 9 booster from pad 39A, the former Apollo and space shuttle launch site at NASA\u2019s Kennedy Space Center.<\/p>\n<p>The CST-100 will return to Earth under parachutes for an airbag-cushioned landing at a site in New Mexico, Utah, California, or Arizona. The Crew Dragon will splash down in the Atlantic Ocean off of Florida\u2019s coast.<\/p>\n<p>\u201cTurning a test flight into more of an operational mission needs careful review by the technical community,\u201d Gerstenmaier said in a statement. \u201cFor example, the spacecraft capability to support the additional time still needs to be reviewed. Modifying the contract now allows NASA and Boeing an opportunity to tailor the duration to balance the mission needs with vehicle and crew capabilities.\u201d<\/p>\n<p>NASA said the current schedules, which project the Boeing and SpaceX crew ferry craft will be available for operational crew rotations in the spring of 2019, have about six months of margin before NASA\u2019s contract for Soyuz seats expires in the fall of 2019.<\/p>\n<p>But a review by the Government Accountability Office earlier this year said the certification schedules for both commercial crew vehicles was likely to fall well behind NASA\u2019s current timeline.<\/p>\n<p>Boeing and SpaceX aimed to fly their first human-rated spacecraft to the International Space Station in late 2016 and early 2017, with a goal of having both vehicles ready for operational missions by the end of 2017. But budget shortfalls from Congress, combined with technical hurdles encountered by both companies, delayed the test flights.<\/p>\n<p>\u201cIn fact, final certification dates have slipped to the first quarter of calendar year 2019 and we found that the program\u2019s own analysis indicates that certification is likely to slip into December 2019 for SpaceX and February 2020 for Boeing,\u201d said&nbsp;Cristina Chaplain, a senior manager at the Government Accountability Office, during a congressional hearing in January.<\/p>\n<p><b><i>Email the author.<\/i><\/b><\/p>\n<p><em><strong>Follow Stephen Clark on Twitter: @StephenClark1.<\/strong><\/em><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Artist\u2019s illustration of a CST-100 Starliner spacecraft docked at the International Space Station. Credit: Boeing NASA has agreed to consider a Boeing proposal to extend the first piloted test flight of its commercial CST-100 Starliner crew capsule from two weeks to up to six months with an extra crew member for the International Space Station, [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":"","_links_to":"","_links_to_target":""},"categories":[2],"tags":[724,670,524,291,1200,1565,1545,717],"class_list":["post-13881","post","type-post","status-publish","format-standard","hentry","category-news","tag-atlas-5","tag-boeing","tag-commercial-crew","tag-commercial-space","tag-crew-flight-test","tag-cst-100","tag-human-spaceflight","tag-international-space-station"],"acf":[],"_links":{"self":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/13881"}],"collection":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/comments?post=13881"}],"version-history":[{"count":0,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/13881\/revisions"}],"wp:attachment":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/media?parent=13881"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/categories?post=13881"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/tags?post=13881"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}