{"id":15217,"date":"2016-09-21T19:14:30","date_gmt":"2016-09-21T11:14:30","guid":{"rendered":"https:\/\/wp-productionenv-bjg9h2g2bgg5b8aa.southeastasia-01.azurewebsites.net\/news\/officials-target-mid-october-for-first-launch-of-upgraded-antares-cargo-rocket-2\/"},"modified":"2016-09-21T19:14:30","modified_gmt":"2016-09-21T11:14:30","slug":"officials-target-mid-october-for-first-launch-of-upgraded-antares-cargo-rocket-2","status":"publish","type":"post","link":"https:\/\/starpath.global\/news\/officials-target-mid-october-for-first-launch-of-upgraded-antares-cargo-rocket-2\/","title":{"rendered":"Officials target mid-October for first launch of upgraded Antares cargo rocket"},"content":{"rendered":"<figure id=\"attachment_18734\" aria-describedby=\"caption-attachment-18734\" style=\"width: 675px\" class=\"wp-caption alignnone\"><img fetchpriority=\"high\" decoding=\"async\" class=\" wp-image-18734\" src=\"http:\/\/spaceflightnow.com\/wp-content\/uploads\/2016\/09\/CYGNUSMATE-1024x683.jpg\" alt=\"The Italian-built pressurized cargo module and U.S.-built service module of the next Cygnus spacecraft were mated earlier this year at Wallops. Credit: NASA\/Patrick Black\" width=\"675\" height=\"450\" srcset=\"https:\/\/spaceflightnow.com\/wp-content\/uploads\/2016\/09\/CYGNUSMATE-1024x683.jpg 1024w, https:\/\/spaceflightnow.com\/wp-content\/uploads\/2016\/09\/CYGNUSMATE-1024x683-300x200.jpg 300w, https:\/\/spaceflightnow.com\/wp-content\/uploads\/2016\/09\/CYGNUSMATE-1024x683-768x512.jpg 768w\" sizes=\"(max-width: 675px) 100vw, 675px\"><figcaption id=\"caption-attachment-18734\" class=\"wp-caption-text\">The Italian-built pressurized cargo module and U.S.-built service module of the next Cygnus spacecraft were mated earlier this year at Wallops. Credit: NASA\/Patrick Black<\/figcaption><\/figure>\n<p>Orbital ATK ground crews in Virginia are fueling the next Cygnus cargo freighter this week for launch toward the International Space Station in mid-October on the first flight of the company\u2019s upgraded Antares rocket in two years.<\/p>\n<p>The commercial supply ship is scheduled for liftoff on top of an Antares rocket between Oct. 9 and Oct. 13 from the Mid-Atlantic Regional Spaceport at NASA\u2019s Wallops Flight Facility on the Eastern Shore of Virginia.<\/p>\n<p>If the launch occurs Oct. 9, liftoff is timed for 10:47 p.m. EDT (0247 GMT on Oct. 10), roughly the moment the space station\u2019s orbital track passes over the spaceport.<\/p>\n<p>When the Antares booster blasts off, it will be flying for the first time since a fiery launch failure in October 2014 that left the rocket grounded for nearly two years. Since the failure, Orbital ATK has replaced the decades-old AJ26 engines blamed for the mishap with newly-built Russian RD-181 engines and repaired the damaged launch pad.<\/p>\n<p>In a major step toward next month\u2019s launch, technicians transported the Cygnus spacecraft Monday night from a clean room on the mainland at Wallops Flight Facility to a fueling facility on nearby Wallops Island.<\/p>\n<figure id=\"attachment_18733\" aria-describedby=\"caption-attachment-18733\" style=\"width: 675px\" class=\"wp-caption alignnone\"><img loading=\"lazy\" decoding=\"async\" class=\" wp-image-18733\" src=\"http:\/\/spaceflightnow.com\/wp-content\/uploads\/2016\/09\/14409633_1377896245573806_5383701380527040460_o.jpg\" alt=\"The Cygnus spacecraft, positioned inside a transporter, moved to a fueling facility Monday night at Wallops Island, Virginia. Credit: NASA\/Allison Stancil\" width=\"675\" height=\"1013\" srcset=\"https:\/\/spaceflightnow.com\/wp-content\/uploads\/2016\/09\/14409633_1377896245573806_5383701380527040460_o.jpg 640w, https:\/\/spaceflightnow.com\/wp-content\/uploads\/2016\/09\/14409633_1377896245573806_5383701380527040460_o-200x300.jpg 200w\" sizes=\"(max-width: 675px) 100vw, 675px\"><figcaption id=\"caption-attachment-18733\" class=\"wp-caption-text\">The Cygnus spacecraft, positioned inside a transporter, moved to a fueling facility Monday night at Wallops Island, Virginia. Credit: NASA\/Allison Stancil<\/figcaption><\/figure>\n<p>Workers are loading toxic hydrazine and nitrogen tetroxide propellants into the Cygnus service module ahead of another move early next week to deliver the spacecraft to Orbital ATK\u2019s Horizontal Integration Facility, where ground crews will install the ship\u2019s final cargo load and mate it to the upper stage of the Antares rocket, then add the launcher\u2019s nose fairing.<\/p>\n<p>The flight will be the sixth of 11 Orbital ATK logistics missions to the space station through 2018 under a multibillion-dollar contract to NASA. Orbital ATK and NASA have a separate contract for at least six additional cargo flights from 2019 through 2024.<\/p>\n<p>NASA is still finalizing the equipment technicians will pack into the Cygnus spacecraft\u2019s pressurized cargo module before launch, but the upcoming mission \u2014 known as OA-5 \u2014 is expected to haul more than 5,000 pounds (about 2,273 kilograms) of provisions, experiments and other hardware to the space station, according to the agency\u2019s latest manifest.<\/p>\n<p>That figure could change slightly based on the final cargo load, a NASA spokesperson said.<\/p>\n<p>NASA officials are eager for the Antares rocket to resume flights as all of the space station\u2019s other servicing vehicles are facing delays.<\/p>\n<p>SpaceX\u2019s Falcon 9 rocket, which launches the company\u2019s Dragon cargo craft, is grounded after a launch pad explosion Sept. 1, and Dragon resupply missions to the space station may not start up again until early next year.<\/p>\n<p>The Japanese HTV cargo freighter was supposed to blast off Sept. 30 with several tons of supplies, including new lithium-ion batteries for the space station\u2019s electrical system. But that launch has been delayed until at least December after Japanese engineers discovered a leak during an air tightness test in August.<\/p>\n<figure id=\"attachment_18735\" aria-describedby=\"caption-attachment-18735\" style=\"width: 675px\" class=\"wp-caption alignnone\"><img loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-18735\" src=\"http:\/\/spaceflightnow.com\/wp-content\/uploads\/2016\/09\/14646973782_e4bd16f013_k.jpg\" alt=\"File photo of a previous Antares launch. Credit: Orbital ATK\" width=\"675\" height=\"489\" srcset=\"https:\/\/spaceflightnow.com\/wp-content\/uploads\/2016\/09\/14646973782_e4bd16f013_k.jpg 675w, https:\/\/spaceflightnow.com\/wp-content\/uploads\/2016\/09\/14646973782_e4bd16f013_k-300x217.jpg 300w\" sizes=\"(max-width: 675px) 100vw, 675px\"><figcaption id=\"caption-attachment-18735\" class=\"wp-caption-text\">File photo of a previous Antares launch. Credit: Orbital ATK<\/figcaption><\/figure>\n<p>And the Soyuz crew capsule that was slated to launch Friday could have to wait until early November to fly due to a short circuit that requires repairs. The Soyuz delay could impact a Russian Progress resupply mission that was scheduled for liftoff Oct. 20.<\/p>\n<p>The space station has plenty of supplies to keep the crew healthy and busy for the next few months, but the recent SpaceX and HTV delays occurred just as the orbiting research lab\u2019s stockpiles were nearly replenished after a series of U.S. and Russian launch failures in 2014 and 2015.<\/p>\n<p>\u201cIn terms of spares on orbit, critical spares for hardware, I would say we\u2019re close. We\u2019re not quite recovered,\u201d said Kirk Shireman, NASA\u2019s space station program manager, in a Sept. 1 interview. \u201cIn terms of food, water and science, yes. Our No. 1 priority was, of course, we want to keep the crew healthy, but it was really also science. And then it was building back up the spare posture we\u2019d like to have on orbit, and we\u2019re close to that.<\/p>\n<p>\u201cAntares 230 is about to fly for the very first time, so I don\u2019t think our supply chain is really back to normal,\u201d Shireman said, referring to the Antares rocket configuration with its new RD-181 engines. \u201cWe are looking forward to Antares flying quickly, and at that point we would feel comfortable. We\u2019d feel that our supply chain is where we expected it to be.\u201d<\/p>\n<p>Engineers this summer have resolved several technical problems related to the new engines and their performance with the Antares rocket, including vibrations detected during a hold-down engine firing at the Wallops launch pad in May.<\/p>\n<p>\u201cThey noticed some vibration at a specific throttle setting, so the decision was made to not dwell at that throttle setting,\u201d Shireman said. \u201cYou can transition through that throttle setting, but you don\u2019t dwell where you have vibration levels higher than anticipated. They made that change, so I think they\u2019ve recovered from that particular issue.\u201d<\/p>\n<p>Shireman called the new upgraded Antares booster essentially \u201ca brand new rocket,\u201d and NASA is being careful about what it puts aboard the redesigned rocket on its first flight.<\/p>\n<p>\u201cIn terms of what we put on-board, we do a risk trade,\u201d Shireman said. \u201cThat risk trade is not a static risk trade. It changes all the time. We look at what are our needs on orbit at any given time, what are the other vehicles that are coming, and what do we think the risk is for that particular launch. Based on all that calculation, we\u2019ll assign cargo.<\/p>\n<p>\u201cWe are flying cargo thats really important to get to ISS, but by the same token, we\u2019re trying to avoid flying one-of-a-kind assets that can\u2019t be replaced or can\u2019t be replaced without a long lead time,\u201d Shireman said. \u201cWe\u2019ve done this risk trade and balanced all the risks.\u201d<\/p>\n<p><b><i>Email the author.<\/i><\/b><\/p>\n<p><em><strong>Follow Stephen Clark on Twitter: @StephenClark1.<\/strong><\/em><\/p>\n","protected":false},"excerpt":{"rendered":"<p>The Italian-built pressurized cargo module and U.S.-built service module of the next Cygnus spacecraft were mated earlier this year at Wallops. Credit: NASA\/Patrick Black Orbital ATK ground crews in Virginia are fueling the next Cygnus cargo freighter this week for launch toward the International Space Station in mid-October on the first flight of the company\u2019s [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":"","_links_to":"","_links_to_target":""},"categories":[2],"tags":[1871,639,3346,717,1602,1698,3522,2899],"class_list":["post-15217","post","type-post","status-publish","format-standard","hentry","category-news","tag-antares","tag-cygnus","tag-expedition-49","tag-international-space-station","tag-iss-cargo","tag-mid-atlantic-regional-spaceport","tag-oa-5","tag-orbital-atk"],"acf":[],"_links":{"self":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/15217"}],"collection":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/comments?post=15217"}],"version-history":[{"count":0,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/15217\/revisions"}],"wp:attachment":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/media?parent=15217"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/categories?post=15217"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/tags?post=15217"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}