{"id":24058,"date":"2024-04-02T17:28:11","date_gmt":"2024-04-02T09:28:11","guid":{"rendered":"https:\/\/wp-productionenv-bjg9h2g2bgg5b8aa.southeastasia-01.azurewebsites.net\/news\/nasa-lockheed-martin-working-to-resolve-artemis-ii-orion-issues-deliver-spacecraft-around-summers-end\/"},"modified":"2024-04-02T17:28:11","modified_gmt":"2024-04-02T09:28:11","slug":"nasa-lockheed-martin-working-to-resolve-artemis-ii-orion-issues-deliver-spacecraft-around-summers-end","status":"publish","type":"post","link":"https:\/\/starpath.global\/news\/nasa-lockheed-martin-working-to-resolve-artemis-ii-orion-issues-deliver-spacecraft-around-summers-end\/","title":{"rendered":"NASA, Lockheed Martin working to resolve Artemis II Orion issues, deliver spacecraft around summer\u2019s end"},"content":{"rendered":"<p>NASA is working with Orion spacecraft prime contractor Lockheed Martin to resolve a handful of issues that came up late last year during ground testing, forcing the space agency to delay the launch readiness target date for its Artemis II circumlunar mission to September 2025. The Lockheed Martin assembly, test, and launch operations (ATLO) team at Kennedy Space Center (KSC) is reinstalling some electronics and implementing workarounds for others affected by an electrical circuit flaw found in digital motor controllers on the spacecraft.<\/p>\n<p>While a resolution to that issue appears to be getting closer, the Orion program and contractor teams are also working through the corrective actions process for a problem with how the Orion batteries handle the shock of an extreme abort case. Resolution of both issues will be necessary to allow Lockheed Martin\u2019s production team to move towards finishing assembly and test of the spacecraft before turning it over to Exploration Ground Systems (EGS) for Artemis II launch processing. Currently, the teams are working to meet the EGS handover milestone around the end of summer this year.<\/p>\n<\/p>\n<p>Installing electrical circuitry fixes, implementing workarounds<\/p>\n<p>Since completing the Artemis I mission to the Moon in December 2022, NASA has been aiming for readiness to launch Artemis II on a lunar flyby mission at the end of 2024. However, old and new issues have delayed that target date to September 2025. Artemis II will be the first crewed mission for the Exploration Ground Systems (EGS), Orion, and Space Launch System (SLS) programs, with the four-person crew of astronauts preparing for a 10-day circumlunar flight.<\/p>\n<\/p>\n<p><iframe title=\"Orion Heatshield Aftermath Following Lunar Return | Artemis I\" src=\"https:\/\/www.youtube.com\/embed\/crcxsmXRMDY?feature=oembed\" frameborder=\"0\" allow=\"accelerometer; autoplay; clipboard-write; encrypted-media; gyroscope; picture-in-picture; web-share\" referrerpolicy=\"strict-origin-when-cross-origin\" allowfullscreen=\"\" name=\"fitvid0\" data-gtm-yt-inspected-13=\"true\" data-gtm-yt-inspected-21=\"true\"><\/iframe><\/p>\n<p>NASA noted in March 2023 that it was investigating the liberation of some material from Orion\u2019s base heatshield during the Artemis I re-entry to Earth\u2019s atmosphere. That investigation is expected to continue through the spring of this year. Two new issues with Orion came up near the end of 2023 that are also factoring into the delay, one with the design of a spacecraft electronics circuit and one with the durability of the batteries to withstand the forces of an extreme abort case.<\/p>\n<p>\u201cAt this point, we drove that September [2025] date based on the time we think it\u2019s going to take to do the removal [and] replacement of the life support system electronics and the penalty testing required to do the integration on the way back out,\u201d Amit Kshatriya, NASA deputy associate administrator for the Moon to Mars Program, said in the Jan. 9 audio conference with the media announcing the delay. \u201cWe\u2019re hopeful that the other findings that are as a result of abort loads on the battery, as well as the conclusion of all the tests required for the heatshield, is enveloped by that work.\u201d<\/p>\n<p>Spaceflight news subscription<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>Space Shuttle<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>Aerospace &amp; Defense<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>\n<p>     (adsbygoogle = window.adsbygoogle || []).push({});<\/p>\n<p>Rescheduling the assembly, test, and launch processing timelines has to take into account not only the time to fix the issues, build new parts assemblies, and reinstall them but also the time needed to retest everything that needs to be undone and reconnected for those reinstalls.<\/p>\n<p>\u201cSince the [media audio conference in January], we were working through the resolution on the motor control side and completely finishing up the battery investigation, so they\u2019re both proceeding well,\u201d Kshatriya said in a March 22 interview with NSF. \u201cI would say there\u2019s nothing I\u2019ve seen in the recovery plans or the test plans that would give me any pause that we\u2019re not going to be able to hold that date that we pushed out in January, with some margin.\u201d<\/p>\n<p>The issue with the design of an electrical circuit was found during acceptance testing of an air ventilation and temperature controller (AVTC) unit that was assigned to the Orion spacecraft in production for Artemis III. The electronics in particular are used to command motors that control the position of valves in different environmental control and life support systems (ECLSS).<\/p>\n<p><img fetchpriority=\"high\" decoding=\"async\" aria-describedby=\"caption-attachment-99097\" class=\"wp-image-99097 size-full\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2024\/03\/02-28-24-Artemis-II-Recovery-Presser-8657-watermarked.jpg\" alt=\"\" width=\"2048\" height=\"1366\" srcset=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2024\/03\/02-28-24-Artemis-II-Recovery-Presser-8657-watermarked.jpg 2048w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2024\/03\/02-28-24-Artemis-II-Recovery-Presser-8657-watermarked-350x233.jpg 350w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2024\/03\/02-28-24-Artemis-II-Recovery-Presser-8657-watermarked-525x350.jpg 525w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2024\/03\/02-28-24-Artemis-II-Recovery-Presser-8657-watermarked-768x512.jpg 768w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2024\/03\/02-28-24-Artemis-II-Recovery-Presser-8657-watermarked-1920x1281.jpg 1920w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2024\/03\/02-28-24-Artemis-II-Recovery-Presser-8657-watermarked-1170x780.jpg 1170w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2024\/03\/02-28-24-Artemis-II-Recovery-Presser-8657-watermarked-585x390.jpg 585w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2024\/03\/02-28-24-Artemis-II-Recovery-Presser-8657-watermarked-263x175.jpg 263w\" sizes=\"(max-width: 2048px) 100vw, 2048px\"><\/p>\n<p id=\"caption-attachment-99097\" class=\"wp-caption-text\">Credit: Jack Beyer for NSF.<\/p>\n<p><em>(Photo Caption: The Artemis II flight crew is seen in front of a crew module test article in San Diego after recovery training off the coast in February. From left to right, Mission Specialists Jeremy Hansen and Christina Koch, Commander Reid Wiseman, and Pilot Victor Glover.)<\/em><\/p>\n<p>\u201cWhat they do as a part of acceptance is they do an overcurrent test to make sure that the motor circuitry\u2019s internal circuit protection is intact, so we can deal with an overcurrent,\u201d Kshatriya explained. \u201cThat condition was stressing to this particular design flaw, because the way you do that is you put a really high output current and really kind of severe voltage on the output of the motor and so that kind of gives you a stressing \u2018back EMF (electromotive force)\u2019 case. In that particular case, [the part] just hard failed, like right off the bat, and so that\u2019s where it was like \u2018whoa, what happened?&#8217;\u201d<\/p>\n<h4 class=\"widget-title penci-border-arrow\">See Also<\/h4>\n<ul>\n<li>Artemis Forum Section<\/li>\n<li>NSF Store<\/li>\n<li>L2 Artemis<\/li>\n<li>Click here to Join L2<\/li>\n<\/ul>\n<p>\u201cThe circuit that was impugned was a motor drive for [a direct-current] motor,\u201d he added. \u201cIn any electric motor drive design, you have to take into account when the drive circuitry is in communication with the output of this motor, you\u2019re going to get \u2018back EMF\u2019 from whatever you\u2019re driving.\u201d<\/p>\n<p>\u201cThese parts are rated to get reverse voltage, that\u2019s not the issue, what you want to make sure is that you don\u2019t do it in a way that exceeds the part rating and so we found some errors in that design that was allowing stray voltage to linger on that side of the circuit. The fix is pretty simple, you basically\u2026mount some capacitors and resistors to wash that voltage out, so that\u2019s why it was so easy to turn around.\u201d<\/p>\n<p>\u201cNow, when you [do that] you\u2019ve got to be careful about how you re-accept it,\u201d he explained. \u201cSo, we\u2019re re-accepting and doing a full acceleration of [vibration] and all of the [qualification and acceptance testing] on the new cards.\u201d<\/p>\n<p>\u201cThey finished all that work in the last three months, did the re-acceptance, shook it, did all the thermal sweeps, screened it for workmanship, and it\u2019s over there at KSC.\u201d<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-99215\" class=\"size-full wp-image-99215\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2024\/03\/KSC-20231019-PH-ALS01_0002orig-scaled.jpg\" alt=\"\" width=\"2560\" height=\"1707\" srcset=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2024\/03\/KSC-20231019-PH-ALS01_0002orig-scaled.jpg 2560w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2024\/03\/KSC-20231019-PH-ALS01_0002orig-350x233.jpg 350w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2024\/03\/KSC-20231019-PH-ALS01_0002orig-525x350.jpg 525w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2024\/03\/KSC-20231019-PH-ALS01_0002orig-768x512.jpg 768w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2024\/03\/KSC-20231019-PH-ALS01_0002orig-1920x1280.jpg 1920w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2024\/03\/KSC-20231019-PH-ALS01_0002orig-1170x780.jpg 1170w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2024\/03\/KSC-20231019-PH-ALS01_0002orig-585x390.jpg 585w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2024\/03\/KSC-20231019-PH-ALS01_0002orig-263x175.jpg 263w\" sizes=\"(max-width: 2560px) 100vw, 2560px\"><\/p>\n<p id=\"caption-attachment-99215\" class=\"wp-caption-text\">Credit: NASA\/Amanda Stevenson<\/p>\n<p><em>(Photo Caption: The Artemis II Orion crew and service modules are mated in the Neil Armstrong Operations and Checkout Building at KSC in October 2023.)<br \/>\n<\/em><\/p>\n<p>The circuit is common to digital motor electronics in ECLSS controllers in different locations on the crew module (CM) and crew module adapter (CMA). Some of the electronics boxes are hard to reach, but their life support functionality is so critical that the bad circuits had to be fixed and replaced.<\/p>\n<p>In other cases, the risks could be mitigated with operational workarounds. \u201cWe went through kind of [an assessment of the] disposition, system-by-system, where these circuit cards exist and there are a couple of cases where you can\u2019t get there, in terms of [justifying] use as-is, and you have to [replace them],\u201d Kshatriya explained. \u201cA couple of them you can [apply workarounds] because of the margin we have in the thermal system.\u201d<\/p>\n<p>Fixes were implemented for digital motor controllers in the AVTC box for carbon dioxide (CO2) and humidity control (CHC) valves and also for circuits in an oxygen regulator assembly (O2RA) controller.<\/p>\n<p>\u201c[For] the CO2 controller and the O2 regulator, those are kind of like \u2018must-work\u2019 anyway,\u201d Kshatryia said. \u201cEven if you have good confidence that whatever unknown defects are well-bounded, and you have redundancy, you still have to fix it because it\u2019s in direct communication with the crew.\u201d<\/p>\n<p>\u201cSo, it didn\u2019t matter what the access was for those, we were just going to go after it anyway, because there\u2019s no real workaround. We have a lot of cases where we want to make sure we can deal with all sorts of contingencies, in terms of depressurization, etc., so these are all must-work, and we just have to go fix it. The thermal control ones [were] a little more fungible, [and the] cabin fan was kind of the same way.\u201d<\/p>\n<p>The remove and replace (R&amp;R) of the AVTC boxes was challenging because it would require a significant amount of breakdown and disassembly of wiring and other equipment inside the crew module. However, the Orion team came up with a workaround to bypass a lot of that disassembly by leaving the existing box in place and mounting the replacement in a different location.<\/p>\n<p>\u201cWe\u2019re essentially bypassing it, the current config, so we\u2019re not taking out the old controller, because it\u2019s so far buried in the ECLSS bay,\u201d Kshatriya said. \u201cWe\u2019d have to do a bunch of \u2018penalty\u2019 testing on the way back out as we broke all the connections and then back in again, so we just decided to mount the replacement in a different location and bypass the current controller that\u2019s in the spacecraft.\u201d<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-99099\" class=\"wp-image-99099 size-full\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2024\/03\/KSC-20240223-PH-RNS01_0002large.jpg\" alt=\"\" width=\"1920\" height=\"1280\" srcset=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2024\/03\/KSC-20240223-PH-RNS01_0002large.jpg 1920w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2024\/03\/KSC-20240223-PH-RNS01_0002large-350x233.jpg 350w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2024\/03\/KSC-20240223-PH-RNS01_0002large-525x350.jpg 525w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2024\/03\/KSC-20240223-PH-RNS01_0002large-768x512.jpg 768w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2024\/03\/KSC-20240223-PH-RNS01_0002large-1170x780.jpg 1170w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2024\/03\/KSC-20240223-PH-RNS01_0002large-585x390.jpg 585w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2024\/03\/KSC-20240223-PH-RNS01_0002large-263x175.jpg 263w\" sizes=\"(max-width: 1920px) 100vw, 1920px\"><\/p>\n<p id=\"caption-attachment-99099\" class=\"wp-caption-text\">Credit: NASA\/Rad Sinyak.<\/p>\n<p><em>(Photo Caption: An image from inside the Artemis II Orion crew module shows some of the equipment installed around the hatchway. Circuitry in some crew module electronics was repaired after one of the boxes failed an acceptance test last year.)<\/em><\/p>\n<p>The fully mated Orion \u201cshort stack\u201d for Artemis II is currently in the Final Assembly System Test (FAST) cell in the Neil Armstrong Operations and Checkout (O&amp;C) Building at KSC. The crew and service modules were mated last October, with the service module (SM) already mated to the Orion spacecraft adapter cone. The Lockheed Martin ATLO team is performing integrated testing of the spacecraft in the FAST cell, in addition to the electronics maintenance and repair work.<\/p>\n<p>\u201cThe hardest one to deal with was the AVTC, the CO2 humidity control valve, that\u2019s the one that requires offloading and the de-integration of some of [the internals], but they mitigated a lot of that by implementing this bypass solution. They have to break some connections and they had to do some work on where to mount it in the spacecraft because it\u2019s a new mounting location.\u201d<\/p>\n<p>\u201cYou want to make sure all the environments are attenuated by the position, so we had to go through that exercise, but that didn\u2019t require a lot of hardware to be removed, that was primarily analytical work,\u201d he added. \u201cSo that\u2019s where we are there, the team has already turned around the fix. The hardware is in hand and if I\u2019m not mistaken, they\u2019ve already gone after the O2RA controller and they\u2019re going to go after the bypass next.\u201d<\/p>\n<p>\u201cIf it\u2019s not already at KSC, it\u2019ll be there in the next few days, to go do that work.\u201d<\/p>\n<p>For other valve controllers affected by the electrical circuit flaw, like the flow control valve, it was possible to implement an operational workaround. Kshatriya explained that the related controller is in the crew module adapter and is inaccessible while the crew and service modules are mated. \u201c[The flow control valve] is the interface between the internal and external cooling loops,\u201d he said.<\/p>\n<p>\u201c[It\u2019s] in the crew module adapter, which is kind of the most odious to access, that would require destacking the CM and the SM. Fortunately, that\u2019s the one that we can just peg at a fixed position, and that gives you full capability in terms of thermal control, and we have redundant valves in the circuit that allow us to modulate that control.\u201d<\/p>\n<p>\u201cI don\u2019t know the exact value, but it\u2019s at some intermediate position,\u201d he added. \u201cWe [would] de-energize the valve and would just allow nominal flow, almost like a bulkhead feed-through, so that one we don\u2019t need to worry about it, because we were worried about it enough to make sure we had the right thermal analysis. We went through all that and convinced ourselves it was fine.\u201d<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-99101\" class=\"wp-image-99101 size-full\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2024\/03\/KSC-20240223-PH-RNS01_0001large.jpg\" alt=\"\" width=\"1920\" height=\"1280\" srcset=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2024\/03\/KSC-20240223-PH-RNS01_0001large.jpg 1920w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2024\/03\/KSC-20240223-PH-RNS01_0001large-350x233.jpg 350w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2024\/03\/KSC-20240223-PH-RNS01_0001large-525x350.jpg 525w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2024\/03\/KSC-20240223-PH-RNS01_0001large-768x512.jpg 768w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2024\/03\/KSC-20240223-PH-RNS01_0001large-1170x780.jpg 1170w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2024\/03\/KSC-20240223-PH-RNS01_0001large-585x390.jpg 585w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2024\/03\/KSC-20240223-PH-RNS01_0001large-263x175.jpg 263w\" sizes=\"(max-width: 1920px) 100vw, 1920px\"><\/p>\n<p id=\"caption-attachment-99101\" class=\"wp-caption-text\">Credit: NASA\/Rad Sinyak.<\/p>\n<p><em>(Photo Caption: A recent view of the Artemis II crew module adapter, European Service Module, and spacecraft adapter in the Final Assembly System Test cell of the O&amp;C Building at KSC.)<\/em><\/p>\n<p>The Artemis II electronics boxes that had circuitry with the same design had passed the acceptance test that the AVTC box for Artemis III failed. Kshatriya said that the electronics boards came from different suppliers.<\/p>\n<p>\u201cEspecially when you\u2019re doing EEE (electrical, electronic, electromechanical) parts, these junctions, there\u2019s a lot of lot variability in these parts that you get,\u201d Kshatriya explained. He said the failure occurred in \u201ca PNP (positive-negative-positive) junction I think it was in a MOSFET (metal\u2013oxide\u2013semiconductor field-effect transistor).\u201d<\/p>\n<p>\u201c[The electronics board for the Artemis III box] that failed during [the] test was a different manufacturer, different lot, so there was what we call parts separation between the two boards, even though the design was identical. With these boards, it could very well have been we just got some really robust components for the Artemis II board and then when we cut in the other ones, they matched the spec but every once in a while, you just get a great part, and you know you can prove this to yourself.\u201d<\/p>\n<p>\u201cAnd in fact, we are doing this also, because this is what we do, we love data,\u201d he added. \u201cWe have these parts on the ground, still, from the same lot, in the Artemis II config. Our EEE parts guys and our avionics guys are some of the best in the world, so they\u2019re going to run a fleet leader test and just bang away at these things and see what happens.\u201d<\/p>\n<p>Looking at improving new batteries to handle extreme abort shock<\/p>\n<p>The issue with the Orion batteries came up more recently. Rather than in an acceptance test, it was during a qualification test in December. A part of certifying the human-rating of the Artemis II Orion configuration is verifying that it meets all the requirements for abort scenarios.<\/p>\n<p>The qualification test was performed at the component level, subjecting the battery by itself to the loads of a sudden, intense shock that it might see in an extreme launch abort case. \u201cWhat we saw in the qualification test was we subjected that battery to the full separation shock that we would expect for the spacecraft coming off of the launch vehicle under the worst possible loss of control and in that case, we saw a loss of, in some cases, connector connectivity,\u201d Kshatriya said in the Jan. 9 audio conference.<\/p>\n<p>\u201cThe concern would be not that the vehicle would be able to abort safely off of SLS, but that we would be able to maintain all of the power margin that we need for the vehicle from that separation all the way through landing.\u201d<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-99102\" class=\"wp-image-99102 size-full\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2024\/03\/KSC-20231019-PH-ALS01_0002crop.jpg\" alt=\"\" width=\"1243\" height=\"857\" srcset=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2024\/03\/KSC-20231019-PH-ALS01_0002crop.jpg 1243w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2024\/03\/KSC-20231019-PH-ALS01_0002crop-350x241.jpg 350w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2024\/03\/KSC-20231019-PH-ALS01_0002crop-508x350.jpg 508w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2024\/03\/KSC-20231019-PH-ALS01_0002crop-768x530.jpg 768w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2024\/03\/KSC-20231019-PH-ALS01_0002crop-1170x807.jpg 1170w\" sizes=\"(max-width: 1243px) 100vw, 1243px\"><\/p>\n<p id=\"caption-attachment-99102\" class=\"wp-caption-text\">Credit: NASA\/Amanda Stevenson.<\/p>\n<p><em>(Photo Caption: The Artemis II Orion crew module is seen during mating to the service module last October without its backshell panels. The spacecraft batteries that will need to be repaired or replaced are located just above the heatshield on the opposite side from the windows.)<\/em><\/p>\n<p>The batteries on Orion for Artemis II are a new design that incorporates more safety features, given that all future flights of the spacecraft are expected to be crewed beginning with this mission. The battery design that flew on the uncrewed Artemis I Orion was floated as an alternative during brainstorming early in the process after the problem came up but was quickly ruled out.<\/p>\n<p>\u201cThe Artemis I design was a large cell battery, high capacitance,\u201d Kshatriya said in the NSF interview. \u201c[It uses the] same material but did not have all of the mitigations that we\u2019d like to have on a human-rated vehicle.\u201d<\/p>\n<p>\u201cWe accepted that for [Artemis I] because we didn\u2019t have to deal with the loss of crew risk, so we let that battery design fly. [The] Artemis II batteries have all the safety [features], like small cell, isolated cells, all of those protections built in to prevent a thermal runaway.\u201d<\/p>\n<p>\u201cThat\u2019s not the only thing you do to prevent that kind of thing, but bottom line is that we like the Artemis II design because it\u2019s way safer for the crew,\u201d he added. NASA and Lockheed Martin are looking at different options to resolve the battery issue.<\/p>\n<p>\u201cIn terms of the options that are still remaining, I think they have a good understanding of the environment and what in the design is causing the off-nominal vibration response and so there\u2019s a couple of things that they\u2019re working through in terms of either a repair, in-situ, of the existing batteries, or an acceleration of the Artemis III shipset,\u201d Kshatriya said.<\/p>\n<\/p>\n<p><iframe title=\"Where The ORANGE ROCKETS Come From! Artemis Hardware Exclusive Look\" src=\"https:\/\/www.youtube.com\/embed\/GqC5jjwidrA?feature=oembed\" frameborder=\"0\" allow=\"accelerometer; autoplay; clipboard-write; encrypted-media; gyroscope; picture-in-picture; web-share\" referrerpolicy=\"strict-origin-when-cross-origin\" allowfullscreen=\"\" name=\"fitvid1\" data-gtm-yt-inspected-13=\"true\" data-gtm-yt-inspected-21=\"true\"><\/iframe><\/p>\n<p>While the options for which battery set to use are evaluated, the repaired battery design will still need to complete crew-rated qualification testing for Artemis II. \u201cLockheed and [the battery vendor] EaglePicher and the Orion Program and all of our tech authorities are pretty heavily engaged in this test program,\u201d Kshatriya said.<\/p>\n<p>\u201cAfter the fixes [are implemented] and you do [the stress] and the vibration analysis, you have to go in [and test]. You have to not only do it analytically [and] convince yourself in all regimes you\u2019re good, but you have to get these things on shaker tables and make sure that the fix works.\u201d<\/p>\n<p>\u201cWe\u2019re going through that \u2014 so far, so good,\u201d he noted. \u201cWe\u2019ve exposed the repaired batteries to what we believe to be equivalent environments, [the] same kind of test profile as before, for the ones that we saw in December. So that\u2019s in good shape, the remainder is how are we going to cut these back in and then how is it going to cut back into ATLO \u2026 the program is still working through [that].\u201d<\/p>\n<p>Vacuum test is next major milestone, working towards EGS handover around the September timeframe<\/p>\n<p>Before the announcement of the delay in January, the next major milestone in Artemis II Orion production was a vacuum test of the spacecraft in the O&amp;C Building using one of the Apollo-era altitude chambers that was recently renovated for Orion. Kshatriya said they could proceed with two such tests first and then implement the battery fix afterward.<\/p>\n<p>\u201cThere\u2019s an EMI (electromagnetic interference) and EMC (electromagnetic compatibility) [testing] and then vacuum testing and we can do that and take credit for almost all of it and do penalty testing afterwards, and that\u2019s primarily on the battery side,\u201d he said. \u201cIf it\u2019s not already done, I think they\u2019re pretty much done with that [ECLSS electronics hardware] rework, so that\u2019s not really going to be an issue but the battery side of it that we did talk about a lot, can we get it out of the FAST cell and into the chamber with the current batteries.\u201d<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-99103\" class=\"wp-image-99103 size-full\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2024\/03\/20170008822.OC-Altitude-Chamber.Figure-10.Zoom_.jpg\" alt=\"\" width=\"1606\" height=\"770\" srcset=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2024\/03\/20170008822.OC-Altitude-Chamber.Figure-10.Zoom_.jpg 1606w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2024\/03\/20170008822.OC-Altitude-Chamber.Figure-10.Zoom_-350x168.jpg 350w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2024\/03\/20170008822.OC-Altitude-Chamber.Figure-10.Zoom_-630x302.jpg 630w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2024\/03\/20170008822.OC-Altitude-Chamber.Figure-10.Zoom_-768x368.jpg 768w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2024\/03\/20170008822.OC-Altitude-Chamber.Figure-10.Zoom_-1170x561.jpg 1170w\" sizes=\"(max-width: 1606px) 100vw, 1606px\"><\/p>\n<p id=\"caption-attachment-99103\" class=\"wp-caption-text\">Graphic showing the altitude chambers in the Orion production area and how the Orion spacecraft will be configured for the upcoming vacuum test. Credit: NASA.<\/p>\n<p>\u201cThe technical community convinced themselves that even for integrated EMC and for vacuum [testing], you\u2019re good to go. So, we will have to de-integrate and go swap [the batteries after those tests] but there\u2019s ways to penalty test different components there to make sure you\u2019re not compromising the integrity of the spacecraft-level tests.\u201d<\/p>\n<p>The batteries are located on the Crew Module outside the pressurized crew compartment.<\/p>\n<p>Kshatriya said the program is currently targeting completion of Orion and handover to EGS in September. \u201cRight now, we\u2019re trying to make sure we can do the final handover by the September timeframe, that\u2019s the target,\u201d he said.<\/p>\n<p>\u201cWe have to make sure we settle on what the battery solution is going to be, so there is a fair bit of uncertainty there. I think we\u2019ve accounted for it in the risk for the overall schedule; for the [September 2025] launch date, I think that risk is covered.\u201d<\/p>\n<p>NASA says the spacecraft will be moved from the FAST cell to the altitude chamber in April to prepare for the EMI\/EMC tests first. Vacuum testing in the chamber is currently scheduled for early July.<\/p>\n<p><em>(Lead image: Orion crew module test article seen after completing recent landing and recovery training in San Diego. Credit: Jack Beyer for NSF)<\/em><\/p>\n","protected":false},"excerpt":{"rendered":"<p>NASA is working with Orion spacecraft prime contractor Lockheed Martin to resolve a handful of issues that came up late last year during ground testing, forcing the space agency to delay the launch readiness target date for its Artemis II circumlunar mission to September 2025. The Lockheed Martin assembly, test, and launch operations (ATLO) team [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":"","_links_to":"","_links_to_target":""},"categories":[2],"tags":[304,5942,4011,472,190,640],"class_list":["post-24058","post","type-post","status-publish","format-standard","hentry","category-news","tag-artemis","tag-artemis-ii","tag-em-2","tag-lockheed-martin","tag-nasa","tag-orion"],"acf":[],"_links":{"self":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/24058"}],"collection":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/comments?post=24058"}],"version-history":[{"count":0,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/24058\/revisions"}],"wp:attachment":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/media?parent=24058"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/categories?post=24058"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/tags?post=24058"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}