{"id":25037,"date":"2021-03-31T18:08:23","date_gmt":"2021-03-31T10:08:23","guid":{"rendered":"https:\/\/wp-productionenv-bjg9h2g2bgg5b8aa.southeastasia-01.azurewebsites.net\/news\/maf-continues-tornado-hurricane-recovery-while-building-sls-stages-under-pandemic-restrictions\/"},"modified":"2021-03-31T18:08:23","modified_gmt":"2021-03-31T10:08:23","slug":"maf-continues-tornado-hurricane-recovery-while-building-sls-stages-under-pandemic-restrictions","status":"publish","type":"post","link":"https:\/\/starpath.global\/news\/maf-continues-tornado-hurricane-recovery-while-building-sls-stages-under-pandemic-restrictions\/","title":{"rendered":"MAF continues tornado\/hurricane recovery while building SLS stages under pandemic restrictions"},"content":{"rendered":"<p>Boeing is moving into the final phases of standalone integration and outfitting of Core Stage-2 elements and is about to start putting the elements together as production of Core Stage-3 continues with structural assembly of the engine section while preparations are in work for Exploration Upper Stage (EUS) manufacturing to start later in the year.<\/p>\n<p>In parallel with Boeing production of SLS stages and a factory optimization effort going on inside the production areas at the Michoud Assembly Facility, NASA is continuing to oversee repairs to the outside of the buildings from recent weather damage and upgrades to protect against future extreme weather while access to the facility at-large remains restricted by the ongoing COVID-19 pandemic.<\/p>\n<\/p>\n<p>Tornado\/hurricane recovery and facility modernization<\/p>\n<p>Despite impacts from severe weather and the COVID-19 pandemic, it will be another busy year at NASA\u2019s Michoud Assembly Facility (MAF) in New Orleans. Repairs to facility buildings from tornado and hurricane damage go on while inside the factory work to produce new Space Launch System rocket stages resumed when MAF re-opened in May 2020 after a COVID-19 shutdown.<\/p>\n<p>Hurricane Zeta passed directly over the facility last October, undoing a few long-term repairs to damage caused by a February 2017 EF-3 tornado; however, some post-tornado upgrades to roofs and siding held up, and it is hoped those can be completed before the next big storm arrives.<\/p>\n<p>\u201c[2020] was an interesting year,\u201d Robert Champion, NASA\u2019s director of the Michoud Assembly Facility, said in February. \u201cWe had six hurricanes that we prepared for. Five of them we shut down for, one of them hit us; that being Hurricane Zeta.\u201d<\/p>\n<p>\u201cWe\u2019ve spent a significant amount of money just [for] temporary repairing,\u201d Champion noted.&nbsp; \u201cWe\u2019ve got a supplemental [funding request] that we\u2019ve submitted to Congress to see if there\u2019s money to help us really fix the damage, but as we\u2019ve done before, we do triage and we move on and we keep the flight hardware producing.\u201d<\/p>\n<p><img fetchpriority=\"high\" decoding=\"async\" aria-describedby=\"caption-attachment-76999\" class=\"wp-image-76999 size-full\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2021\/03\/MAF_20200903_Gate-7large.jpg\" alt=\"\" width=\"1920\" height=\"1280\" srcset=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2021\/03\/MAF_20200903_Gate-7large.jpg 1920w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2021\/03\/MAF_20200903_Gate-7large-350x233.jpg 350w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2021\/03\/MAF_20200903_Gate-7large-525x350.jpg 525w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2021\/03\/MAF_20200903_Gate-7large-768x512.jpg 768w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2021\/03\/MAF_20200903_Gate-7large-1170x780.jpg 1170w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2021\/03\/MAF_20200903_Gate-7large-585x390.jpg 585w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2021\/03\/MAF_20200903_Gate-7large-263x175.jpg 263w\" sizes=\"(max-width: 1920px) 100vw, 1920px\"><\/p>\n<p id=\"caption-attachment-76999\" class=\"wp-caption-text\">Credit: NASA\/Steven Seipel.<\/p>\n<p><em><b>(Photo Caption: Permanent repairs to the Gate 7 entrance at MAF as seen following completion of work in September 2020. The February 2017 EF-3 tornado damaged the gate area just before it went through the SLS manufacturing and assembly areas at MAF (seen in the background on the left). The multi-vortex tornado destroyed Building 350 (not pictured.)<\/b><\/em><\/p>\n<p>\u201cWe shut the plant down for one day to actually recover and reopen after Zeta, and I think that\u2019s a tremendous tribute to our personnel here that they were able to clean up and get things patched up enough.\u201d<\/p>\n<p>\u201cWe had one fan house from the top of Building 114 that came off and hit [Building] 103 about 60 or 70 feet down with significant force, poked a hole in the roof close to flight hardware,\u201d Champion noted. \u201cWe got lucky there that we didn\u2019t damage it. It let in a lot of water, and we had some clean up. But they were able to get that all back and running in one day.\u201d<\/p>\n<p>The repairs allowed work to continue, but they are temporary. \u201cAs I\u2019ve told my leadership, we\u2019re good for about 18 months or the first storm, and unfortunately we\u2019ve had one storm already,\u201d Champion said.<\/p>\n<p>By the time Zeta hit the facility in late-October, Champion noted that the on-going COVID pandemic had left its mark at Michoud just like everywhere else. \u201cWhen [COVID] hit back last March, between Mardi Gras and St. Patrick\u2019s Day, we shut down for about four to six weeks,\u201d he said.<\/p>\n<p>\u201cThat was really when folks were just starting to understand what the issues were, and then we started developing policies about how to wear masks, how to socially distance, washing hands, cleaning surfaces, getting hand sanitizer put out, and then we were able to open back up. We opened back up to about a 25% capacity.\u201d<\/p>\n<p>\u201cTo date I\u2019m very proud of the team and how they\u2019ve observed all the protocols and that we\u2019ve only had one confirmed [transmission] of COVID on-site. We\u2019ve had a lot of people who have gotten sick, but they got sick outside.\u201d<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-49127\" class=\"wp-image-49127 size-full\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2017\/02\/Screen-Shot-2017-02-08-at-00.42.53.png\" alt=\"\" width=\"1136\" height=\"586\" srcset=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2017\/02\/Screen-Shot-2017-02-08-at-00.42.53.png 1136w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2017\/02\/Screen-Shot-2017-02-08-at-00.42.53-350x181.png 350w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2017\/02\/Screen-Shot-2017-02-08-at-00.42.53-630x325.png 630w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2017\/02\/Screen-Shot-2017-02-08-at-00.42.53-768x396.png 768w\" sizes=\"(max-width: 1136px) 100vw, 1136px\"><\/p>\n<p id=\"caption-attachment-49127\" class=\"wp-caption-text\">Credit: NSF forums<\/p>\n<p><em>(Photo caption: An EF-3 tornado traverses the grounds of the Michoud Assembly Facility on February 7, 2017.)<\/em><\/p>\n<p>For the people who have to be on-site for essential work, a tracking device provides contact tracing. If someone reports an illness, the devices provide input to a system that can notify anyone who got inside the social distancing limit to that person at the facility.<\/p>\n<p>\u201cIf we\u2019re six feet apart, it\u2019ll register that I was within six feet, so then if I wind up getting sick or having COVID, [the system] will say [who] needs to be quarantined as well,\u201d Champion said. \u201cWe\u2019ve got about a thousand of these [devices] allocated between Boeing, Lockheed, S3 [Syncom Space Services], and the NASA folks.\u201d<\/p>\n<p>MAF is in Stage 3 of the COVID response framework with some modifications, including operating at 25% on-site capacity. Similar to the shared experience by many others, teleworking is the temporary norm and will likely remain a part of how some work.<\/p>\n<p>\u201cMost of my staff teleworks,\u201d Champion said. \u201cWe have about 20 people, and we\u2019re usually five to seven that are in the office. So a lot of my staff, the business office, procurement office, some of those can do their job just fine from home and even coming back out of this I think we will have an option to allow people to telework now.\u201d<\/p>\n<p>Prior to Hurricane Zeta, the 2017 tornado in East New Orleans also directly hit MAF, causing significant damage to the SLS production areas after collapsing the front of Building 350. Three years after the tornado, the remains of the building were finally removed.<\/p>\n<p>\u201c350 was pretty much destroyed. It was an old building, had asbestos in it, and it would cost more to clean it up and repair it than it would be to just tear it down. That\u2019s what we did. We got funds to tear it down, and as of right now, as of end of February, it is basically back to green space.\u201d<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-77000\" class=\"wp-image-77000 size-full\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2021\/03\/MAF_20201029_ZetaResponse_009.edit_.jpg\" alt=\"\" width=\"2048\" height=\"1365\" srcset=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2021\/03\/MAF_20201029_ZetaResponse_009.edit_.jpg 2048w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2021\/03\/MAF_20201029_ZetaResponse_009.edit_-350x233.jpg 350w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2021\/03\/MAF_20201029_ZetaResponse_009.edit_-525x350.jpg 525w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2021\/03\/MAF_20201029_ZetaResponse_009.edit_-768x512.jpg 768w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2021\/03\/MAF_20201029_ZetaResponse_009.edit_-1920x1280.jpg 1920w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2021\/03\/MAF_20201029_ZetaResponse_009.edit_-1170x780.jpg 1170w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2021\/03\/MAF_20201029_ZetaResponse_009.edit_-585x390.jpg 585w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2021\/03\/MAF_20201029_ZetaResponse_009.edit_-263x175.jpg 263w\" sizes=\"(max-width: 2048px) 100vw, 2048px\"><\/p>\n<p id=\"caption-attachment-77000\" class=\"wp-caption-text\">Credit: NASA\/Eric Bordelon.<\/p>\n<p><em>(Photo Caption: The old siding on Building 110 is missing in places on the day after the passage of Hurricane Zeta in October 2020. The lighter colored paneling installed nearby is a new, permanent replacement siding that is being installed after the 2017 tornado. The newer siding survived the hurricane intact and is hoped to be fully in-place before the next big storm hits.)<\/em><\/p>\n<p>Another long-term tornado recovery task that remains is installing new, permanent siding to Building 110. Also called the Vertical Assembly Building at MAF, the multiple high-bay, Saturn-era structure is used to handle the large-scale rocket hardware built there.<\/p>\n<p>\u201cOn the west side of 110, the bottom half up to about three-quarters high has a brighter-colored siding on it,\u201d Champion said. \u201cThat is the new siding. That was there during Zeta on about two and a half, three sides. We\u2019re still putting it up.\u201d<\/p>\n<p>Champion noted they expect the rest of the siding to be installed during 2021. \u201cThe new siding is double-layered and it\u2019s got insulation so it gives us insulation for the building as well as hurricane protection. And it fared very well,\u201d he said. \u201cThe old siding, some of it pulled off during the hurricane, so that proved the old stuff needs to go and the new stuff worked well.\u201d<\/p>\n<p>Roof repairs to Building 110 and Building 103 from the 2017 tornado held up, but Hurricane Zeta caused roof damage elsewhere. \u201cThe roof on [Building] 114 that was about 60% repaired, but all of the debris came off and just peppered it with shrapnel and ripped into the roof and so we\u2019re going to have to repair 40 to 50% of the new roof on 114,\u201d Champion said.<\/p>\n<p class=\"post-nav-links\">Pages: 1 2<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Boeing is moving into the final phases of standalone integration and outfitting of Core Stage-2 elements and is about to start putting the elements together as production of Core Stage-3 continues with structural assembly of the engine section while preparations are in work for Exploration Upper Stage (EUS) manufacturing to start later in the year. [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":"","_links_to":"","_links_to_target":""},"categories":[2],"tags":[670,7866,190,624],"class_list":["post-25037","post","type-post","status-publish","format-standard","hentry","category-news","tag-boeing","tag-maf","tag-nasa","tag-sls"],"acf":[],"_links":{"self":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/25037"}],"collection":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/comments?post=25037"}],"version-history":[{"count":0,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/25037\/revisions"}],"wp:attachment":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/media?parent=25037"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/categories?post=25037"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/tags?post=25037"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}