{"id":3025,"date":"2025-10-31T14:55:29","date_gmt":"2025-10-31T14:55:29","guid":{"rendered":"https:\/\/wp-productionenv-bjg9h2g2bgg5b8aa.southeastasia-01.azurewebsites.net\/news\/china-targets-manned-moon-landing-by-2030-outlines-testing-tasks-ahead\/"},"modified":"2025-10-31T14:55:29","modified_gmt":"2025-10-31T14:55:29","slug":"china-targets-manned-moon-landing-by-2030-outlines-testing-tasks-ahead","status":"publish","type":"post","link":"https:\/\/starpath.global\/news\/china-targets-manned-moon-landing-by-2030-outlines-testing-tasks-ahead\/","title":{"rendered":"China targets manned moon landing by 2030, outlines testing tasks ahead"},"content":{"rendered":"<p  >China is holding firm to its goal of landing astronauts on the moon by 2030, and has outlined a packed schedule of development and testing for its ambitious crewed lunar program.<\/p>\n<p  >A series of crucial upcoming tests include &#8212; integrated testing for the Lanyue lunar lander, thermal tests and maximum dynamic pressure escape tests for the Mengzhou manned spacecraft, and low-altitude and technology verification flights for the Long March-10 carrier rocket, the China Manned Space Agency (CMSA) said on Thursday.<\/p>\n<p  >CMSA spokesperson Zhang Jingbo announced at a press conference that the Mengzhou-1 spacecraft mission will be included in the public logo solicitation campaign alongside missions to China&#8217;s space station. This spacecraft is primarily designed for lunar missions while also supporting the space station missions in low-Earth orbit.<\/p>\n<p  >All development and construction work for the crewed lunar mission is proceeding as planned, said Zhang. Primary preliminary prototyping of key flight hardware, including the Long March-10 rocket, the Mengzhou spacecraft, the Lanyue lander, the Wangyu lunar extravehicular suit and the Tansuo crewed lunar rover, has been completed.<\/p>\n<p  >Also, payload designs for scientific research and applications have been finalized, and ground-based infrastructure, such as the launch site, tracking network and landing site on Earth, is under accelerated development, according to Zhang.<\/p>\n<p  >The mission has seen a string of successful tests this year, including the second-stage propulsion system test and the captive firing test for the Long March-10 rocket, the zero-altitude escape test for the Mengzhou spacecraft, and the comprehensive landing and takeoff verification test for the Lanyue lander.<\/p>\n<p  >Zhang noted that numerous new technologies still require validation, and the upcoming workload is heavy, given the high-quality standards and a tight timeline for flight tests.<\/p>\n<p  >The project team has pledged to overcome these hurdles and lay a solid foundation for achieving the nation&#8217;s lunar exploration goal on schedule.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>China is holding firm to its goal of landing astronauts on the moon by 2030, and has outlined a packed schedule of development and testing for its ambitious crewed lunar program. A series of crucial upcoming tests include &#8212; integrated testing for the Lanyue lunar lander, thermal tests and maximum dynamic pressure escape tests for [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":"","_links_to":"","_links_to_target":""},"categories":[2],"tags":[],"class_list":["post-3025","post","type-post","status-publish","format-standard","hentry","category-news"],"acf":[],"_links":{"self":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/3025"}],"collection":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/comments?post=3025"}],"version-history":[{"count":0,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/3025\/revisions"}],"wp:attachment":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/media?parent=3025"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/categories?post=3025"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/tags?post=3025"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}