{"id":37608,"date":"2020-05-15T23:23:00","date_gmt":"2020-05-15T15:23:00","guid":{"rendered":"https:\/\/wp-productionenv-bjg9h2g2bgg5b8aa.southeastasia-01.azurewebsites.net\/news\/stennis-returning-as-battle-to-protect-sls-maiden-launch-in-2021-restarts\/"},"modified":"2020-05-15T23:23:00","modified_gmt":"2020-05-15T15:23:00","slug":"stennis-returning-as-battle-to-protect-sls-maiden-launch-in-2021-restarts","status":"publish","type":"post","link":"https:\/\/starpath.global\/news\/stennis-returning-as-battle-to-protect-sls-maiden-launch-in-2021-restarts\/","title":{"rendered":"Stennis returning as battle to protect SLS maiden launch in 2021 restarts"},"content":{"rendered":"<p>Hands-on operations with the Space Launch System (SLS) resumed this week, following a lengthy standdown due to the restrictions relating to COVID-19. This included a return to Green Run preparations at the Stennis Space Center, with \u201climited crews\u201d preparing the Artemis-1 core stage on the B-2 test stand for what will be one of the most defining tests relating to the launch date. That maiden launch of NASA\u2019s new rocket is awaiting a realigned launch date, which officials cite will be moved to \u201clate 2021\u201d.<\/p>\n<p>The Green Run, which at one point was set to be deleted from the test flow to attempt to protect SLS\u2019 schedule, will involve the Core Stage\u2019s four RS-25 engines firing up on B-2 to provide key validation of the hardware\u2019s readiness ahead of being shipped to the Kennedy Space Center (KSC).<\/p>\n<h4 class=\"widget-title penci-border-arrow\">See Also<\/h4>\n<ul>\n<li>SLS Forum Section<\/li>\n<li>L2 SLS Section<\/li>\n<li>Click here to Join L2<\/li>\n<\/ul>\n<p>The Green Run was still awaiting a firm date for the milestone firing, although the overall goal was to complete testing \u201cin the summer\u201d in preparation for a trip on the Pegasus Barge to Florida later this year.<\/p>\n<p>However, Stennis moved to \u201cStage 4\u201d \u2013 per the COVID shutdown \u2013 on March 16, with only the personnel needed to perform mission-essential activities related to the safety and security of the center allowed on site.<\/p>\n<p>\u201cThough Stennis remains in Stage 4 of NASA\u2019s COVID-19 Response Framework, we assessed state and local conditions and worked with agency leadership to develop a plan to safely and methodically increase critical on-site work toward the launch of the next great era of space exploration,\u201d noted Stennis Center Director Rick Gilbrech.<\/p>\n<p>Key SLS centers, such as Marshall and Michoud are also are in Stage 4.<\/p>\n<p>Work to bring the B-2 Test Stand out of its slumber includes restoring facility power and controls, as well as ensuring pressurized gas systems are at proper levels for SLS operators to proceed with testing activities.<br \/>\n<img fetchpriority=\"high\" decoding=\"async\" class=\"aligncenter size-full wp-image-66586\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2020\/05\/NSF-2020-05-15-17-59-25-949.jpg\" alt=\"Engineers return to working at B-2 - via NASA\" width=\"1604\" height=\"908\" srcset=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2020\/05\/NSF-2020-05-15-17-59-25-949.jpg 1604w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2020\/05\/NSF-2020-05-15-17-59-25-949-350x198.jpg 350w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2020\/05\/NSF-2020-05-15-17-59-25-949-618x350.jpg 618w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2020\/05\/NSF-2020-05-15-17-59-25-949-768x435.jpg 768w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2020\/05\/NSF-2020-05-15-17-59-25-949-1170x662.jpg 1170w\" sizes=\"(max-width: 1604px) 100vw, 1604px\">\u201cThe test facility has been in standby mode, so we allotted two days to reestablish some facility support of mechanical and electrical systems that will also assist the vehicle contractors in performing their operations,\u201d added Barry Robinson, project manager for the B-2 Test Stand SLS core stage Green Run testing at Stennis.<\/p>\n<p>Following modal testing to validate structural analysis on the vehicle, the Stennis team had connected feed and pressure lines. They had about 10 days worth of integration work to get to \u201cphase one\u201d test activity when the center halted operations due to COVID restrictions.<\/p>\n<p>A handful of workers remained on-site to keep the Core Stage safe and watch for water intrusions during several documented \u201crain days\u201d.<\/p>\n<p>     (adsbygoogle = window.adsbygoogle || []).push({});<\/p>\n<p>With more workers returning to the B-2 stand, teams will start the ramp-up to phase one testing, starting with electrical checkouts, working through an avionics checklist and driving the Trust Vector Control (TVC) system for the engines.<\/p>\n<p>With the flagship event of the Green Run being an eight-minute, full-duration hot fire of the core stage with its four RS-25 engines, passing that phase \u2013 and being ready to ship the stage to KSC \u2013 will provide schedule guidance, which has been fluid throughout the lifetime of SLS.<br \/>\n<img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-65157\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2020\/02\/P1160599.35pct.jpg\" alt=\"\" width=\"1714\" height=\"1286\" srcset=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2020\/02\/P1160599.35pct.jpg 1714w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2020\/02\/P1160599.35pct-350x263.jpg 350w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2020\/02\/P1160599.35pct-466x350.jpg 466w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2020\/02\/P1160599.35pct-768x576.jpg 768w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2020\/02\/P1160599.35pct-1170x878.jpg 1170w\" sizes=\"(max-width: 1714px) 100vw, 1714px\">The Green Run was tracking an August test, which is now expected to occur sometime in mid-autumn \u2013 followed by shipping to KSC at the end of the year, or early in 2021.<\/p>\n<p>Ahead of the next schedule realignment, which is set to occur next week, Tom Whitmeyer \u2013 NASA assistant deputy associate administrator \u2013 provided an overview at the NASA Advisory Council\u2019s Human Exploration and Operations Committee.<\/p>\n<p>Unsurprisingly, the anchor item for the overview was the status of the Green Run.<\/p>\n<p>\u201cThe one thing that we\u2019re really in the process of doing right now is that middle item, the core stage, it\u2019s been manufactured and delivered to Stennis. It\u2019s sitting in the test stand at Stennis, the B-2 test stand. We really need to get through what we call the Green Run test,\u201d Mr. Whitmeyer said.<\/p>\n<p>\u201cWhen we complete the Green Run test, we\u2019ll take that core stage, and literally begin to build up this integrated stack, test it at the Cape, and then fly it. We bring the motors in first, and then we drop the core stage in, and then we actually stack the rest of the vehicle. We\u2019ll do a Wet Dress Rehearsal (WDR) next year, then we\u2019ll get ready to fly.\u201d<\/p>\n<p>When the Core Stage arrives at KSC, it will be greeted in the Vehicle Assembly Building by the Mobile Launcher with the two Solid Rocket Boosters already stacked on its deck. This follows a similar path to during the Shuttle era, where the boosters would be \u201cbuilt-up\u201d on the Mobile Launch Platform, ahead of receiving the External Tank.<\/p>\n<p>The booster segments for Artemis-1 are already built and preparing to make the train journey from Utah. The latest L2 schedule for transportation cites a NET (No Earlier Than) departure date of next week, on a journey that will take around three weeks before arriving into KSC.<\/p>\n<\/p>\n<p><iframe title=\"Space Shuttle Solid Rocket Boosters on Florida East Coast Railway 5\/27\/10\" src=\"https:\/\/www.youtube.com\/embed\/yco2S4WG_9Q?feature=oembed\" frameborder=\"0\" allow=\"accelerometer; autoplay; clipboard-write; encrypted-media; gyroscope; picture-in-picture; web-share\" allowfullscreen=\"\" name=\"fitvid0\" data-gtm-yt-inspected-14=\"true\" data-gtm-yt-inspected-21=\"true\"><\/iframe><\/p>\n<p>\u201cRight now we currently have all the motor segments we need for this flight out in Utah, (stored) there to keep them dry,\u201d added Mr. Whitmeyer. \u201cThen what we will do is we will begin to transport those motor segments towards the KSC, and they\u2019ll be delivered by rail car to KSC in the mid-June timeframe.\u201d<\/p>\n<p>The final element to be stacked in the VAB will be the Orion spacecraft, which is currently in storage at KSC after completing most of its pre-flight assembly.<\/p>\n<p>\u201cWe actually have Orion, almost in a completed state, put it in temporary storage at this point \u2013 (ready to) begin the flight preparation processes with the completed vehicle, which involves putting high-pressure helium in its tanks and beginning the bi-prop loading operations at the Cape,\u201d Mr. Whitmeyer continued.<\/p>\n<p>\u201cAnd by the time we have that completed, we should be in a stacked configuration with the core stage, and we\u2019ll actually begin the integration of Orion then, to the vehicle.\u201d<br \/>\n<img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-66589\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2020\/05\/NSF-2020-05-15-18-11-54-237.jpg\" alt=\"\" width=\"1255\" height=\"714\" srcset=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2020\/05\/NSF-2020-05-15-18-11-54-237.jpg 1255w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2020\/05\/NSF-2020-05-15-18-11-54-237-350x199.jpg 350w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2020\/05\/NSF-2020-05-15-18-11-54-237-615x350.jpg 615w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2020\/05\/NSF-2020-05-15-18-11-54-237-768x437.jpg 768w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2020\/05\/NSF-2020-05-15-18-11-54-237-1170x666.jpg 1170w\" sizes=\"(max-width: 1255px) 100vw, 1255px\">Per the launch date, the latest realignment was tracking a Summer 2021 launch of Artemis-1, before the COVID restrictions halted the bulk of SLS preparations. The SLS schedule has been slipping an average of one year, each year \u2013 although recent schedules had begun to slip only by a matter of months.<\/p>\n<p>\u201cWe had for a year now maintained our schedule, in terms of getting that work done. We had some earlier delays in the program, but I think (recent schedules were) an indication of things that had really turned around with manufacturing and processing activities,\u201d added Mr. Whitmeyer.<\/p>\n<p>\u201cSLS, the Marshall folks working with the Boeing team, had created a lot of manufacturing practices and really improved how we were going through these operations. And they held schedule for the entire year, and they actually held schedule when we got to Stennis, up to the point when we had temporary hold operations for the virus.\u201d<\/p>\n<p>Although Mr. Whitmeyer wouldn\u2019t commit to an actual launch date, several references to the end of 2021 were made, ahead of next week\u2019s official schedule announcement.<\/p>\n<p>\u201cThat\u2019s the reason I started with the mission map. It\u2019s an incredible journey, it\u2019s going to be an incredible flight for this hardware. And we\u2019re going to really take it a step at a time and make sure we\u2019re ready to commit ourselves to a launch later next year.<\/p>\n<p>\u201cWe\u2019re feeling fairly comfortable that we will be having the Artemis 1 mission towards the end of next year.\u201d<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Hands-on operations with the Space Launch System (SLS) resumed this week, following a lengthy standdown due to the restrictions relating to COVID-19. This included a return to Green Run preparations at the Stennis Space Center, with \u201climited crews\u201d preparing the Artemis-1 core stage on the B-2 test stand for what will be one of the [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":37612,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":"","_links_to":"","_links_to_target":""},"categories":[2],"tags":[1700,8891,3718,1826,640,2363,624,8091],"class_list":["post-37608","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","tag-artemis-1","tag-b-2","tag-em-1","tag-green-run","tag-orion","tag-rs-25","tag-sls","tag-stennis"],"acf":[],"_links":{"self":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/37608"}],"collection":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/comments?post=37608"}],"version-history":[{"count":0,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/37608\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/media\/37612"}],"wp:attachment":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/media?parent=37608"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/categories?post=37608"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/tags?post=37608"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}