{"id":38087,"date":"2019-03-29T01:18:33","date_gmt":"2019-03-28T17:18:33","guid":{"rendered":"https:\/\/wp-productionenv-bjg9h2g2bgg5b8aa.southeastasia-01.azurewebsites.net\/news\/examining-nasas-challenge-to-sls-as-moon-soon-becomes-the-latest-bold-goal\/"},"modified":"2019-03-29T01:18:33","modified_gmt":"2019-03-28T17:18:33","slug":"examining-nasas-challenge-to-sls-as-moon-soon-becomes-the-latest-bold-goal","status":"publish","type":"post","link":"https:\/\/starpath.global\/news\/examining-nasas-challenge-to-sls-as-moon-soon-becomes-the-latest-bold-goal\/","title":{"rendered":"Examining NASA\u2019s challenge to SLS as \u2018Moon, soon\u2019 becomes the latest bold goal"},"content":{"rendered":"<p>Vice President Mike Pence has instructed NASA to land Americans on the Moon within the next five years. That was the headline from the latest National Space Council meeting this week.<\/p>\n<p>These words will require action and an influx of additional funding to stand a chance of becoming a reality. However, an overriding abstract behind the bold words is to put the Space Launch System (SLS) on notice that it cannot really afford any more schedule slips; more so, it needs to advance its launch dates.<\/p>\n<p>\u201cAll of this has happened before and it will happen again\u201d:<\/p>\n<p>Bold changes to the direction of NASA\u2019s deep space aspirations are by no means uncommon.<\/p>\n<p>Specific to NASA\u2019s departure from Low Earth Orbit (LEO) in the final years of the Space Shuttle, NASA\u2019s Vision For Space Exploration (VSE) called for a Moon, Mars and Beyond roadmap as outlined by President George W. Bush in 2004<\/p>\n<p>This became NASA\u2019s Constellation Program (CxP) that centered around the Orion crew capsule \u2013 with an initial capability to launch crews to the International Space Station (ISS), an Ares I crew launcher and an Ares V Heavy Lift \u2013 Cargo Only \u2013 Vehicle.<\/p>\n<p><img fetchpriority=\"high\" decoding=\"async\" aria-describedby=\"caption-attachment-60776\" class=\"size-full wp-image-60776\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2019\/03\/2019-03-27-163033.jpg\" alt=\"\" width=\"1266\" height=\"851\" srcset=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2019\/03\/2019-03-27-163033.jpg 1266w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2019\/03\/2019-03-27-163033-350x235.jpg 350w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2019\/03\/2019-03-27-163033-521x350.jpg 521w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2019\/03\/2019-03-27-163033-768x516.jpg 768w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2019\/03\/2019-03-27-163033-1170x786.jpg 1170w\" sizes=\"(max-width: 1266px) 100vw, 1266px\"><\/p>\n<p id=\"caption-attachment-60776\" class=\"wp-caption-text\">Ares I \u2013 with Orion \u2013 and Ares V \u2013 CxP \u2013 via NASA<\/p>\n<p>Dubbed \u201cApollo on Steroids\u201d, the launchers were based on a mix of flight-proven technology from the Space Shuttle program, not least the Solid Rocket Boosters, plus heritage design and improved technology engines, such as the RS-68 for Ares V&nbsp;(later changed to using RS-25s) and the J-2X for the upper stage of Ares I.<\/p>\n<p>This 1.5 launch architecture&nbsp;of using a \u201csingle stick\u201d booster dedicated for just launching Orion and a HLV for lofting the heavy payloads out of LEO was in part due to NASA\u2019s wish to decouple crew and cargo from being on the same vehicle, one of the Shuttle\u2019s known safety concerns.<\/p>\n<p>It backfired. Ares I struggled during development, not least on upmass capability, resulting in Orion undergoing the ZBV (Zero Based Vehicle) process that stripped the vehicle of capability and led to annoyed memos from the Orion management begging the Ares team \u201cto stop hindering our process\u201d.<\/p>\n<p>Space Shuttle<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>Rocket building kits<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>Spaceflight news subscription<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>\n<p>     (adsbygoogle = window.adsbygoogle || []).push({});<\/p>\n<p>It suffered from contradictions, such as claims it would be the safest crew vehicle ever built \u2013 unlikely to suffer a LOV\/C (Loss of Vehicle and Crew) failure in \u201cthousands\u201d of launches \u2013 yet required a hugely complex and expensive rollercoaster to be built into the pad as the Emergency Escape System (EES).<\/p>\n<p><iframe id=\"twitter-widget-1\" scrolling=\"no\" frameborder=\"0\" allowtransparency=\"true\" allowfullscreen=\"true\" class=\"\" style=\"position: static; visibility: visible; width: 0px; height: 0px; display: block; flex-grow: 1;\" title=\"X Post\" src=\"https:\/\/platform.twitter.com\/embed\/Tweet.html?creatorScreenName=NASASpaceflight&amp;dnt=true&amp;embedId=twitter-widget-1&amp;features=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%3D%3D&amp;frame=false&amp;hideCard=false&amp;hideThread=false&amp;id=848662054781235204&amp;lang=en&amp;origin=https%3A%2F%2Fwww.nasaspaceflight.com%2F2019%2F03%2Fexamining-nasas-challenge-sls-moon-soon-bold-goal%2F&amp;sessionId=dfcdefc36d9c73063d25de4288ca7a852ee106d2&amp;siteScreenName=NASASpaceflight&amp;theme=light&amp;widgetsVersion=6a3ad42b224df%3A1778106238597&amp;width=550px\" data-gtm-yt-inspected-14=\"true\" data-gtm-yt-inspected-21=\"true\" data-tweet-id=\"848662054781235204\"><\/iframe><\/p>\n<blockquote class=\"twitter-tweet\" data-width=\"550\" data-dnt=\"true\" data-twitter-extracted-i17834988967892887=\"true\">\n<p lang=\"en\" dir=\"ltr\">Ah, the Roller Coaster EES. pic.twitter.com\/THlhVQHeVB<\/p>\n<p>\u2014 Chris Bergin \u2013 NSF (@NASASpaceflight) April 2, 2017<\/p>\n<\/blockquote>\n<p>Numerous issues, including the somewhat overblown problem of \u201cThrust Oscillation\u201d impacts from Ares I on the Orion astronauts during first stage flight, required yet more reviews and changes to the vehicle.<\/p>\n<p>The problems \u2013 and resulting efforts to mitigate \u2013 all added to a steady stream of slips to the baseline schedule.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-60777\" class=\"size-full wp-image-60777\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2019\/03\/2019-03-27-164823.jpg\" alt=\"\" width=\"1295\" height=\"952\" srcset=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2019\/03\/2019-03-27-164823.jpg 1295w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2019\/03\/2019-03-27-164823-350x257.jpg 350w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2019\/03\/2019-03-27-164823-476x350.jpg 476w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2019\/03\/2019-03-27-164823-768x565.jpg 768w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2019\/03\/2019-03-27-164823-1170x860.jpg 1170w\" sizes=\"(max-width: 1295px) 100vw, 1295px\"><\/p>\n<p id=\"caption-attachment-60777\" class=\"wp-caption-text\">The CxP Manifest \u2013 which soon slipped by numerous years before its cancellation \u2013 via L2<\/p>\n<p>The schedule issues and calls for additional funding to be thrown at the problems became the straw that snapped the camels back for lawmakers, as the Augustine Commission was set up to review NASA\u2019s Human Space Flight plans in 2009.<\/p>\n<p>Alternatives, including the potential to postpone the Space Shuttle fleet\u2019s retirement, were presented.<\/p>\n<p>While the Commission did not specifically call for the cancellation of CxP in its findings, it did note the need for an influx of additional funding to try and get it back on track. That ultimately became too bitter a pill to swallow, leading to CxP\u2019s eventual cancellation and a new direction.<\/p>\n<p>That led to the birth of the&nbsp;Space Launch System (SLS),&nbsp;a \u201cShuttle Derived&nbsp;Heavy Lift Launch Vehicle\u201d \u2013 or SD HLV, as requested via the 2010 Authorization Act that gave birth to the vehicle design as NASA moved away from CxP and its Ares rockets.<\/p>\n<p>While the design of SLS went through a number of rigorous reviews \u2013 via the&nbsp;RAC (Requirements Analysis Cycle) effort&nbsp;\u2013 which allowed alternative rockets to be considered as NASA\u2019s next HLV, the political direction heavily weighted the decision-making process towards using existing technology from the Shuttle era.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-55945\" class=\"wp-image-55945 size-full\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2018\/04\/2018-04-11-184524.jpg\" alt=\"\" width=\"1010\" height=\"714\" srcset=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2018\/04\/2018-04-11-184524.jpg 1010w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2018\/04\/2018-04-11-184524-350x247.jpg 350w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2018\/04\/2018-04-11-184524-495x350.jpg 495w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2018\/04\/2018-04-11-184524-768x543.jpg 768w\" sizes=\"(max-width: 1010px) 100vw, 1010px\"><\/p>\n<p id=\"caption-attachment-55945\" class=\"wp-caption-text\">Slide used during the RAC to show many rockets were considered to become SLS \u2013 NASA\/L2<\/p>\n<p>Although that continues to be referenced by detractors, the plus side was the rocket would be making use of proven technology that had a rich heritage from the Shuttle era, not least the final salvo of flights that saw a flawless performance from the final iterations of the RS-25 and Solid Rocket Boosters (SRBs).<\/p>\n<p>However, that heritage also includes the large costs associated with the Shuttle program, which have \u2013 despite some streamlining \u2013 fed into the SLS program.<\/p>\n<p>Budget lines have shown SLS funding remaining strong, even at times to the detriment of the Commercial Crew program and other NASA flagship programs in an attempt to avoid the schedule slips suffered by CxP and keep its political support base in states such as Alabama happy.<\/p>\n<p>However, SLS has suffered from schedule slips, moving the original plan of launching Exploration Mission -1 (EM-1) in 2017 as far to the right as 2021. Most of the impacts have revolved around the Boeing-built Core Stage, although numerous other issues have been worked over the years.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-60311\" class=\"wp-image-60311 size-full\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2019\/02\/CS-1-Fwd-Join-Composite-Fix.jpg\" alt=\"\" width=\"3604\" height=\"2408\"><\/p>\n<p id=\"caption-attachment-60311\" class=\"wp-caption-text\">A composite of Core Stage build up for the EM-1 vehicle \u2013 via NASA<\/p>\n<p>That latest slip proved to be too much for NASA Administrator&nbsp;Jim Bridenstine who told lawmakers that the Agency would evaluate if an alternative commercial launch vehicle could take over the role of launching an uncrewed Orion around the Moon on EM-1.<\/p>\n<p>That proved to be a masterstroke from the Administrator, as the reaction from SLS, mostly Boeing, was that of \u201call hands to the pump\u201d to get the EM-1 launch date back into 2020.<\/p>\n<p>Within days, SLS sources were noting the launch date had been moved back to the left via some elimination of various test objectives that may no&nbsp;longer be deemed fully required for EM-1.<\/p>\n<p>The potential deletion of the Green Run at Stennis, where all four RS-25s are fired on the Core Stage for full flight duration could save around six months on the overall schedule and be deemed acceptable given the four RS-25s flying on EM-1 are all flight proven Shuttle veterans. However, the counter-argument relates to the Green Run test one that is for the benefit of the Core Stage systems, not just the engines.<\/p>\n<p>Changes to integration flows could also shave off some months, although those some of changes are questionable.<\/p>\n<p><iframe id=\"twitter-widget-2\" scrolling=\"no\" frameborder=\"0\" allowtransparency=\"true\" allowfullscreen=\"true\" class=\"\" style=\"position: static; visibility: visible; width: 0px; height: 0px; display: block; flex-grow: 1;\" title=\"X Post\" src=\"https:\/\/platform.twitter.com\/embed\/Tweet.html?creatorScreenName=NASASpaceflight&amp;dnt=true&amp;embedId=twitter-widget-2&amp;features=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%3D%3D&amp;frame=false&amp;hideCard=false&amp;hideThread=false&amp;id=1110609757549715456&amp;lang=en&amp;origin=https%3A%2F%2Fwww.nasaspaceflight.com%2F2019%2F03%2Fexamining-nasas-challenge-sls-moon-soon-bold-goal%2F&amp;sessionId=dfcdefc36d9c73063d25de4288ca7a852ee106d2&amp;siteScreenName=NASASpaceflight&amp;theme=light&amp;widgetsVersion=6a3ad42b224df%3A1778106238597&amp;width=550px\" data-gtm-yt-inspected-14=\"true\" data-gtm-yt-inspected-21=\"true\" data-tweet-id=\"1110609757549715456\"><\/iframe><\/p>\n<blockquote class=\"twitter-tweet\" data-width=\"550\" data-dnt=\"true\" data-twitter-extracted-i17834988967892887=\"true\">\n<p lang=\"en\" dir=\"ltr\">During today&#8217;s National Space Council meeting, Administrator @JimBridenstine says that he is confident we can have the first @NASA_SLS launch in 2020 and fly the @NASA_Orion crew capsule around the Moon. Watch: https:\/\/t.co\/mzKW5uDsTi pic.twitter.com\/fUWZg2fUbc<\/p>\n<p>\u2014 NASA (@NASA) March 26, 2019<\/p>\n<\/blockquote>\n<p>But SLS is on notice, as stressed by VP Pence this week in SLS\u2019s own backyard.<\/p>\n<p>\u201cDespite the dedication of the men and women who are designing and building and testing the SLS, you know the program has been plagued by inertia, by what some call the \u201cparalysis of analysis\u201d. The nation actually learned with great disappointment within recent weeks, that the date for the first flight of the SLS has been pushed back yet again to 2021,\u201d noted VP Pence, pulling no punches in the opening speech of the National Space Council.<\/p>\n<p>\u201cYou know, after years of cost overruns and slipped deadlines, we are actually being told that the earliest we can get back to the moon is 2028. Now that would be 18 years after the SLS program was started, and 11 years after the President of the United States directed NASA to return astronauts to the moon. Ladies and gentlemen, that\u2019s just not good enough. We are better than that.\u201d<\/p>\n<p>In announcing a plan to send US astronauts to the South Pole of the Moon by 2024, VP Pence told the audience that SLS had to be accelerated or else they\u2019d have to look at alternatives.<\/p>\n<p>\u201cThe first woman and the next man on the moon will both be American astronauts, launched by American rockets from American soil. But to accomplish this we must redouble our efforts, here in Huntsville and throughout this program.&nbsp;We must accelerate the SLS program to meet this objective,\u201d he added.<\/p>\n<\/p>\n<p><iframe title=\"Fifth Meeting of the National Space Council\" src=\"https:\/\/www.youtube.com\/embed\/ZQkoFuNWXg8?feature=oembed\" frameborder=\"0\" allow=\"accelerometer; autoplay; clipboard-write; encrypted-media; gyroscope; picture-in-picture; web-share\" allowfullscreen=\"\" name=\"fitvid0\" data-gtm-yt-inspected-14=\"true\" data-gtm-yt-inspected-21=\"true\"><\/iframe><\/p>\n<p>\u201cBut know this: The President has directed NASA and Administrator Jim Bridenstine to accomplish this goal by any means necessary. In order to succeed, as the Administrator will discuss today, we must focus on the mission over the means. You must consider every available option and platform to meet our goals, including industry, government, and the entire American space enterprise.<\/p>\n<h4 class=\"widget-title penci-border-arrow\">See Also<\/h4>\n<ul>\n<li>SLS Forum Section<\/li>\n<li>L2 SLS Section<\/li>\n<li>L2 SRB Section<\/li>\n<li>Click here to Join L2<\/li>\n<\/ul>\n<p>\u201c\u2026to be clear \u2013 we are not committed to any one contractor. If our current contractors cannot meet this objective, then we will find ones that will. If American industry can provide critical commercial services without government development, then we will buy them.<\/p>\n<p>\u201cAnd&nbsp;if commercial rockets are the only way to get American astronauts to the moon within the next five years, then commercial rockets it will be.&nbsp;Urgency must be our watchword; failure to achieve our goal to return an American astronaut to the moon in the next five years is not an option.\u201d<\/p>\n<p>In what seemed to be a case of Good Cop, Bad Cop, Mr. Bridenstine later came to the defense of SLS by noting the preliminary studies into using commercial rockets for EM-1 weren\u2019t viable and that SLS had indeed managed to find ways to move the schedule back to 2020.<\/p>\n<p>\u201cWe\u2019ve been under review for a lot of different commercial capabilities and what I can tell you is there is an opportunity there in the future. I will also tell you, if we want to achieve 2024, we have to have SLS, we have to accelerate its agenda,\u201d noted Mr&nbsp;Bridenstine.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-60693\" class=\"wp-image-60693 size-full\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2019\/03\/2019-03-19-170225.jpg\" alt=\"\" width=\"1299\" height=\"889\" srcset=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2019\/03\/2019-03-19-170225.jpg 1299w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2019\/03\/2019-03-19-170225-350x240.jpg 350w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2019\/03\/2019-03-19-170225-511x350.jpg 511w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2019\/03\/2019-03-19-170225-768x526.jpg 768w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2019\/03\/2019-03-19-170225-1170x801.jpg 1170w\" sizes=\"(max-width: 1299px) 100vw, 1299px\"><\/p>\n<p id=\"caption-attachment-60693\" class=\"wp-caption-text\">The EUS \u2013 as rendered by Nathan Koga for NSF\/L2<\/p>\n<p>He also stated the case for keeping the Exploration Upper Stage (EUS) which would allow SLS to grow to its far more capable Block 1B version. This would prove to be a quick stay of execution after doubts were made over its future role with SLS.<\/p>\n<p>\u201cWhen we talk about being able to co-manifest payloads \u2013 where we talk about putting humans on a spacecraft with habitation modules at the same time and delivering to the Moon \u2013 we\u2019re going to need an Exploration Upper Stage and we\u2019re probably going to need that early, by EM-3.<\/p>\n<p>Overall it would appear NASA want to stay the path with SLS, while opening up the future exploration goals to commercial rockets, should they prove to be a better option.<\/p>\n<p>The Coalition for Deep Space Exploration, which represents a large number of the main players in the space flight industry sounded optimistic while stating some key caveats.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-58466\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2018\/10\/L2-banner@2x.jpg\" alt=\"\" width=\"4500\" height=\"2532\">\u201cThough we support the focus of this White House on deep space exploration and the sense of urgency instilled by aggressive timelines and goals, we also are cognizant of the resources that will be required to meet these objectives.<\/p>\n<p>\u201cBold plans must be matched by bold resources made available in a consistent manner in order to assure successful execution. Similarly, the contracting mechanisms by which spacecraft, facilities, systems and supporting equipment are incorporated into a robust Moon-to-Mars architecture must be applied in a rapid and flexible manner with only the absolute minimum of bureaucratic process and oversight necessary to succeed.<\/p>\n<p>\u201cThis is especially true for technologies that have long been in use but continue to labor under excessive oversight during development \u2013 a burden that exacerbates cost, schedule, and program risks.\u201d<\/p>\n<p>Lockheed Martin also made a key point about the Lunar Gateway, which has become a major goal for NASA\u2019s early deep space plans. How VP Pence\u2019s 2024 goal for landing on the Moon impacts on the Gateway is yet to be fully known. Lockheed Martin seemed to provide one option to keep both projects on track.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-60224\" class=\"size-full wp-image-60224\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2019\/02\/201912-190318.jpg\" alt=\"\" width=\"1579\" height=\"846\" srcset=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2019\/02\/201912-190318.jpg 1579w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2019\/02\/201912-190318-350x188.jpg 350w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2019\/02\/201912-190318-630x338.jpg 630w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2019\/02\/201912-190318-768x411.jpg 768w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2019\/02\/201912-190318-1170x627.jpg 1170w\" sizes=\"(max-width: 1579px) 100vw, 1579px\"><\/p>\n<p id=\"caption-attachment-60224\" class=\"wp-caption-text\">The proposed Lunar Gateway (latest version) \u2013 envisioned by Nathan Koga for NSF\/L2<\/p>\n<p>\u201cLockheed Martin fully supports accelerating NASA\u2019s goal of landing humans on the surface of the Moon. We\u2019ve been conducting in-depth studies on what an accelerated landing schedule would require. With the right level of commitment, urgency and resources, humans could walk on the surface by 2024.<\/p>\n<p>\u201cOur concept would deploy an early version of the Gateway using only its propulsion module and docking port, which puts the critical enabling elements in lunar orbit as quickly as possible. It would also design the crewed lander around proven avionics, structures and propulsion systems from Orion\u2019s crew and service modules, which are already built for human-rated lunar exploration.\u201d<\/p>\n<p>Lockheed Martin is the main contract for the Orion crew spacecraft which will have a major role in both goals.<\/p>\n<p>One major element that also needs to be considered is the Lunar Lander.<\/p>\n<p>NASA was designing the Altair lander during the CxP days. However, this lander has a huge price tag, in the billions of dollars, to the point previous NASA Administrator Charlie Bolden claimed any return to the then-canceled Moon missions would all-but end NASA\u2019s ability to work on Mars missions.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-60784\" class=\"size-full wp-image-60784\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2019\/03\/2019-03-28-045917.jpg\" alt=\"\" width=\"1425\" height=\"789\" srcset=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2019\/03\/2019-03-28-045917.jpg 1425w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2019\/03\/2019-03-28-045917-350x194.jpg 350w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2019\/03\/2019-03-28-045917-630x350.jpg 630w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2019\/03\/2019-03-28-045917-768x425.jpg 768w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2019\/03\/2019-03-28-045917-1170x648.jpg 1170w\" sizes=\"(max-width: 1425px) 100vw, 1425px\"><\/p>\n<p id=\"caption-attachment-60784\" class=\"wp-caption-text\">NASA\u2019s Altair Lunar Lander \u2013 via NASA<\/p>\n<p>This time around, NASA will utilize a commercial company, allowing for a less expensive lander to be installed into the Moon plans.<\/p>\n<p>More decision points are expected over the coming weeks and months, as NASA\u2019s budget line is discussed and studies are updated per how SLS can make the 2020 target for EM-1.<\/p>\n<p><iframe id=\"twitter-widget-3\" scrolling=\"no\" frameborder=\"0\" allowtransparency=\"true\" allowfullscreen=\"true\" class=\"\" style=\"position: static; visibility: visible; width: 0px; height: 0px; display: block; flex-grow: 1;\" title=\"X Post\" src=\"https:\/\/platform.twitter.com\/embed\/Tweet.html?creatorScreenName=NASASpaceflight&amp;dnt=true&amp;embedId=twitter-widget-3&amp;features=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%3D%3D&amp;frame=false&amp;hideCard=false&amp;hideThread=false&amp;id=1111011689850376192&amp;lang=en&amp;origin=https%3A%2F%2Fwww.nasaspaceflight.com%2F2019%2F03%2Fexamining-nasas-challenge-sls-moon-soon-bold-goal%2F&amp;sessionId=dfcdefc36d9c73063d25de4288ca7a852ee106d2&amp;siteScreenName=NASASpaceflight&amp;theme=light&amp;widgetsVersion=6a3ad42b224df%3A1778106238597&amp;width=550px\" data-gtm-yt-inspected-14=\"true\" data-gtm-yt-inspected-21=\"true\" data-tweet-id=\"1111011689850376192\"><\/iframe><\/p>\n<blockquote class=\"twitter-tweet\" data-width=\"550\" data-dnt=\"true\" data-twitter-extracted-i17834988967892887=\"true\">\n<p lang=\"en\" dir=\"ltr\">Today NASA Administrator Jim Bridenstine said the agency is about two weeks from completing a study on accelerating the first SLS launch. Sources say that study is certain to recommend eliminating the Green Run test at Stennis.<\/p>\n<p>\u2014 Eric Berger (@SciGuySpace) March 27, 2019<\/p>\n<\/blockquote>\n<p>Sources note 2020 became the planning date (summer 2020) shortly after Mr.&nbsp;Bridenstine made his comments about commercial options for EM-1. However, there is major skepticism within the SLS workforce as to whether the replanning can buy back enough margin to be confident of making that target.<\/p>\n<p>SLS will need to make every effort to prove it can avoid causing a delay to VP Pence\u2019s 2024 target, not least with commercial space companies waiting in the wings for the call from a proactive new Administrator who has shown a willingness to take on the status quo.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Vice President Mike Pence has instructed NASA to land Americans on the Moon within the next five years. That was the headline from the latest National Space Council meeting this week. These words will require action and an influx of additional funding to stand a chance of becoming a reality. However, an overriding abstract behind [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":"","_links_to":"","_links_to_target":""},"categories":[2],"tags":[3718,625,640,624],"class_list":["post-38087","post","type-post","status-publish","format-standard","hentry","category-news","tag-em-1","tag-moon","tag-orion","tag-sls"],"acf":[],"_links":{"self":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/38087"}],"collection":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/comments?post=38087"}],"version-history":[{"count":0,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/38087\/revisions"}],"wp:attachment":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/media?parent=38087"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/categories?post=38087"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/tags?post=38087"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}