{"id":38101,"date":"2019-03-11T20:30:40","date_gmt":"2019-03-11T12:30:40","guid":{"rendered":"https:\/\/wp-productionenv-bjg9h2g2bgg5b8aa.southeastasia-01.azurewebsites.net\/news\/lockheed-martin-assembling-em-2-structures-for-nasas-first-crewed-orion-flight-2\/"},"modified":"2019-03-11T20:30:40","modified_gmt":"2019-03-11T12:30:40","slug":"lockheed-martin-assembling-em-2-structures-for-nasas-first-crewed-orion-flight-2","status":"publish","type":"post","link":"https:\/\/starpath.global\/news\/lockheed-martin-assembling-em-2-structures-for-nasas-first-crewed-orion-flight-2\/","title":{"rendered":"Lockheed Martin assembling EM-2 structures for NASA\u2019s first crewed Orion flight"},"content":{"rendered":"<p>While final assembly continues on the Orion spacecraft that will make the program\u2019s first solo flight, the major pieces of the next spacecraft are being assembled alongside for the first crewed mission. A crew of four is planned to take the spacecraft on a Lunar flyby during the Exploration Mission-2 (EM-2) test flight.<\/p>\n<p>The Crew Module and Crew Module Adapter are still mostly structures, but Orion prime contractor Lockheed Martin is working with NASA to assemble, integrate, and test the EM-2 elements in parallel with the final work being done with the Exploration Mission-1 (EM-1) spacecraft that will fly uncrewed. Once the primary and secondary structure installations are complete, technicians will begin welding fluid system lines and then eventually installing other components, including the systems to support the crew during EM-2.\n<\/p>\n<p>Crew Module primary structure proof tested<\/p>\n<p>The Crew Module is built around the pressure vessel that is the living and working area for Orion crews. The Exploration Mission-2 (EM-2) module recently completed its proof pressure test in the Operations and Checkout (O&amp;C) Building at the Kennedy Space Center (KSC) in Florida, following installation of additional hardware to fill out its primary structure.<\/p>\n<p>\u201cWe just completed it,\u201d Jules Schneider, Lockheed Martin Orion Assembly, Test, and Launch Operations (ATLO) Director at KSC, said during a mid-February interview. \u201cBest proof test we\u2019ve had to date.\u201d<\/p>\n<p>\u201cWhen I say \u2018best\u2019 the way I judge that is how many problems or how much the stress team struggled with any issues or data that they saw and it was a very quiet test,\u201d he explained. \u201cThey came in, the stress guys came in, we performed the test, and I didn\u2019t hear anything. I mean I didn\u2019t hear one issue. The data they saw was as predicted, so really a clean test.\u201d<\/p>\n<p><img fetchpriority=\"high\" decoding=\"async\" aria-describedby=\"caption-attachment-60573\" class=\"wp-image-60573 size-full\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2019\/03\/KSC-20190212-PH_KLS01_0014_large.jpg\" alt=\"\" width=\"1920\" height=\"1280\" srcset=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2019\/03\/KSC-20190212-PH_KLS01_0014_large.jpg 1920w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2019\/03\/KSC-20190212-PH_KLS01_0014_large-350x233.jpg 350w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2019\/03\/KSC-20190212-PH_KLS01_0014_large-525x350.jpg 525w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2019\/03\/KSC-20190212-PH_KLS01_0014_large-768x512.jpg 768w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2019\/03\/KSC-20190212-PH_KLS01_0014_large-1170x780.jpg 1170w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2019\/03\/KSC-20190212-PH_KLS01_0014_large-585x390.jpg 585w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2019\/03\/KSC-20190212-PH_KLS01_0014_large-263x175.jpg 263w\" sizes=\"(max-width: 1920px) 100vw, 1920px\"><\/p>\n<p id=\"caption-attachment-60573\" class=\"wp-caption-text\">The EM-2 Crew Module primary structure (left) as seen on February 12 during a tour of the O&amp;C Building by NASA astronaut candidate Kayla Barron and NASA astronaut Randy Bresnik. Credit: NASA\/Kim Shiflett.<\/p>\n<p>Crew Module pressure vessels are welded from seven structural components at the Michoud Assembly Facility (MAF) in New Orleans. The EM-2 article was completed in August and arrived at the O&amp;C Building on August 24.<\/p>\n<p>\u201cWe got the shell from Michoud, it went into our assembly jig, the famous birdcage, we put all the primary structure on that\u2019s required for proof test, did the proof test,\u201d Schneider noted.<\/p>\n<h4 class=\"widget-title penci-border-arrow\">See Also<\/h4>\n<ul>\n<li>Orion Forum Section<\/li>\n<li>     (adsbygoogle = window.adsbygoogle <\/li>\n<li>L2 Orion Section<\/li>\n<li>Click here to Join L2<\/li>\n<\/ul>\n<p>Following proof test, the friction-stir welds done at MAF last year were being retested. \u201cWe\u2019re back over near the birdcage,\u201d Schneider said. \u201cWe\u2019re actually doing the NDE (non-destructive evaluation) on the welds right now, the phased array [ultrasonic testing], and at the same time we\u2019re just getting started on the secondary structure installation on EM-2 Crew Module.\u201d<\/p>\n<p>\u201cA lot of the secondary structure are things like brackets that actually hold the tubing and align it so those are things you want to get in first,\u201d Scott Wilson, NASA\u2019s Production Operations Manager for the Orion Program, added. \u201cIt\u2019s also some of the work that\u2019s the dirtiest, right, with drilling.\u201d<\/p>\n<p>The secondary structure installation for the Crew Module is lengthy. \u201cThe crew module has literally hundreds of secondary structural elements and I\u2019m not talking two-hundred, I\u2019m probably talking closer to five-hundred so it takes a while,\u201d Schneider noted.<\/p>\n<p>Once structural assembly is completed, the module will go into the clean room where the tubing for the different fluid systems is attached and welded together. \u201cI think we\u2019re supposed to go into the clean room in the Summer, like July or something,\u201d he added.<\/p>\n<p>The tube welds will then be proof tested and leak checked and then technicians will begin integrating the core set of avionics and electrical systems to do an initial power-on (IPO) of the Crew Module. \u201cWhen you come out of the clean room, you start putting in all the avionics boxes because you want to get into initial power-on,\u201d Schneider said.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-60574\" class=\"wp-image-60574 size-full\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2019\/03\/KSC-20190212-PH_KLS01_0011_large.jpg\" alt=\"\" width=\"1920\" height=\"1280\" srcset=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2019\/03\/KSC-20190212-PH_KLS01_0011_large.jpg 1920w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2019\/03\/KSC-20190212-PH_KLS01_0011_large-350x233.jpg 350w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2019\/03\/KSC-20190212-PH_KLS01_0011_large-525x350.jpg 525w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2019\/03\/KSC-20190212-PH_KLS01_0011_large-768x512.jpg 768w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2019\/03\/KSC-20190212-PH_KLS01_0011_large-1170x780.jpg 1170w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2019\/03\/KSC-20190212-PH_KLS01_0011_large-585x390.jpg 585w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2019\/03\/KSC-20190212-PH_KLS01_0011_large-263x175.jpg 263w\" sizes=\"(max-width: 1920px) 100vw, 1920px\"><\/p>\n<p id=\"caption-attachment-60574\" class=\"wp-caption-text\">NASA astronaut candidate Kayla Barron takes a closer look at the EM-2 Crew Module primary structure during a February 12 tour of the O&amp;C Building at KSC. Credit: NASA\/Kim Shiflett.<\/p>\n<p>A second set of core avionics boxes was ordered to help with the EM-2 processing schedule. Although EM-1 spacecraft assembly is nearing completion, delays in launch mean it could still be almost two years off which could start impacting the assembly and test schedule for EM-2.<\/p>\n<p>\u201cI think the reason we went ahead and ordered the second set of core avionics is because we wanted to get to IPO as quickly as we can and I think we wanted to decouple IPO with the EM-2 CM from the EM-1 flight,\u201d Schneider said.<\/p>\n<p>\u201cOriginally we were going to take all the avionics out of EM-1 and basically recertify it and reuse it on EM-2,\u201d Wilson added. \u201cIf you do that you end up waiting a little while for that avionics to get through recert and that would be a challenge to the EM-2 schedule.\u201d<\/p>\n<p>\u201cWe call it \u2018core\u2019 because it\u2019s not every piece of avionics that we\u2019ve got a second set for but it\u2019s those key things that you need to get in early to enable EM-2\u2019s initial power-on,\u201d Wilson explained. \u201cThen those other things we\u2019ll sprinkle into the flow at the end and then the core set that\u2019s on EM-1 will still get recertified, but it\u2019ll go into a subsequent build.\u201d<\/p>\n<p>First time crew systems to be integrated with EM-2 spacecraft<\/p>\n<p>The major, in-space elements of the Orion spacecraft are the Crew Module and Service Module, with the latter divided into a Crew Module Adapter (CMA) and European Space Agency (ESA) Service Module (ESM). Lockheed Martin is the prime contractor for the Crew Module and CMA; Airbus Defence and Space is the prime contractor for the ESM.<\/p>\n<p>The Crew Module and Crew Module Adapter elements are delivered as essentially bare metal structures that Lockheed Martin assembles and integrates into working spacecraft modules in the O&amp;C Building at KSC.&nbsp;&nbsp;The ESM is assembled and integrated by Airbus in Bremen, Germany.<\/p>\n<p>The ESM is then transported to KSC for final assembly, first with the CMA and then with the Crew Module, a process the Orion assembly team is currently going through with the EM-1 spacecraft.&nbsp; In parallel, EM-2 spacecraft assembly work is going on in adjacent work areas in the O&amp;C.<\/p>\n<p>EM-2 is the third and final development flight for Orion during the current&nbsp;Design, Development, Test and Evaluation (DDT&amp;E) phase of the program.&nbsp; The crewed test flight planned for 2022 will make a long, high Earth orbit before looping around the Moon and returning.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-60584\" class=\"wp-image-60584 size-full\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2019\/03\/P1090637.35pct.jpg\" alt=\"\" width=\"1714\" height=\"1286\" srcset=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2019\/03\/P1090637.35pct.jpg 1714w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2019\/03\/P1090637.35pct-350x263.jpg 350w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2019\/03\/P1090637.35pct-466x350.jpg 466w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2019\/03\/P1090637.35pct-768x576.jpg 768w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2019\/03\/P1090637.35pct-1170x878.jpg 1170w\" sizes=\"(max-width: 1714px) 100vw, 1714px\"><\/p>\n<p id=\"caption-attachment-60584\" class=\"wp-caption-text\">A development version of the Orion crew display units and switch indicator panels as seen at Johnson Space Center in April, 2018. Credit: Philip Sloss for NSF\/L2.<\/p>\n<p>The first Exploration Flight Test-1 (EFT-1) mission launched a working, but uncrewed version of the Crew Module with mass simulators for the Service Module elements. The EFT-1 Orion flew two Earth orbits, remaining attached to the Delta 4 Heavy upper stage until shortly before re-entry.<\/p>\n<p>EM-1 is the second test flight, which adds a working Service Module to a second generation Crew Module. NASA is still hoping to launch that flight by the end of 2020; Orion will make its first solo flight, going into Lunar orbit for a half or one and a half revolutions before returning to Earth.<\/p>\n<p>The spacecraft configuration for EM-2 adds all the equipment and additional supplies to support a four-person crew for up to twenty-one days on a standalone mission.&nbsp; \u201cThe main difference between EM-1 and EM-2 is just that, it\u2019s really the crew interface and the suit interface,\u201d Schneider said.<\/p>\n<p>\u201cThe waste management system is not flying on EM-1, the displays, the flat panel displays because there\u2019s no one to look or touch it, you know to issue to commands, those kinds of things are the things that we\u2019re not flying on EM-1.\u201d<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-60569\" class=\"wp-image-60569 size-full\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2019\/03\/20140003892.Figure-8.Crew-Module-Internal-Layout.jpg\" alt=\"\" width=\"1311\" height=\"937\" srcset=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2019\/03\/20140003892.Figure-8.Crew-Module-Internal-Layout.jpg 1311w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2019\/03\/20140003892.Figure-8.Crew-Module-Internal-Layout-350x250.jpg 350w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2019\/03\/20140003892.Figure-8.Crew-Module-Internal-Layout-490x350.jpg 490w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2019\/03\/20140003892.Figure-8.Crew-Module-Internal-Layout-768x549.jpg 768w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2019\/03\/20140003892.Figure-8.Crew-Module-Internal-Layout-1170x836.jpg 1170w\" sizes=\"(max-width: 1311px) 100vw, 1311px\"><\/p>\n<p id=\"caption-attachment-60569\" class=\"wp-caption-text\">Presentation figure showing basic layout of fully outfitted crew module, which will fly for the first time on EM-2. Credit: NASA.<\/p>\n<p>A fully functioning Environmental Control and Life Support System (ECLSS) will be integrated for the first time on EM-2; in addition to waste management, there are systems for (among other things) air revitalization, fire detection and suppression, and cabin pressure and temperature management. Displays and controls for the crew to monitor the vehicle and also command and control operations when needed will be installed on EM-2, along with space-to-ground communication systems and seats used during dynamic phases of flight like ascent and entry.<\/p>\n<p>Additional avionics boxes and software functionality are also being integrated into Orion\u2019s computer systems on EM-2 to support the crew.<\/p>\n<p>Crew Module Adapter structural assembly<\/p>\n<p>The structures for the donut-shaped Crew Module Adapter arrived at KSC early in the year to begin structural assembly. \u201cWe received we call it the inner wall, which is now an inner ring,\u201d Schneider said. \u201cWe received that in late January. It\u2019s already loaded into the assembly jig and the metallic structure, the longerons and the intermediate frames have all been loaded into the tool and we\u2019re in the process of mechanically assembling all that.\u201d<\/p>\n<p>\u201cSo when you do that you put the longerons up against it, locate it using the laser, you know lasers to shoot it in, and then the drilling I think we\u2019ve already begun the drilling of four of the longerons,\u201d Wilson added.<\/p>\n<p>Schneider also noted: \u201cThe composite walls are starting to show up, the aft walls and the forward walls.\u201d<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-60575\" class=\"wp-image-60575 size-full\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2019\/03\/KSC-20161111-PH_GEB01_0103_large.jpg\" alt=\"\" width=\"1920\" height=\"1280\" srcset=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2019\/03\/KSC-20161111-PH_GEB01_0103_large.jpg 1920w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2019\/03\/KSC-20161111-PH_GEB01_0103_large-350x233.jpg 350w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2019\/03\/KSC-20161111-PH_GEB01_0103_large-525x350.jpg 525w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2019\/03\/KSC-20161111-PH_GEB01_0103_large-768x512.jpg 768w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2019\/03\/KSC-20161111-PH_GEB01_0103_large-1170x780.jpg 1170w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2019\/03\/KSC-20161111-PH_GEB01_0103_large-585x390.jpg 585w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2019\/03\/KSC-20161111-PH_GEB01_0103_large-263x175.jpg 263w\" sizes=\"(max-width: 1920px) 100vw, 1920px\"><\/p>\n<p id=\"caption-attachment-60575\" class=\"wp-caption-text\">The EM-1 Crew Module Adapter structure in November, 2016, during a lift prior to moving to the clean room for welding work. Several of the longerons around the radius of the inner wall, the aft wall panels on the bottom of the CMA, and the ground umbilical plate can be seen. Credit: NASA\/Glenn Benson.<\/p>\n<p>The inner ring structure was redesigned from a set of composite panels to a single, machined piece of metal for EM-2.<\/p>\n<p>\u201cThe inner ring as Jules said comprises the inner wall of it,\u201d Wilson said. \u201cIt used to be as Mark (Kirasich) probably told you multiple pieces that was somewhat flexible [and] caused a lot of issues in manufacturing, so we\u2019ve gone to this single milled ring.\u201d<\/p>\n<p>\u201cThat\u2019s the inner mold line, kind of the center of the donut of the CMA and then around that radially go the longerons,\u201d he added. \u201cThere\u2019s primary longerons that are I think at six locations around it that comprise the load path all the way down into the ESM below it and the load path all way up through the longerons in the crew module.\u201d<\/p>\n<p>\u201cAnd then between those six there\u2019s what we call intermediate frames which provide the structure to it, but they\u2019re not the primary load paths. And so those are the main things and then there\u2019s some other frames, umbilical frames and different things in there but for the most part it\u2019s the longerons and the intermediate frames.\u201d<\/p>\n<p>\u201cThe reason we call it the Crew Module Adapter is because it\u2019s got all the interfaces between the Crew Module and Service Module so the umbilical frames, the ground umbilical is also in the CMA so you got frames that attach to ground umbilical plates,\u201d Schneider explained.<\/p>\n<p>\u201cAnd then the two PDUs (Power Data Units) in the Service Module are housed in there, so there\u2019s cold plates that have to go in and a lot of similar stuff in there to what\u2019s in the Crew Module. We\u2019ve got active thermal control in there and then all the electrical systems, wiring, all that stuff.\u201d<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-60576\" class=\"wp-image-60576 size-full\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2019\/03\/KSC-20161129-PH_JBS01_0145_large.jpg\" alt=\"\" width=\"1920\" height=\"1280\" srcset=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2019\/03\/KSC-20161129-PH_JBS01_0145_large.jpg 1920w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2019\/03\/KSC-20161129-PH_JBS01_0145_large-350x233.jpg 350w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2019\/03\/KSC-20161129-PH_JBS01_0145_large-525x350.jpg 525w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2019\/03\/KSC-20161129-PH_JBS01_0145_large-768x512.jpg 768w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2019\/03\/KSC-20161129-PH_JBS01_0145_large-1170x780.jpg 1170w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2019\/03\/KSC-20161129-PH_JBS01_0145_large-585x390.jpg 585w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2019\/03\/KSC-20161129-PH_JBS01_0145_large-263x175.jpg 263w\" sizes=\"(max-width: 1920px) 100vw, 1920px\"><\/p>\n<p id=\"caption-attachment-60576\" class=\"wp-caption-text\">The EM-1 Crew Module Adapter inside protective covering at the end of November, 2016, during work to move it into the clean room. Once the primary and secondary structures are outfitted on the EM-2 CMA it will follow the same path through integration and test. Credit: NASA\/Ben Smegelsky.<\/p>\n<p>The CMA will go through an outline of work similar to the Crew Module. \u201cIt\u2019s not quite as long because it\u2019s not as big and complicated \u2014 it doesn\u2019t have as many components as the Crew Module does,\u201d Schneider noted.<\/p>\n<p>\u201cIt pretty much has the same exact sequencing from a life cycle standpoint that the Crew Module has \u2014 you do the structure first,\u201d he continued. \u201cNow there\u2019s no structural welds, so you don\u2019t have to do a structural proof test like you do on the crew module; but as soon as you get it structurally complete, you know it\u2019s got secondary structure just like the crew module, you\u2019ve got to do all that.\u201d<\/p>\n<p>\u201cThen you go into the clean room and you have to integrate all the fluid systems just like you do on the crew module, [you] come out, you do a proof test on the welds on the tubes just like the crew module, and then you go into integrating all the avionics and electrical components.\u201d<\/p>\n<p>Heatshield, ESM work<\/p>\n<p>Another major hardware element is still being fabricated off site. \u201cLockheed Martin Space in Denver builds the substrate, the structural elements of the heatshield,\u201d Schneider said. \u201cIt\u2019s in assembly as we speak.\u201d<\/p>\n<p>\u201cIt\u2019s due here not too long from now and I think it\u2019s on track to make it, so it\u2019s in good shape. It\u2019s a titanium truss with a composite substrate that goes over it that we bond the Avcoat blocks to. They\u2019ve had a few challenges with it but I think they\u2019ve worked through it and I think it\u2019s coming to us in the Spring or in the Summer and we\u2019ll start processing it, putting the Avcoat on it.\u201d<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-60568\" class=\"wp-image-60568 size-full\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2019\/03\/tanks-orion-flight-model-2.jpg\" alt=\"\" width=\"1920\" height=\"1280\" srcset=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2019\/03\/tanks-orion-flight-model-2.jpg 1920w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2019\/03\/tanks-orion-flight-model-2-350x233.jpg 350w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2019\/03\/tanks-orion-flight-model-2-525x350.jpg 525w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2019\/03\/tanks-orion-flight-model-2-768x512.jpg 768w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2019\/03\/tanks-orion-flight-model-2-1170x780.jpg 1170w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2019\/03\/tanks-orion-flight-model-2-585x390.jpg 585w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2019\/03\/tanks-orion-flight-model-2-263x175.jpg 263w\" sizes=\"(max-width: 1920px) 100vw, 1920px\"><\/p>\n<p id=\"caption-attachment-60568\" class=\"wp-caption-text\">Two of the four propellant tanks that will be installed in the second ESM following arrival at the Airbus ESM assembly, integration, and test (AIT) facility in Bremen, Germany. ESM Flight Model-2 will fly on the EM-2 mission. Credit: Airbus Defence and Space.<\/p>\n<p>Meanwhile assembly, integration, and test of ESM Flight Model-2 (FM-2) continues in Bremen. Airbus recently posted a photo marking the arrival of two of the large hypergolic propellant tanks there.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>While final assembly continues on the Orion spacecraft that will make the program\u2019s first solo flight, the major pieces of the next spacecraft are being assembled alongside for the first crewed mission. A crew of four is planned to take the spacecraft on a Lunar flyby during the Exploration Mission-2 (EM-2) test flight. The Crew [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":"","_links_to":"","_links_to_target":""},"categories":[2],"tags":[4011,640],"class_list":["post-38101","post","type-post","status-publish","format-standard","hentry","category-news","tag-em-2","tag-orion"],"acf":[],"_links":{"self":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/38101"}],"collection":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/comments?post=38101"}],"version-history":[{"count":0,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/38101\/revisions"}],"wp:attachment":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/media?parent=38101"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/categories?post=38101"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/tags?post=38101"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}