{"id":38343,"date":"2018-07-30T18:59:41","date_gmt":"2018-07-30T10:59:41","guid":{"rendered":"https:\/\/wp-productionenv-bjg9h2g2bgg5b8aa.southeastasia-01.azurewebsites.net\/news\/asap-reviews-boeing-failure-positive-spacex-success-ahead-of-commercial-crew-announcement\/"},"modified":"2018-07-30T18:59:41","modified_gmt":"2018-07-30T10:59:41","slug":"asap-reviews-boeing-failure-positive-spacex-success-ahead-of-commercial-crew-announcement","status":"publish","type":"post","link":"https:\/\/starpath.global\/news\/asap-reviews-boeing-failure-positive-spacex-success-ahead-of-commercial-crew-announcement\/","title":{"rendered":"ASAP reviews Boeing failure, positive SpaceX success ahead of Commercial Crew announcement"},"content":{"rendered":"<p>As NASA prepares to provide updated launch date targets for the uncrewed and crewed Commercial Crew demonstration missions from both SpaceX and Boeing \u2013 as well as flight crew assignments for each provider \u2013 the agency\u2019s Aerospace Safety Advisory Panel (ASAP) held its quarterly meeting last Thursday, during which they outlined a failure on Boeing\u2019s part that could potentially lead to a redesign of a critical element of Starliner. &nbsp;The ASAP also outlined multiple points of positive progress on SpaceX\u2019s part.<\/p>\n<p><b>Boeing suffers critical failure with Starliner:<\/b><\/p>\n<p>As was first reported by Eric Berger on Ars Technica, Boeing suffered a test stand failure of Starliner\u2019s critical pad abort thrusters in late-June, a failure that reportedly ended with the leaking of volatile propellant from the thruster system.<\/p>\n<p>In multiple statements to numerous outlets thereafter, Boeing stated that they were \u201cconfident we found the cause and are moving forward with corrective action.\u201d<\/p>\n<p>But that wasn\u2019t quite the take-away from the ASAP meeting that occurred days after the company issued its statement.<\/p>\n<p>\u201cBoeing recently conducted a hot fire test for their low-altitude abort milestone for the CST-100,\u201d noted a member of the ASAP panel. &nbsp;\u201cAnd there was an anomaly on that test that we need to better understand in terms of its potential impact on the design and operation and the schedule.<\/p>\n<p><img fetchpriority=\"high\" decoding=\"async\" aria-describedby=\"caption-attachment-54180\" class=\"size-full wp-image-54180\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2018\/01\/NSF_20180104_191300.jpg\" alt=\"\" width=\"1652\" height=\"904\" srcset=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2018\/01\/NSF_20180104_191300.jpg 1652w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2018\/01\/NSF_20180104_191300-350x192.jpg 350w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2018\/01\/NSF_20180104_191300-630x345.jpg 630w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2018\/01\/NSF_20180104_191300-768x420.jpg 768w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2018\/01\/NSF_20180104_191300-1170x640.jpg 1170w\" sizes=\"(max-width: 1652px) 100vw, 1652px\"><\/p>\n<p id=\"caption-attachment-54180\" class=\"wp-caption-text\">Abort testing Starliner \u2013 by Nathan Koga for NSF\/L2<\/p>\n<p>\u201cAnd so although there\u2019s a lot of interest in this issue, Boeing has asked for some additional time to step back and understand that a little better.\u201d<\/p>\n<h4 class=\"widget-title penci-border-arrow\">See Also<\/h4>\n<ul>\n<li>Starliner\/CST-100 Forum<\/li>\n<li>ULA Forum Section<\/li>\n<li>L2&nbsp;Commercial Crew<\/li>\n<li>Click here to Join L2<\/li>\n<\/ul>\n<p>During its admittedly brief discussion of Boeing, ASAP members made no mention of any potential corrective action, instead indicating that Boeing was still in the process of understanding exactly what happened with the failure.<\/p>\n<p>Space Shuttle models<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>NASA mission patches<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>Spaceflight news subscription<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>\n<p>     (adsbygoogle = window.adsbygoogle || []).push({});<\/p>\n<p>It is possible that ASAP was referring to information that predated the Boeing statement; however, it is also possible that the panel \u2013 which provides a cautious and measured approach \u2013 had not yet been presented evidence of such corrective action for the abort thruster issue.<\/p>\n<p>Regardless, one thing was clear from ASAP: Boeing\u2019s current schedules for both their uncrewed and crew test flights, known as the Orbital Flight Test (OFT) and the Crew Flight Test (CFT), respectively, are in a state of flux and not well understood.<\/p>\n<p>\u201cWe can expect some uncertainty and their near-term schedules at least for the Boeing provider while they go through that,\u201d noted the ASAP. &nbsp;\u201cAnd then we should have a much better sense of the Orbital Flight Test and the Crew Flight Test for that provider.\u201d\n<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-57441\" class=\"size-full wp-image-57441\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2018\/07\/2018-07-30-184032.jpg\" alt=\"\" width=\"1825\" height=\"877\" srcset=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2018\/07\/2018-07-30-184032.jpg 1825w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2018\/07\/2018-07-30-184032-350x168.jpg 350w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2018\/07\/2018-07-30-184032-630x303.jpg 630w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2018\/07\/2018-07-30-184032-768x369.jpg 768w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2018\/07\/2018-07-30-184032-1170x562.jpg 1170w\" sizes=\"(max-width: 1825px) 100vw, 1825px\"><\/p>\n<p id=\"caption-attachment-57441\" class=\"wp-caption-text\">Starliner launches atop an Atlas V N22 rocket from Cape Canaveral Air Force Station, FL, carrying new crewmembers to the International Space Station (Credit: Nathan Koga, for NSF\/L2).<\/p>\n<p>This statement is telling, especially ahead of NASA\u2019s plan to announce new target launch dates for the OFT and CFT missions for Boeing (as well as for both of SpaceX\u2019s uncrewed and crewed missions) this Friday, 3 August, at an event at the agency\u2019s Johnson Space Center.<\/p>\n<p>With this ASAP statement, it is now understood that those dates for Boeing to be announced Friday might not be completely realistic as the company continues to work through mitigation and potential redesign, as stated by ASAP, resulting from the test stand issue.<\/p>\n<p><b>Praise for SpaceX, but still work to do:<\/b><\/p>\n<p>Contrasting quite significantly from the above, the ASAP panel had high praise for SpaceX regarding a number of areas related to the production of the crew Dragon and the Falcon 9 boosters that will be used to launch the crew craft to the International Space Station.<\/p>\n<p>Of particular note in the panel\u2019s praise for SpaceX was the company\u2019s strides both at innovation and adaptability while also developing procedures and computer tracking systems to greatly aid in Systems Engineering &amp; Integration (SE&amp;I) to properly track all changes to the vehicle and understand how those changes relate to the overall integrated design for crew Dragon and the Falcon 9 rocket.<\/p>\n<p>In fact, perhaps no better praise for these tools and systems came from an ASAP member who said they \u201cwould have been great to have for the Space Shuttle program\u201d \u2013 which ASAP member, and former NASA astronaut Lieutenant General (Ret.) Susan Helms noted \u201cwas a great \u2018attaboy\u2019 for the program\u2019s current visions of how the tools are not just evolving but how the SpaceX force is adapting to using them.\u201d<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-57136\" class=\"size-full wp-image-57136\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2018\/07\/2018-07-13-134628.jpg\" alt=\"\" width=\"1880\" height=\"893\" srcset=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2018\/07\/2018-07-13-134628.jpg 1880w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2018\/07\/2018-07-13-134628-350x166.jpg 350w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2018\/07\/2018-07-13-134628-630x299.jpg 630w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2018\/07\/2018-07-13-134628-768x365.jpg 768w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2018\/07\/2018-07-13-134628-1170x556.jpg 1170w\" sizes=\"(max-width: 1880px) 100vw, 1880px\"><\/p>\n<p id=\"caption-attachment-57136\" class=\"wp-caption-text\">Crew Dragon heads uphill on the Falcon 9 \u2013 via Nathan Koga for NSF\/L2<\/p>\n<p>ASAP discussed these positive attributes for SpaceX while discussing the Commercial Crew Program\u2019s (CCP\u2019s) overall positive progress on strategies and approaches to meeting the panel\u2019s SE&amp;I recommendations.<\/p>\n<h4 class=\"widget-title penci-border-arrow\">See Also<\/h4>\n<ul>\n<li>DM-1 Mission General Thread<\/li>\n<li>SpaceX&nbsp;Missions Forum Section<\/li>\n<li>L2 SpaceX Section<\/li>\n<li>Click here to Join L2<\/li>\n<\/ul>\n<p>\u201cYou can never review enough times what SE&amp;I principals actually mean,\u201d noted Lt. Gen. (Ret.) Helms. &nbsp;\u201cIt means understanding the margins of the integrated system designs, verifying that those margins exist through test and analysis, and then controlling both the configuration and the operation of the system to ensure those margins exist when flown and that these principles are both absolutely essential for culture and practice to achieve the best possible outcomes for the safety of space flight.\u201d<\/p>\n<p>Lt. Gen. (Ret.) Helms also had great praise for SpaceX\u2019s \u201cextreme transparency\u201d with the CCP office on all of their data, \u201cincluding how the tools can help them with risk management.<\/p>\n<p>\u201cAssuming that the program continues to have confidence that SpaceX\u2019s principles are evolving in a way that gets them to meeting the intent of our recommendations, it looks like things are on a good path to what we had originally intended with our recommendations.\u201d<\/p>\n<p>Nonetheless, there were a couple of issues (more items to watch than issues) ASAP brought forward regarding SpaceX in relation to vehicle hardware.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-57283\" class=\"size-full wp-image-57283\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2018\/07\/16166753344_79516c7f5c_k.jpg\" alt=\"\" width=\"2048\" height=\"1365\" srcset=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2018\/07\/16166753344_79516c7f5c_k.jpg 2048w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2018\/07\/16166753344_79516c7f5c_k-350x233.jpg 350w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2018\/07\/16166753344_79516c7f5c_k-525x350.jpg 525w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2018\/07\/16166753344_79516c7f5c_k-768x512.jpg 768w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2018\/07\/16166753344_79516c7f5c_k-1920x1280.jpg 1920w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2018\/07\/16166753344_79516c7f5c_k-1170x780.jpg 1170w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2018\/07\/16166753344_79516c7f5c_k-585x390.jpg 585w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2018\/07\/16166753344_79516c7f5c_k-263x175.jpg 263w\" sizes=\"(max-width: 2048px) 100vw, 2048px\"><\/p>\n<p id=\"caption-attachment-57283\" class=\"wp-caption-text\">The CRS-4 Dragon prepares for splashdown in the Pacific Ocean. Credit: SpaceX<\/p>\n<p>One such area is an upcoming change to the vendor that provides the parachute reef line cutters for Dragon. &nbsp;The original vendor selected by SpaceX was the only NASA-qualified vendor for reef line cutters, and it had to serve Dragon, Starliner, and Orion. <\/p>\n<p>That vendor is an extremely small company, and challenges in ensuring the quantity and \u2013 most importantly \u2013 the quality of the delivered product due to increased demand from the three crewed vehicles developed.<\/p>\n<p>As such, SpaceX made the decision to switch vendors to ensure a continuous and quality supply of reef line cutters. &nbsp;That new vendor is currently going through the qualification process, which is nearing completion.<\/p>\n<p>What SpaceX is now in the process of deciding is on which mission they will switch to the new vendor\u2019s hardware \u2013 the uncrewed DM-1 flight or the crewed DM-2 mission.<\/p>\n<p>The parachutes for the DM-1 mission have already been packed inside the crew Dragon capsule, and changing out the reef line cutters would delay the DM-1 flight. &nbsp;SpaceX is actively engaged in risk management and risk posture discussions for potentially switching to the new reef line cutters on the crewed DM-2 flight, with ASAP noting that they are eagerly awaiting the results of those discussions.<\/p>\n<p><iframe id=\"twitter-widget-1\" scrolling=\"no\" frameborder=\"0\" allowtransparency=\"true\" allowfullscreen=\"true\" class=\"\" style=\"position: static; visibility: visible; width: 0px; height: 0px; display: block; flex-grow: 1;\" title=\"X Post\" src=\"https:\/\/platform.twitter.com\/embed\/Tweet.html?creatorScreenName=NASASpaceflight&amp;dnt=true&amp;embedId=twitter-widget-1&amp;features=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%3D%3D&amp;frame=false&amp;hideCard=false&amp;hideThread=false&amp;id=623296314600656897&amp;lang=en&amp;origin=https%3A%2F%2Fwww.nasaspaceflight.com%2F2018%2F07%2Fasap-boeing-failure-positive-spacex-crew-announcement%2F&amp;sessionId=5318861a1e0a75b51cfda96e64b322e24ea1f9f2&amp;siteScreenName=NASASpaceflight&amp;theme=light&amp;widgetsVersion=6a3ad42b224df%3A1778106238597&amp;width=550px\" data-gtm-yt-inspected-14=\"true\" data-gtm-yt-inspected-21=\"true\" data-tweet-id=\"623296314600656897\"><\/iframe><\/p>\n<blockquote class=\"twitter-tweet\" data-width=\"550\" data-dnt=\"true\" data-twitter-extracted-i1783498527302263537=\"true\">\n<p lang=\"en\" dir=\"ltr\">Summary of preliminary findings regarding CRS-7 mission, further investigation may reveal more over time \u2192 http:\/\/t.co\/YFFsT2PCwB<\/p>\n<p>\u2014 SpaceX (@SpaceX) July 21, 2015<\/p>\n<\/blockquote>\n<p>Another area of discussion related to the COPVs, Composite Overwrap Pressure Vessels, that will be used in the Falcon 9 rocket, new COPV designs set to debut on the uncrewed DM-1 mission with Falcon 9 core B1051.<\/p>\n<p>According to ASAP, \u201cWe\u2019ve learned a lot this week about a very detailed and structured approach for certification of the COPVs used on the SpaceX design. &nbsp;There\u2019s been a lot of testing and a lot of follow-up and investigations to try to understand the physics of things like what could cause potential ignition mechanisms or other failure mechanisms. &nbsp;<\/p>\n<p>\u201cAnd the panel really wants to commend the deep dive team [for their work], but we do recognize that there\u2019s still a lot of work to do. &nbsp;The jury is still out on this.&nbsp; And we look forward to seeing what the results of what this work will mean in terms of final characterization of the risk and whether that risk will be acceptable. &nbsp;And if not, what further risk mitigation measures might be necessary concerning those COPVs.\u201d<\/p>\n<p>Another area to watch \u2013 one that ASAP believes is on course to a \u201csatisfactory conclusion\u201d \u2013 relates the Falcon 9\u2019s Merlin 1D engines and their upgrades for crew configuration. &nbsp;\u201cThe first two engine started to go through the qualification procedure, and upon tear down there were observations of some anomalies in the hardware that were considered potentially dangerous \u2013 certainly not desirable,\u201d noted the ASAP. <\/p>\n<p>\u201cThere was a program undertaken to try to modify the design and to correct these anomalies. &nbsp;SpaceX and NASA agreed on a requalification plan that actually includes six engines \u2013 two ground test configurations and one in-flight test configuration.\u201d<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-57135\" class=\"size-full wp-image-57135\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2018\/07\/2018-07-13-134545.jpg\" alt=\"\" width=\"1572\" height=\"929\" srcset=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2018\/07\/2018-07-13-134545.jpg 1572w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2018\/07\/2018-07-13-134545-350x207.jpg 350w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2018\/07\/2018-07-13-134545-592x350.jpg 592w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2018\/07\/2018-07-13-134545-768x454.jpg 768w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2018\/07\/2018-07-13-134545-1170x691.jpg 1170w\" sizes=\"(max-width: 1572px) 100vw, 1572px\"><\/p>\n<p id=\"caption-attachment-57135\" class=\"wp-caption-text\">The Block 5 Falcon 9 takes a Crew Dragon to space during one of SpaceX\u2019s upcoming Demonstration Missions. (Credit: Nathan Koga for NSF\/L2)<\/p>\n<p>As work on this issue continued, SpaceX developed two short-term corrective actions that are deemed worthy and safe to fly on the uncrewed DM-1 mission. &nbsp;At the same time, SpaceX began designing and implementing two longer-term solutions to the anomaly seen on the test stand. <\/p>\n<p>The ASAP noted that the two short term actions could also potentially be used on the crewed DM-2 flight should they prove safe enough during post-flight and post-test stand teardown and inspections. &nbsp;A decision on whether those short-term actions can fly on the crew demonstration mission will not be taken until a better understanding of the short-term actions are known.<\/p>\n<p>Nonetheless, the ASAP is \u201coptimistic that those courses of action will result in a satisfactory conclusion.\u201d<\/p>\n<p><b>Final Certification \u2013 a discussion:<\/b><\/p>\n<p>Through all of this, the ASAP was primarily quite pleased with the overall status of the Commercial Crew Program and the current final drive toward certification of the products being delivered by the two providers. <\/p>\n<p>There was a specific note that no schedule pressure was observed during the latest round of oversight meetings, with both providers acutely aware of the safety and risk factors involved and that those take precedence over any perceived\/looming desire to see the programs up and running.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-56497\" class=\"size-full wp-image-56497\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2018\/05\/2018-05-23-193321.jpg\" alt=\"\" width=\"1340\" height=\"600\" srcset=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2018\/05\/2018-05-23-193321.jpg 1340w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2018\/05\/2018-05-23-193321-350x157.jpg 350w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2018\/05\/2018-05-23-193321-630x282.jpg 630w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2018\/05\/2018-05-23-193321-768x344.jpg 768w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2018\/05\/2018-05-23-193321-1170x524.jpg 1170w\" sizes=\"(max-width: 1340px) 100vw, 1340px\"><\/p>\n<p id=\"caption-attachment-56497\" class=\"wp-caption-text\">With a Starliner docked safely to ISS, a crew Dragon approaches the Station using the C2V2 radio. (Credit: Nathan Koga for NSF\/L2)<\/p>\n<p>However, \u201cas we approach the certification milestones, we still have to be assured that not only will the component hardware design be ready for certification, but that the overall integrated risk of human spaceflight missions can be effectively managed in both the design of the hardware and the operational practices of using the hardware,\u201d noted the ASAP.<\/p>\n<p>To that end, one ASAP member took time to discuss, in detail, what certification of these products actually means. &nbsp;During his statements, Dr. Don McErlean sought to clarify for everyone what the final certification process entailed \u2013 as it is often referred to as a \u201cpaper process.\u201d<\/p>\n<p>\u201cIt needs to be noted by everyone, and we\u2019re especially interested in making sure that all of the external stakeholders realize this, that while the concluding process of certification has sometimes been described as a paper process, that is really just a shorthand clarification and in reality it could not be further from the truth,\u201d noted Dr. McErlean. &nbsp;<\/p>\n<p>In reality, the process is as follows. &nbsp;\u201cIn a certified design, the design agent \u2013 the contractor or partner in this case \u2013 performs the design and in the certification plan, the design agent and the certification agency (NASA) agree on the submittal of certification evidence.<\/p>\n<p>\u201cThis could be measurements, it can be test data, it can be analysis, but it almost always involves the submittal of detailed technical data, not simply paper descriptions or forms. &nbsp;Sometimes it involves witness testing and sometimes it involves physical inspection. But it almost always wraps around important technical submittals.<\/p>\n<\/p>\n<p><iframe title=\"Progress for NASA's Commercial Crew Program\" src=\"https:\/\/www.youtube.com\/embed\/UVnrb_Z2Wnk?feature=oembed\" frameborder=\"0\" allow=\"accelerometer; autoplay; clipboard-write; encrypted-media; gyroscope; picture-in-picture; web-share\" allowfullscreen=\"\" name=\"fitvid0\" data-gtm-yt-inspected-14=\"true\" data-gtm-yt-inspected-21=\"true\"><\/iframe><\/p>\n<p>\u201cThe technical arm of the certifying agency \u2013 NASA in this case \u2013 then reviews and analyzes that data to validate that in fact the design meets the stated requirements with the expected margins. &nbsp;This validation activity extends to many aspects of the design and also to the operation of the integrated mechanism or the entire system. Once the certifying agency agrees that these validations are correct and acceptable, then it certifies the design and then we can state that we have run to conclusion of the certification process.<\/p>\n<p>\u201cIt is this technical review of certification data and products which in fact constitutes the work required to conclude the certification process, and if successful, results in the agency in fact certifying the design.<\/p>\n<p>\u201cIn short, we want everyone to realize that this is not a paper sign off process. &nbsp;It involves considerable detailed technical activity by both the certifying agency \u2013 NASA in this case \u2013 and the design agency or the contractor or partner as well.<\/p>\n<p>\u201cIn addition, it should be stated that the design is certified for a given range of operations. &nbsp;This is assumed as part of the process. And we all realize that should his range of operations be significantly exceeded, the data would have to be reevaluated and reexamined to determine if the design was adequate for the new regime.<\/p>\n<p><iframe id=\"twitter-widget-2\" scrolling=\"no\" frameborder=\"0\" allowtransparency=\"true\" allowfullscreen=\"true\" class=\"\" style=\"position: static; visibility: visible; width: 0px; height: 0px; display: block; flex-grow: 1;\" title=\"X Post\" src=\"https:\/\/platform.twitter.com\/embed\/Tweet.html?creatorScreenName=NASASpaceflight&amp;dnt=true&amp;embedId=twitter-widget-2&amp;features=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%3D%3D&amp;frame=false&amp;hideCard=false&amp;hideThread=false&amp;id=1022223403032477707&amp;lang=en&amp;origin=https%3A%2F%2Fwww.nasaspaceflight.com%2F2018%2F07%2Fasap-boeing-failure-positive-spacex-crew-announcement%2F&amp;sessionId=5318861a1e0a75b51cfda96e64b322e24ea1f9f2&amp;siteScreenName=NASASpaceflight&amp;theme=light&amp;widgetsVersion=6a3ad42b224df%3A1778106238597&amp;width=550px\" data-gtm-yt-inspected-14=\"true\" data-gtm-yt-inspected-21=\"true\" data-tweet-id=\"1022223403032477707\"><\/iframe><\/p>\n<blockquote class=\"twitter-tweet\" data-width=\"550\" data-dnt=\"true\" data-twitter-extracted-i1783498527302263537=\"true\">\n<p lang=\"en\" dir=\"ltr\">#BREAKING @NASA news! I will be at @NASA_Johnson on 8\/3 to announce the astronauts assigned to the first crews launching on American-made spacecraft from American soil since the retirement of the Space Shuttle Program.https:\/\/t.co\/SA6cj81ah5<\/p>\n<p>\u2014 Jim Bridenstine (@JimBridenstine) July 25, 2018<\/p>\n<\/blockquote>\n<p>\u201cNow this does not seem to be the case in our vision at the moment. &nbsp;I just bring that up so that everyone is aware that that is the case. &nbsp;And so in front of both the agency and the contractor is a considerable amount of detailed technical review process wherein the data, backing up the design itself, is reviewed and assessed against the certification criteria.<\/p>\n<p>\u201cOnce that process is complete, then the design is eligible for certification and would be signed off by the certification agency.\u201d<\/p>\n","protected":false},"excerpt":{"rendered":"<p>As NASA prepares to provide updated launch date targets for the uncrewed and crewed Commercial Crew demonstration missions from both SpaceX and Boeing \u2013 as well as flight crew assignments for each provider \u2013 the agency\u2019s Aerospace Safety Advisory Panel (ASAP) held its quarterly meeting last Thursday, during which they outlined a failure on Boeing\u2019s [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":"","_links_to":"","_links_to_target":""},"categories":[2],"tags":[8862,7893,1926,233,1306],"class_list":["post-38343","post","type-post","status-publish","format-standard","hentry","category-news","tag-asap","tag-ccp","tag-dragon-2","tag-iss","tag-starliner"],"acf":[],"_links":{"self":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/38343"}],"collection":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/comments?post=38343"}],"version-history":[{"count":0,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/38343\/revisions"}],"wp:attachment":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/media?parent=38343"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/categories?post=38343"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/tags?post=38343"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}