{"id":38670,"date":"2017-10-24T22:19:09","date_gmt":"2017-10-24T14:19:09","guid":{"rendered":"https:\/\/wp-productionenv-bjg9h2g2bgg5b8aa.southeastasia-01.azurewebsites.net\/news\/crew-access-arm-arrives-as-sls-mobile-launcher-takes-shape-2\/"},"modified":"2017-10-24T22:19:09","modified_gmt":"2017-10-24T14:19:09","slug":"crew-access-arm-arrives-as-sls-mobile-launcher-takes-shape-2","status":"publish","type":"post","link":"https:\/\/starpath.global\/news\/crew-access-arm-arrives-as-sls-mobile-launcher-takes-shape-2\/","title":{"rendered":"Crew Access Arm arrives as SLS Mobile Launcher takes shape"},"content":{"rendered":"<p>The huge Mobile Launcher (ML) for the Space Launch System (SLS) is gaining more of its array of appendages as it prepares to host the Exploration Mission -1 (EM-1) launch. Although this first SLS mission won\u2019t involve astronauts, the Crew Access Arm (CAA) is making its journey on the back of a large transporter to the ML for installation.<\/p>\n<p>ML Taking Shape:<\/p>\n<p>The ML \u2013 designed by RS&amp;H (base and structure), along with ASRC Aerospace Corporation (prop systems etc.) \u2013 consists of the main support structure that comprises the base, tower and facility ground support systems.<\/p>\n<p><img fetchpriority=\"high\" decoding=\"async\" class=\"alignleft\" title=\"Ares 1 on ML with Roller Coaster EES\" src=\"\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2013\/02\/A3171.jpg\" alt=\"Ares 1 on ML with Roller Coaster EES\" width=\"338\" height=\"225\">It was initially built for the Constellation Program (CxP) to host Ares I launches, with a launch specific to the \u201cstick\u201d design of the rocket.<\/p>\n<p>However,&nbsp;the cancellation of the Constellation Program (CxP) resulted in the ML receiving its pink slip.<\/p>\n<p>Parked up near the VAB, rumors of what would happen to the ML ranged from pulling the structure apart for scrap, through to a joke that was circulated throughout the KSC workforce claiming there was interest from Disney for turning it into a fun ride.<\/p>\n<p>Ironically, Disney engineers had already worked with the KSC team on the&nbsp;roller coaster Emergency Egress System (EES) \u2013 a giant structure that has since been ruled out as the EES for the SLS.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-medium wp-image-52749\" src=\"\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2017\/10\/NSF_20171024_190152-350x265.jpg\" alt=\"\" width=\"350\" height=\"265\" srcset=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2017\/10\/NSF_20171024_190152-350x265.jpg 350w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2017\/10\/NSF_20171024_190152-462x350.jpg 462w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2017\/10\/NSF_20171024_190152-768x581.jpg 768w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2017\/10\/NSF_20171024_190152.jpg 1008w\" sizes=\"(max-width: 350px) 100vw, 350px\">The ML was brought back into focus for SLS, with the requirement to modify the structure to host the new rocket.<\/p>\n<p>The launch mount was the first major element of the ML to be redesigned, changing from a mount&nbsp;catered for a single booster to one that could host for a vehicle with two boosters and four RS-25 engines.<\/p>\n<p>     (adsbygoogle = window.adsbygoogle || []).push({});<\/p>\n<p>Meanwhile, testing of the vast number of umbilicals that will be mated with SLS and Orion ahead of launches continues to take place at&nbsp;the&nbsp;Launch Equipment Test Facility (LETF) inside the Kennedy Space Center grounds.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-medium wp-image-52744\" src=\"\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2017\/10\/NSF_20171024_182232-350x203.jpg\" alt=\"\" width=\"350\" height=\"203\" srcset=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2017\/10\/NSF_20171024_182232-350x203.jpg 350w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2017\/10\/NSF_20171024_182232-604x350.jpg 604w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2017\/10\/NSF_20171024_182232-768x445.jpg 768w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2017\/10\/NSF_20171024_182232-1170x678.jpg 1170w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2017\/10\/NSF_20171024_182232.jpg 1459w\" sizes=\"(max-width: 350px) 100vw, 350px\">Currently being tested in the Vertical Stabilizer (VS), that will \u2013 as the name suggests \u2013 keep the huge rocket stable on the pad.<\/p>\n<p>Engineers recently conducted a full disconnect and retraction test with the motion simulator at the LETF.<\/p>\n<p>The Motion Simulator test equipment used on the VS has also been used to impart loads into the hardware. This mimics the projected loads that will be imparted onto the VS by the SLS, as she rocks in the wind while on the pad.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-medium wp-image-52745\" src=\"\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2017\/10\/NSF_20171024_184319-350x223.jpg\" alt=\"\" width=\"350\" height=\"223\" srcset=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2017\/10\/NSF_20171024_184319-350x223.jpg 350w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2017\/10\/NSF_20171024_184319.jpg 523w\" sizes=\"(max-width: 350px) 100vw, 350px\">At the ML site, engineers also lifted and installed a third umbilical on the ML for a fit check.<\/p>\n<p>The Core Stage Inter-tank Umbilical (CSITU) was lifted up to its position on the ML by a huge crane that is residing with the ML before being lowered down ahead of final preparations for its full installation.<\/p>\n<p>The CSITU has now been sent to the Vehicle Assembly Building (VAB) for instrumentation installation before the final mate with the ML in mid-December.<\/p>\n<p>This umbilical is the third in a series of five new umbilicals that will be installed along the tower of the ML. Its main function is to vent excess gaseous hydrogen from the rocket\u2019s core stage. This umbilical also will provide conditioned air, pressurized gases, and power and data connection to the core stage.<\/p>\n<h4 class=\"widget-title penci-border-arrow\">See Also<\/h4>\n<ul>\n<li>SLS Forum Section<\/li>\n<li>L2 SLS Section<\/li>\n<li>Click here to Join L2<\/li>\n<\/ul>\n<p>Already fully installed on the ML is the&nbsp;Orion Service Module Umbilical (OSMU)&nbsp;\u2013 which was the first umbilical to be tested at the LETF and the Core Stage Forward Skirt Umbilical, or CSFSU.<\/p>\n<p>The full role of the OSMU will be to provide electrical, data, and purging processes to Orion\u2019s Service Module.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-26713\" title=\"Z8\" src=\"\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2012\/11\/Z8.jpg\" alt=\"\" width=\"351\" height=\"285\">Weighing approximately 40,000 lbs, the OSMU is 27 feet long, 17 feet wide, and 42 feet tall \u2013 including the OSMU safe house to protect it from the intense, SRB-induced launch environment.<\/p>\n<p>\u201cThe OSMU is a T-0 umbilical mechanism providing GSP, Environmental Control System (ECS), GCS, BAIR, LCS, and GN2 to the Orion Service Module (SM),\u201d noted an extensive overview presentation in L2.<\/p>\n<p>The release of the OSMU will be triggered at T-0 (SRB ignition) by a signal to the release mechanism on the ground umbilical plate. At this point, the OSMU truss boom structure will tilt-up into its safe house on the ML umbilical tower. This truss boom structure (arm) will reach out toward but remain 16 feet shy of the Orion Service Module itself.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft\" src=\"\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2015\/07\/2015-07-07-163230-350x253.jpg\" alt=\"2015-07-07-163230\" width=\"350\" height=\"253\">The CSFSU&nbsp;is a T-0 umbilical requiring VAB access for mating of the umbilical plate to the SLS rocket.<\/p>\n<p>Commodity lines for the CS FS will run through the stabilizer truss of the umbilical arm, with drape commodity lines extending from the arm to CS FS attach location.<\/p>\n<p>All these umbilicals will swing away from the rocket and spacecraft just before launch, a process that will be tested in sequence in the months ahead of the first SLS launch, which is currently waiting on a new official launch date.<\/p>\n<p>NASA managers are deciding between the \u201cbest case\u201d date of December 2019 and a \u201crisk-informed\u201d date of Q2 (around May) 2020 for EM-1.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-medium wp-image-52746\" src=\"\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2017\/10\/NSF_20171024_184426-350x249.jpg\" alt=\"\" width=\"350\" height=\"249\" srcset=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2017\/10\/NSF_20171024_184426-350x249.jpg 350w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2017\/10\/NSF_20171024_184426-492x350.jpg 492w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2017\/10\/NSF_20171024_184426.jpg 697w\" sizes=\"(max-width: 350px) 100vw, 350px\">One of the iconic appendages for the ML will be the Crew Access Arm (CAA), which is one of the largest additions to the ML.<\/p>\n<p>The CAA is so large the&nbsp;delivery process is happening in two phases. First, the CAA was laid on its side in order to travel from the PFC shop in Canaveral Groves where it was fabricated.<\/p>\n<p>After making part of the journey to a large parking lot, the team rotated it back upright for the remaining assembly work, including the installation of two 20,000lb hinges.<\/p>\n<p>The CAA will make its final trip to the ML itself by the end of this month.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-medium wp-image-52750\" src=\"\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2017\/10\/NSF_20171024_195047-350x313.jpg\" alt=\"\" width=\"350\" height=\"313\" srcset=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2017\/10\/NSF_20171024_195047-350x313.jpg 350w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2017\/10\/NSF_20171024_195047-392x350.jpg 392w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2017\/10\/NSF_20171024_195047.jpg 656w\" sizes=\"(max-width: 350px) 100vw, 350px\">A subject of government discussion is the fact this ML \u2013 as designed \u2013 will only be used for one mission.<\/p>\n<p>Following the maiden flight of the SLS \u2013 in her Block 1 configuration \u2013 engineers will then go to work on a 33-month long process to reconfigure and modify the ML for the second flight of SLS in her Block 1B role.<\/p>\n<p>This rocket is taller and uses a different, more powerful, Upper Stage \u2013 called the Exploration Upper Stage (EUS) \u2013 requiring a large-scale rework on the ML. Questions are being asked as to whether it would help the schedule and\/or costs if NASA opted to build another ML \u2013 for Block 1B \u2013 from scratch.<\/p>\n<p>NASA has previously resisted such attempts claiming it would cost several hundred million dollars to build a second ML and have as such stayed the course on the EM-1 to EM-2 modification plan for the current ML.<\/p>\n<p>Images: NASA and L2 which includes, presentations, videos, graphics and internal \u2013 interactive with actual SLS engineers.)<\/p>\n<p>(L2 is \u2013 as it has been for the past several years \u2013 providing full exclusive SLS and Exploration Planning coverage. To join L2, click here:&nbsp;\/\/www.nasaspaceflight.com\/l2\/)<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The huge Mobile Launcher (ML) for the Space Launch System (SLS) is gaining more of its array of appendages as it prepares to host the Exploration Mission -1 (EM-1) launch. Although this first SLS mission won\u2019t involve astronauts, the Crew Access Arm (CAA) is making its journey on the back of a large transporter to [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":30261,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":"","_links_to":"","_links_to_target":""},"categories":[2],"tags":[3718,7766,8892,624],"class_list":["post-38670","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","tag-em-1","tag-ksc","tag-ml","tag-sls"],"acf":[],"_links":{"self":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/38670"}],"collection":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/comments?post=38670"}],"version-history":[{"count":0,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/38670\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/media\/30261"}],"wp:attachment":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/media?parent=38670"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/categories?post=38670"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/tags?post=38670"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}