{"id":38743,"date":"2017-08-11T23:29:28","date_gmt":"2017-08-11T15:29:28","guid":{"rendered":"https:\/\/wp-productionenv-bjg9h2g2bgg5b8aa.southeastasia-01.azurewebsites.net\/news\/spacex-and-boeing-in-home-stretch-for-commercial-crew-readiness\/"},"modified":"2017-08-11T23:29:28","modified_gmt":"2017-08-11T15:29:28","slug":"spacex-and-boeing-in-home-stretch-for-commercial-crew-readiness","status":"publish","type":"post","link":"https:\/\/starpath.global\/news\/spacex-and-boeing-in-home-stretch-for-commercial-crew-readiness\/","title":{"rendered":"SpaceX and Boeing in home stretch for Commercial Crew readiness"},"content":{"rendered":"<p>With just one year to go until the scheduled completion of all uncrewed and crewed test flights for SpaceX and Boeing\u2019s commercial crew transportation services, the NASA Advisory Council recently held a routine review of the technical, hardware, software, and training progress the two companies are making toward the goal of returning the capability to launch people into space from the United States.<\/p>\n<\/p>\n<p><b>General Commercial Crew update:<\/b><\/p>\n<p>At the end of July, the NASA Advisory Council (NAC) held a standard, two-day series of meetings with various NASA Directorates, gaining input and insight into the agency\u2019s continued work across a variety of fields.<\/p>\n<p><img fetchpriority=\"high\" decoding=\"async\" class=\"size-medium wp-image-49908 alignleft\" src=\"\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2017\/04\/Screen-Shot-2017-04-07-at-17.17.37-350x283.png\" alt=\"\" width=\"350\" height=\"283\" srcset=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2017\/04\/Screen-Shot-2017-04-07-at-17.17.37-350x283.png 350w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2017\/04\/Screen-Shot-2017-04-07-at-17.17.37-433x350.png 433w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2017\/04\/Screen-Shot-2017-04-07-at-17.17.37-768x621.png 768w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2017\/04\/Screen-Shot-2017-04-07-at-17.17.37-1170x946.png 1170w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2017\/04\/Screen-Shot-2017-04-07-at-17.17.37.png 1298w\" sizes=\"(max-width: 350px) 100vw, 350px\">In specific regard to Commercial Crew, NASA\u2019s Deputy Manager for Commercial Crew, Steve Stitch, updated NAC members on the general progress of SpaceX and Boeing toward next year\u2019s inaugural crew flights of their respective vehicles.<\/p>\n<p>In terms of significant pre-flight milestones still on the books for both SpaceX and Boeing are the in-flight abort test for SpaceX and the pad abort test for Boeing.<\/p>\n<p>Mr. Stitch noted that Boeing\u2019s pad abort test is slated for February 2018 with SpaceX\u2019s in-flight abort test scheduled for April 2018.<\/p>\n<p>This would place the notional schedule of events for Commercial Crew next year as follows:<br \/>\nFebruary \u2013 Boeing: pad abort test<br \/>\nFebruary \u2013 SpaceX: Demo 1 (uncrewed) test flight of Dragon 2<br \/>\nApril \u2013 SpaceX: in-flight abort test<br \/>\nJune \u2013 Boeing: Orbital Flight Test (OFT \u2013 uncrewed) of Starliner<br \/>\nJune \u2013 SpaceX: Demo 2 (crewed) test flight of Dragon 2<br \/>\nAugust \u2013 Boeing: Crewed Flight Test (CFT) of Starliner<\/p>\n<p>     (adsbygoogle = window.adsbygoogle || []).push({});<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft\" src=\"\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2015\/06\/2015-06-10-014231-350x241.jpg\" alt=\"2015-06-10-014231\" width=\"350\" height=\"241\">Additionally, with all 12 (six for each provider) of the Post Certification Missions (PCMs) for the six month crew rotations now awarded, Mr. Stitch noted that Boeing\u2019s first two PCMs are in work and that all of the milestones are completed for PCM 1 and half for PCM 2. <\/p>\n<p>Mr. Stitch did not provide an update on where PCM planning stood with SpaceX.<\/p>\n<p>Nonetheless, there is still a lot of work to do before the commencement of commercial crew transportation to the International Space Station. <\/p>\n<p>As Mr. Stitch noted to the NAC, \u201cIn terms of overall progress, we\u2019ve made a lot of headway in delivering water recovery trainers for both partners, and both providers continue to work through a lot of critical testing of hardware.<\/p>\n<h4 class=\"widget-title penci-border-arrow\">See Also<\/h4>\n<ul>\n<li>CCP Vehicles Section<\/li>\n<li>L2 SpaceX Section<\/li>\n<li>L2 CCP Section<\/li>\n<li>Click here to Join L2<\/li>\n<\/ul>\n<p>\u201cWe are really in the middle of qualification of both spacecraft and also for the Falcon 9 Block 5 launch vehicle. &nbsp;And so we\u2019re really in that hard part of development where you start to see lots of problems, but the contractors are showing a lot of promise working through those.\u201d<\/p>\n<p>Mr. Stitch also noted that teams are busy working to clear items from the hazards list for the overall commercial crew program \u2013 including but not limited to the issue of closing the LOC (Loss Of Crew) gap with both providers.<\/p>\n<p>\u201cInability to meet the LOC gap continues to be a concern, and we continue to work with the partners on how to reduce that. &nbsp;Had a discussion with the ASAP recently with the LOC strategy and the numbers there,\u201d stated Mr. Stitch.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft\" src=\"\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2015\/06\/2015-06-10-014319-350x251.jpg\" alt=\"2015-06-10-014319\" width=\"350\" height=\"251\">Notably, given the NAC\u2019s involvement and review beyond these regularly scheduled public meetings, there was no follow-on discussion or questions regarding the LOC gap posed by members of the NAC \u2013 indicating that work to close and\/or disposition the LOC gap is proceeding to the NAC\u2019s recommendations and NASA\u2019s safety standards.<\/p>\n<p>Additionally, Mr. Stitch went into great detail regarding Search &amp; Rescue (S&amp;R) in the event of a pad or in-flight abort.<\/p>\n<p>\u201cSearch-and-rescue posture has been one of our top risks, and we\u2019ve worked on that very hard for the last six months. &nbsp;We now have the recovery trainers in place, and we\u2019re starting to work with the various rescue jumpers on how they\u2019re going to do that training.\u201d<\/p>\n<p>A key element here is the budget allocated to S&amp;R, as NASA is responsible for the coordination and cost of such efforts with the 88th Rescue Squadron while SpaceX and Boeing participate to some degree.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"size-medium wp-image-49910 alignleft\" src=\"\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2017\/04\/Screen-Shot-2017-04-07-at-17.20.14-350x260.png\" alt=\"\" width=\"350\" height=\"260\" srcset=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2017\/04\/Screen-Shot-2017-04-07-at-17.20.14-350x260.png 350w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2017\/04\/Screen-Shot-2017-04-07-at-17.20.14-471x350.png 471w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2017\/04\/Screen-Shot-2017-04-07-at-17.20.14-768x571.png 768w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2017\/04\/Screen-Shot-2017-04-07-at-17.20.14.png 976w\" sizes=\"(max-width: 350px) 100vw, 350px\">\u201cWe have delivered the rescue trainers, and we\u2019ve completed a rescue trainer test with SpaceX in the Banana River. &nbsp;We had the 88th Rescue Squadron, and they were doing basic procedures of how they would approach a capsule and how they would have people get inside and how to get flotation power established,\u201d noted Mr. Stitch.<\/p>\n<p>\u201cThis was a training to develop the procedures for how to go do all of that.\u201d<\/p>\n<p>Moreover, Mr. Stitch noted that while a large portion of the risk for this had been the delivery of the trainers for both Dragon and Starliner capsules (a risk eliminated by the delivery of those trainers), there is an ongoing disagreement about the number of calendar months required to properly train rescue forces for each vehicle.<\/p>\n<p>\u201cWe\u2019re still converging on [the training timeline],\u201d stated Mr. Stitch. &nbsp;\u201cI think now that we have the trainers in place, we\u2019ve actually taken a risk asset out and done some training. &nbsp;And we can bring the schedule together to do some more training as early as August. &nbsp;<\/p>\n<p>\u201cWe are still tracking this in our risk system, but we\u2019re making progress.\u201d<\/p>\n<p><b>Boeing \u2013 CST-100 Starliner:<\/b><\/p>\n<p>Under the list of recent accomplishments for Boeing, a slew of hardware deliveries to NASA and various test centers around the country all mark promising milestones for the overall OFT and CFT launch schedules. <\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"size-medium wp-image-49915 alignleft\" src=\"\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2017\/04\/Screen-Shot-2017-04-07-at-17.23.29-350x271.png\" alt=\"\" width=\"350\" height=\"271\" srcset=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2017\/04\/Screen-Shot-2017-04-07-at-17.23.29-350x271.png 350w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2017\/04\/Screen-Shot-2017-04-07-at-17.23.29-452x350.png 452w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2017\/04\/Screen-Shot-2017-04-07-at-17.23.29-768x595.png 768w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2017\/04\/Screen-Shot-2017-04-07-at-17.23.29.png 836w\" sizes=\"(max-width: 350px) 100vw, 350px\">A new article for parachute testing has been delivered to NASA that will be part of a parachute drop test in September to study off nominal chute deployment and landing operations as well as serve as the first time heat shield deployment will be tested in a flight environment.<\/p>\n<p>Moreover, Boeing has delivered a mock-up trainer of Starliner to building 9 at the Johnson Space Center (JSC), and testing of Starliner\u2019s Structural Test Article (STA) has made significant progress in Huntington Beach, California. <\/p>\n<p>For the STA, Mr. Stitch noted that forward heat shield shock test has been completed. &nbsp;The forward heat shield must jettison from Starliner so the drogue and main parachutes can deploy. <\/p>\n<p>Both the jettisoning of the forward heat shield and deployment of the chutes create a shock as mortars fire to carry out both sequences; thus, the STA has been invaluable in concretely defining the shock environment\u2019s effect on the overall Starliner structure.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"size-medium wp-image-49917 alignleft\" src=\"\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2017\/04\/Screen-Shot-2017-04-07-at-17.24.39-350x236.png\" alt=\"\" width=\"350\" height=\"236\" srcset=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2017\/04\/Screen-Shot-2017-04-07-at-17.24.39-350x236.png 350w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2017\/04\/Screen-Shot-2017-04-07-at-17.24.39-519x350.png 519w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2017\/04\/Screen-Shot-2017-04-07-at-17.24.39-768x518.png 768w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2017\/04\/Screen-Shot-2017-04-07-at-17.24.39.png 904w\" sizes=\"(max-width: 350px) 100vw, 350px\">Moreover, testing of the Starliner Service Module (SM) and Crew Module (CM) separation system to better understand how the complicated mechanism that has to sever lines and split the two spacecraft apart operates in various temperature extremes is also underway at Huntington. <\/p>\n<p>On the other coast, Starliner spacecraft production is proceeding. &nbsp;Spacecraft 1, which will be used for the pad abort test next year, is ready for upper and lower dome mate and leak checks.<\/p>\n<p>The Service Module Hot Fire Test article (SMHFT) has been powered up in the Commercial Crew and Cargo Processing Facility (C3PF) at the Kennedy Space Center. &nbsp;The SMHFT will soon be shipped to White Sands for thruster testing and validation of the SM\u2019s propulsion systems.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-medium wp-image-45134\" src=\"\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2016\/05\/2016-05-12-182150-350x234.jpg\" alt=\"2016-05-12-182150\" width=\"350\" height=\"234\" srcset=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2016\/05\/2016-05-12-182150-350x234.jpg 350w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2016\/05\/2016-05-12-182150-524x350.jpg 524w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2016\/05\/2016-05-12-182150-585x390.jpg 585w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2016\/05\/2016-05-12-182150-263x175.jpg 263w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2016\/05\/2016-05-12-182150.jpg 656w\" sizes=\"(max-width: 350px) 100vw, 350px\">\u201cIn terms of production and qualification, a lot of work is transpiring at the C3PF,\u201d noted Mr. Stitch. &nbsp;\u201cThey have three full spacecraft in flow, but they\u2019be spent a lot of time with the SMHFT article and assembling that test article. <\/p>\n<p>\u201cA lot of emphasis has been put on that because it needs to go to White Sands. &nbsp;There are also two other service modules that need to get built up. &nbsp;And many of the components for both of those are actually at KSC now.\u201d<\/p>\n<p>Some testing of the SMHFT article has already occurred at Kennedy, notably leak checks of the SMHFT article\u2019s propulsion system. &nbsp;Those tests have taken place behind the C3PF, where Boeing has built their hazardous processing facility. <\/p>\n<p>\u201cThat area is where a lot of testing has been occurring for the SMHFT article,\u201d noted Mr. Stitch. &nbsp;\u201cThey are in the process of doing a lot of checks and have been working through those in the last month and also testing all of the avionics and flight harnesses for the test article.\u201d<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"size-medium wp-image-51172 alignleft\" src=\"\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2017\/07\/Screen-Shot-2017-07-13-at-10.29.21-350x332.png\" alt=\"\" width=\"350\" height=\"332\" srcset=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2017\/07\/Screen-Shot-2017-07-13-at-10.29.21-350x332.png 350w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2017\/07\/Screen-Shot-2017-07-13-at-10.29.21-369x350.png 369w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2017\/07\/Screen-Shot-2017-07-13-at-10.29.21.png 728w\" sizes=\"(max-width: 350px) 100vw, 350px\">In addition to serving as a test area for the SMHFT article, the hazardous processing facility is where Boeing plans to load and offload reactants into and out of the Service Module and the Crew Module for flight operations.<\/p>\n<p>But that\u2019s not the only major event that has recently taken place at the C3PF.<\/p>\n<p>Spacecraft 1 recently underwent a software test where the craft was powered up and data flowed from the craft at KSC to JSC in Houston, Texas.<\/p>\n<p>\u201cWe\u2019ve been working a lot trying to connect the avionics lab out at Sonny Carter with the Boeing facility at the C3PF,\u201d noted Mr. Stitch. &nbsp;\u201cWe have done several tests of the fiber optic connections, the idea [being] that you don\u2019t have to move the hardware back and forth [every time you want to] see how the spacecraft talks to the ISS flight computers.\u201d<br \/>\nAdditionally, Boeing and NASA have completed the first single string software docked \u201ctalk\u201d test between Starliner and ISS.<\/p>\n<p>The test was positive, and a second test later this summer will use all three strings of the software system to ensure full communication between the two crafts once they\u2019re docked.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"size-medium wp-image-51170 alignleft\" src=\"\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2017\/07\/Screen-Shot-2017-07-13-at-10.26.11-350x211.png\" alt=\"\" width=\"350\" height=\"211\" srcset=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2017\/07\/Screen-Shot-2017-07-13-at-10.26.11-350x211.png 350w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2017\/07\/Screen-Shot-2017-07-13-at-10.26.11-580x350.png 580w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2017\/07\/Screen-Shot-2017-07-13-at-10.26.11-180x110.png 180w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2017\/07\/Screen-Shot-2017-07-13-at-10.26.11-768x463.png 768w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2017\/07\/Screen-Shot-2017-07-13-at-10.26.11-1170x706.png 1170w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2017\/07\/Screen-Shot-2017-07-13-at-10.26.11.png 1668w\" sizes=\"(max-width: 350px) 100vw, 350px\">Additionally, Boeing has also delivered the Starliner mission simulator to Building 5 at JSC and has completed several simulations for various phases of flight as they move toward wringing out the final bugs from Starliner\u2019s software.<\/p>\n<p>The simulator \u201cuses a real fight software, so it\u2019s a good way to start to understand the procedure development, how the crew displays will work, and really wring out the flight software and understand that,\u201d stated Mr. Stitch. &nbsp;\u201cAbout every week there is some kind of run that our joint testing has been supporting along with the crew over in Building 5.\u201d<\/p>\n<p>In terms of Starliner\u2019s ride, ULA (United Launch Alliance) and Boeing have conducted an Emergency Detection System (EDS) integrated abort test. <\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-medium wp-image-51180\" src=\"\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2017\/07\/2017-07-13-190804-350x222.jpg\" alt=\"\" width=\"350\" height=\"222\" srcset=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2017\/07\/2017-07-13-190804-350x222.jpg 350w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2017\/07\/2017-07-13-190804-552x350.jpg 552w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2017\/07\/2017-07-13-190804-768x487.jpg 768w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2017\/07\/2017-07-13-190804-1170x742.jpg 1170w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2017\/07\/2017-07-13-190804.jpg 1432w\" sizes=\"(max-width: 350px) 100vw, 350px\">\u201c[The EDS] is probably one of the newest things on the Atlas vehicle for Boeing,\u201d noted Mr. Stitch. &nbsp;\u201cThis is the system that looks at rates and pressures on the vehicle to determine when an abort should occur during ascent if needed.\u201d<\/p>\n<p>Moreover, build of the Atlas V core booster, AV-80, and the dual engine Centaur upper stage for the OFT mission in June next year have begun at ULA\u2019s Decatur, Alabama, facility near Huntsville.<\/p>\n<p>Also in terms of the Atlas V, the new aeroskirt design has completed its CDR (Critical Design Review) and has one more wind tunnel test slated for later this year.<\/p>\n<p>The CDR was \u201ca very big milestone,\u201d noted Mr. Stitch. &nbsp;\u201cOnce we had the aerodynamic issues solved, we had to get into the design and how we would lay out the skirt and how there are a few panels that will blow out to allow the launch abort engines to fire.\u201d<\/p>\n<p><b>SpaceX\u2019s crewed Dragons readying for life:<\/b><\/p>\n<p>While a vast majority of the work SpaceX plans to perform on LC-39A in the coming months is dedicated to preparing the pad for the inaugural launch of the company\u2019s Falcon Heavy rocket (currently targeted for NET (No Earlier Than) November), there are other elements of the pad that still need work for Commercial Crew.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft wp-image-51617\" src=\"\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2017\/08\/Screen-Shot-2017-08-11-at-13.25.26-295x350.png\" alt=\"\" width=\"350\" height=\"415\" srcset=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2017\/08\/Screen-Shot-2017-08-11-at-13.25.26-295x350.png 295w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2017\/08\/Screen-Shot-2017-08-11-at-13.25.26-768x911.png 768w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2017\/08\/Screen-Shot-2017-08-11-at-13.25.26.png 894w\" sizes=\"(max-width: 350px) 100vw, 350px\">Most notably, this involves the installation of the new Crew Access Arm at the top of Pad-A\u2019s Fixed Service Structure (FSS).<\/p>\n<p>The crew arm \u2013 that has already been built and is in a facility near the HIF (Horizontal Integration Facility) at LC-39A\u2019s perimeter \u2013 will be installed later this year under the current schedule, possibly at the same time the pad is taken offline to prepare for Falcon Heavy.<\/p>\n<p>\u201cSpaceX has delivered [the Crew Access Arm] hardware and checked it out and will install it after they get SLC-40 back up,\u201d noted Mr. Stitch. &nbsp;\u201cSo right now they\u2019re launching off of 39A, and once they get 40 back up and operational, they\u2019ll find a window to go install this out at pad 39A.\u201d<\/p>\n<p>Installation of the arm was preceded this summer by work to raise the height of the pad\u2019s lightning mast and add additional catenary wires that will channel the energy of a direct lightning strike to the mast safely away from a rocket and the pad\u2019s critical systems.<\/p>\n<p>During the lead up to the Bulgariasat mission in June, NASASpaceflight.com\u2019s Brady Kennison captured photos of the work on the lightning mast \u2013 all of which are available to view on L2. <\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft wp-image-51616\" src=\"\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2017\/08\/Screen-Shot-2017-08-11-at-13.22.45-322x350.png\" alt=\"\" width=\"350\" height=\"381\" srcset=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2017\/08\/Screen-Shot-2017-08-11-at-13.22.45-322x350.png 322w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2017\/08\/Screen-Shot-2017-08-11-at-13.22.45-768x835.png 768w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2017\/08\/Screen-Shot-2017-08-11-at-13.22.45-1170x1272.png 1170w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2017\/08\/Screen-Shot-2017-08-11-at-13.22.45.png 1326w\" sizes=\"(max-width: 350px) 100vw, 350px\">Mr. Stitch notes that this work is now complete and that the mast and pad\u2019s lightning protection system upgrades are complete and ready for Crew Access Arm installation.<\/p>\n<p>Moreso, SpaceX\u2019s impressive cadence off 39A \u2013 eight flights over 20 weeks before the range stand down in July, average of one flight every 2.5 weeks \u2013 has provided \u201cgood run time on the pad and understanding of how the pad works in terms of communicating with the spacecraft and the launch vehicle, how the hold down system works, how the Transporter\/Erector works, and sort of wringing out the pad in prep for our flights,\u201d noted Mr. Stitch.<\/p>\n<p>In terms of mission training, Mr. Stitch told the NAC members that multiple \u201chuman in the loop\u201d simulations have occurred with crew in the Dragon simulator in Hawthorne. &nbsp;A full up mission simulation, where the Dragon simulator was remotely hooked up to Houston with data flow between the two, has also been completed \u2013 a critical step toward the upcoming integrated mission sims.<\/p>\n<p>For the still outstanding major milestones, a critical test toward crewed Dragon flights is final testing of the SuperDraco engines at McGregor. <\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-medium wp-image-40135\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2015\/05\/2015-05-06-142758-350x229.jpg\" alt=\"2015-05-06-142758\" width=\"350\" height=\"229\" srcset=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2015\/05\/2015-05-06-142758-350x229.jpg 350w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2015\/05\/2015-05-06-142758.jpg 384w\" sizes=\"(max-width: 350px) 100vw, 350px\">The SuperDracos will be responsible for pulling Dragon away from a Falcon 9 in the event a pad or in-flight abort becomes necessary.<\/p>\n<p>SpaceX completed their pad abort test of the SuperDracos in May 2015. &nbsp;For the upcoming tests, SpaceX is building a propulsion module validation article complete with SuperDraco engines and the Reaction Control Draco jets.<\/p>\n<p>These tests are slated for completion in March 2018 \u2013 just one month before the company\u2019s in-flight abort test, a test that is optional and not a mandated part of the Commercial Crew contract from NASA.<\/p>\n<p>The in-flight abort will involve a Dragon 2 capsule launching on top of a fully fueled Falcon 9 rocket with the in-flight abort triggered when the vehicle reaches MaxQ \u2013 the moment of maximum mechanical stress on the rocket and capsule.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft\" src=\"\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2016\/06\/2016-06-23-002835-350x221.jpg\" alt=\"2016-06-23-002835\" width=\"350\" height=\"221\">Originally, the in-flight abort test was to occur from Vandenberg using a three-engine variant of the Falcon rocket and the same Dragon 2 mock-up used for the 2015 pad abort test; however, as the Falcon 9 and Dragon 2 have now evolved significantly since those plans were created, that particular test scenario has been scrapped.<\/p>\n<p>The in-flight abort test is now targeted to launch from LC-39A at the Kennedy Space Center using a Falcon 9 rocket and the same functional Dragon 2 capsule that will fly the uncrewed Demo-1 mission two months prior in February 2018.<\/p>\n<p>As the Demo-1 vehicle\u2019s launch date approaches, that vehicle is continuing through its build process, as is the Demo 2 vehicle and four other Dragon 2 capsules for the first four Post Certification Missions \u2013 all according to Mr. Stitch.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-medium wp-image-51624\" src=\"\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2017\/08\/2017-08-11-192704-350x226.jpg\" alt=\"\" width=\"350\" height=\"226\" srcset=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2017\/08\/2017-08-11-192704-350x226.jpg 350w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2017\/08\/2017-08-11-192704.jpg 379w\" sizes=\"(max-width: 350px) 100vw, 350px\">Those six Dragon builds are in addition to the Dragon 2 qualification unit that has already been taken through structural testing \u2013 testing that revealed an excellent match between the computer models and the actual Dragon 2 performance.<\/p>\n<p>For Demo-1, that Dragon has progressed through section integration and installation of its propulsion system, including the main propulsion tanks and prop lines.<\/p>\n<p>Moreover, the Demo-1 Dragon\u2019s pressure vessel has completed leak and pressure checks on all \u201cpenetration\u201d points.<\/p>\n<p>For the Demo-2 Dragon, the first to carry crew, Mr. Stitch noted that the module has completed painting and is ready for section integration.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"size-medium wp-image-49921 alignleft\" src=\"\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2017\/04\/Screen-Shot-2017-04-07-at-17.27.20-350x309.png\" alt=\"\" width=\"350\" height=\"309\" srcset=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2017\/04\/Screen-Shot-2017-04-07-at-17.27.20-350x309.png 350w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2017\/04\/Screen-Shot-2017-04-07-at-17.27.20-396x350.png 396w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2017\/04\/Screen-Shot-2017-04-07-at-17.27.20-768x679.png 768w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2017\/04\/Screen-Shot-2017-04-07-at-17.27.20.png 898w\" sizes=\"(max-width: 350px) 100vw, 350px\">The first PCM mission, referred to by SpaceX as Crew 1, that Dragon\u2019s forward and aft bulkheads have been manufactured and are ready for welding.<\/p>\n<p>Meanwhile, Dragon 2 parachute testing is on-going, with the next test scheduled for the mid- to late-August timeframe.<\/p>\n<p>Importantly, SpaceX has also been busy conducting detailed tests with the Demo-2 crew on the company\u2019s launch and entry suits.<\/p>\n<p>According to Mr. Stitch, \u201cSpaceX in particular has done a lot of fit checks with the crew. &nbsp;Their suit is a little bit more customized for each crew member, and so they have done pressurized tests with the crew and lots of fit checks and mobility checks as well to understand exactly how the suit works.\u201d<\/p>\n<p>Moreover, Dragon 2 and its associated systems aren\u2019t the only elements in flow for the February Demo-1 mission.<\/p>\n<p>SpaceX is also working toward final implementation of the upgraded Merlin 1D and MVac engines and all of the other \u201c100 or so\u201d associated Falcon 9 upgrades needed to meet NASA\u2019s human-rating requirements\/requests for the Falcon 9.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"size-medium wp-image-49919 alignleft\" src=\"\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2017\/04\/Screen-Shot-2017-04-07-at-17.26.40-350x241.png\" alt=\"\" width=\"350\" height=\"241\" srcset=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2017\/04\/Screen-Shot-2017-04-07-at-17.26.40-350x241.png 350w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2017\/04\/Screen-Shot-2017-04-07-at-17.26.40-508x350.png 508w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2017\/04\/Screen-Shot-2017-04-07-at-17.26.40-768x529.png 768w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2017\/04\/Screen-Shot-2017-04-07-at-17.26.40.png 958w\" sizes=\"(max-width: 350px) 100vw, 350px\">\u201cFor Falcon 9 and the Block 5 configuration, both the first stage Merlin 1D engines and the MVac engine on the second stage are into testing and have completed a number of runs with development engines out at McGregor to get ready for the Block 5 configuration that we\u2019ll fly crew on,\u201d notes Mr. Stitch.<\/p>\n<p>The Falcon 9 Block 5 (a name that isn\u2019t official, with Elon Musk preferring to call it Falcon 9 2.5 if anything), is currently planned to debut in its fully integrated form on the Demo-1 launch.<\/p>\n<p>As a stepping stone to the Block 5, the Falcon 9 Block 4 \u2013 which carries some but not all of the Block 5 upgrades including some incremental upgrades, like increased engine thrust \u2013 will debut next week on the CRS-12 launch, which is currently planned for Monday, 14 August at an instantaneous launch time of 12:32 EDT.<\/p>\n<p>(Images: SpaceX, Boeing, L2 imagery, Brady Kennison for NASASpaceFlight.com, and L2 artist Nathan Koga \u2013 The full gallery of Nathan\u2019s (Falcon Heavy to Dragon to Starliner, MCT, SLS, Commercial Crew and more) L2 images can be *found here*)<\/p>\n","protected":false},"excerpt":{"rendered":"<p>With just one year to go until the scheduled completion of all uncrewed and crewed test flights for SpaceX and Boeing\u2019s commercial crew transportation services, the NASA Advisory Council recently held a routine review of the technical, hardware, software, and training progress the two companies are making toward the goal of returning the capability to [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":"","_links_to":"","_links_to_target":""},"categories":[2],"tags":[670,7893,1565,1926,8726,316,1306],"class_list":["post-38743","post","type-post","status-publish","format-standard","hentry","category-news","tag-boeing","tag-ccp","tag-cst-100","tag-dragon-2","tag-dragon-v2","tag-spacex","tag-starliner"],"acf":[],"_links":{"self":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/38743"}],"collection":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/comments?post=38743"}],"version-history":[{"count":0,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/38743\/revisions"}],"wp:attachment":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/media?parent=38743"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/categories?post=38743"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/tags?post=38743"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}