{"id":38861,"date":"2017-02-15T22:05:43","date_gmt":"2017-02-15T14:05:43","guid":{"rendered":"https:\/\/wp-productionenv-bjg9h2g2bgg5b8aa.southeastasia-01.azurewebsites.net\/news\/investigating-the-potential-of-including-a-crew-on-the-maiden-flight-of-sls\/"},"modified":"2017-02-15T22:05:43","modified_gmt":"2017-02-15T14:05:43","slug":"investigating-the-potential-of-including-a-crew-on-the-maiden-flight-of-sls","status":"publish","type":"post","link":"https:\/\/starpath.global\/news\/investigating-the-potential-of-including-a-crew-on-the-maiden-flight-of-sls\/","title":{"rendered":"Investigating the potential of including a crew on the maiden flight of SLS"},"content":{"rendered":"<p>With NASA\u2019s management officially informing the workforce that evaluations are taking place into installing a crew on to the first flight of the Space Launch System (SLS), the challenge of ensuring crew safety will gain additional focus. Without an uncrewed test flight, a modification to the Exploration Mission -1 (EM-1) profile is likely, ranging from documented options such as a hybrid profile through to an ISS crew run.<\/p>\n<p>EM-1:<\/p>\n<p>The previous \u2013 and currently installed \u2013 plan is to launch a Block 1 SLS rocket on a 2018 mission that will send an Orion spacecraft around the Moon, prior to a splashdown in the Pacific ocean.<\/p>\n<p>A gap of around three years would follow before a near-repeat of the mission, this time including a crew.<\/p>\n<p><img fetchpriority=\"high\" decoding=\"async\" class=\"alignleft size-medium wp-image-49217\" src=\"\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2017\/02\/2017-02-15-221339-350x226.jpg\" alt=\"\" width=\"350\" height=\"226\" srcset=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2017\/02\/2017-02-15-221339-350x226.jpg 350w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2017\/02\/2017-02-15-221339.jpg 384w\" sizes=\"(max-width: 350px) 100vw, 350px\">It is also expected that the current EM-1 mission will slip into mid-2019 at the upcoming&nbsp;Mission Integration Review (MIR) in March, due to ongoing schedule issues with the Core Stage\u2019s path to its Green Run and the troublesome Orion spacecraft \u2013 specifically the European Space Agency\u2019s role with the Service Module.<\/p>\n<p>This, along with the need to sell SLS to the new political regime, has played a part in Acting Administrator Robert Lightfoot\u2019s wish to renew the role for SLS\u2019 debut, in conjunction with the transition team that is laying the path for the next NASA boss.<\/p>\n<p>Mr. Lightfoot, a former director of NASA\u2019s Marshall Space Flight Center (MSFC) that is deeply involved with SLS, informed the NASA workforce on Wednesday morning with the effort to realign the SLS early life in space, after speaking to Space Launch System\/Orion Suppliers Conference.<\/p>\n<h4 class=\"widget-title penci-border-arrow\">See Also<\/h4>\n<ul>\n<li>SLS Forum Section<\/li>\n<li>L2 SLS Section<\/li>\n<li>Click here to Join L2<\/li>\n<\/ul>\n<p>\u201cI have asked Bill Gerstenmaier (NASA\u2019s&nbsp;Associate Administrator for Human Exploration and Operations) to initiate a study to assess the feasibility of adding a crew to Exploration Mission-1, the first integrated flight of SLS and Orion.<\/p>\n<p>\u201cI know the challenges associated with such a proposition, like reviewing the technical feasibility, additional resources needed, and clearly the extra work would require a different launch date. That said, I also want to hear about the opportunities it could present to accelerate the effort of the first crewed flight and what it would take to accomplish that first step of pushing humans farther into space.\u201d<\/p>\n<p>     (adsbygoogle = window.adsbygoogle || []).push({});<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-medium wp-image-49218\" src=\"\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2017\/02\/2017-02-15-221914-350x247.jpg\" alt=\"\" width=\"350\" height=\"247\" srcset=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2017\/02\/2017-02-15-221914-350x247.jpg 350w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2017\/02\/2017-02-15-221914-495x350.jpg 495w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2017\/02\/2017-02-15-221914-768x543.jpg 768w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2017\/02\/2017-02-15-221914.jpg 900w\" sizes=\"(max-width: 350px) 100vw, 350px\">Those challenges are numerous. However, there has already been some work on the options that would find a middle ground between the technical requirements of testing SLS and Orion and the safety regime for the astronauts flying on a maiden launch \u2013 which would also be&nbsp;the first time since John Young and Bob Crippen rode with Columbia on her STS-1 mission.<\/p>\n<p>Sources point to two potential mission Design Reference Mission (DRM) options from SLS\u2019 CONOPS (Concept Of Operations) documentation that would help fulfill a test flight and while keeping the risk to astronauts to a \u201cminimum\u201d when compared to simply transitioning EM-2 into the role of the maiden flight.<\/p>\n<p>The first option has been touted in numerous iterations of the CONOPS as a hangover from the defunct Constellation Program (CxP).<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-medium wp-image-49219\" src=\"\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2017\/02\/2017-02-15-222054-350x281.jpg\" alt=\"\" width=\"350\" height=\"281\" srcset=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2017\/02\/2017-02-15-222054-350x281.jpg 350w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2017\/02\/2017-02-15-222054-436x350.jpg 436w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2017\/02\/2017-02-15-222054.jpg 662w\" sizes=\"(max-width: 350px) 100vw, 350px\">Known as \u201cLEO_Util_1A_C11A1: International Space Station (ISS) Back-Up Crew Delivery\u201c, this mission would involve SLS and Orion conducting a crew rotation mission for the ISS, as was the initial plan for Orion during the CxP era.<\/p>\n<p>However, the CxP plan involved Ares I, a far less powerful rocket when compared to SLS.<\/p>\n<p>The power difference becomes almost comical when the official NASA documentation cites tons of \u201cballast\u201d would need to be added to the upper stage to pull back on the reins of SLS.<\/p>\n<p>Sources note the benefit of changing the maiden flight into a LEO mission to the ISS would allow for several safety elements that were installed for the Space Shuttle during ISS missions, such as a speedy return to Earth in the event of a serious problem with \u2013 for example \u2013 the untested lift support systems, and&nbsp;the \u201cSafe Haven\u201d option of the Station should Orion\u2019s Thermal Protection System (TPS) suffer a critical problem.<\/p>\n<p>The potential benefit of a crew rotation would soon be lost if lawmakers used this DRM as another excuse to penny pitch the Commercial Crew Program (CCP) budget line to help SLS\u2019 schedule.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-medium wp-image-44209\" src=\"\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2016\/03\/Screen-Shot-2016-03-10-at-10.37.50-350x229.png\" sizes=\"(max-width: 350px) 100vw, 350px\" srcset=\"\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2016\/03\/Screen-Shot-2016-03-10-at-10.37.50-350x229.png 350w, \/\/www.nasaspaceflight.com\/wp-content\/uploads\/2016\/03\/Screen-Shot-2016-03-10-at-10.37.50-768x503.png 768w, \/\/www.nasaspaceflight.com\/wp-content\/uploads\/2016\/03\/Screen-Shot-2016-03-10-at-10.37.50-534x350.png 534w, \/\/www.nasaspaceflight.com\/wp-content\/uploads\/2016\/03\/Screen-Shot-2016-03-10-at-10.37.50.png 894w\" alt=\"Screen Shot 2016-03-10 at 10.37.50\" width=\"350\" height=\"229\">Based on EM-2 crew safety evaluations, a version of the EM-2 flight profile may become the new EM-1 option. Known as EM-2 Hybrid,&nbsp;the \u201cOrion Mission Design\u201d report notes that \u201cthe Orion Program and NASA may choose to fly a mission that is less risky in some aspects.\u201d<\/p>\n<p>This profile conserves propellant for contingency abort cases and flies a trajectory that avoids High Lunar Orbit (HLO) and allows the crew to return to Earth faster than an HLO flight path would permit.<\/p>\n<p>This kind of mission would see the crew launch into three different Earth elliptical orbits, albeit using the Exploration Upper Stage (EUS) as the example, while the first flight of SLS is currently manifested with the&nbsp;Delta Cryogenic Second Stage (DCSS).<\/p>\n<p>The first orbit would be close-range, with a first-orbit-complete-perigee engine firing from the EUS to raise the craft\u2019s orbit to 391 x 71,333 km (242.9 x 44,324.3 miles).<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-medium wp-image-44220\" src=\"\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2016\/03\/Screen-Shot-2016-03-10-at-10.49.29-350x251.png\" sizes=\"(max-width: 350px) 100vw, 350px\" srcset=\"\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2016\/03\/Screen-Shot-2016-03-10-at-10.49.29-350x251.png 350w, \/\/www.nasaspaceflight.com\/wp-content\/uploads\/2016\/03\/Screen-Shot-2016-03-10-at-10.49.29-768x551.png 768w, \/\/www.nasaspaceflight.com\/wp-content\/uploads\/2016\/03\/Screen-Shot-2016-03-10-at-10.49.29-488x350.png 488w, \/\/www.nasaspaceflight.com\/wp-content\/uploads\/2016\/03\/Screen-Shot-2016-03-10-at-10.49.29.png 1096w\" alt=\"Screen Shot 2016-03-10 at 10.49.29\" width=\"350\" height=\"251\">After this burn, Orion and its SM would separate from the upper stage.<\/p>\n<p>This second orbit of Earth would carry a total orbital period of 24 hours and would allow the crew to fully vet and check their spacecraft and its systems before committing to the swing around the moon.<\/p>\n<p>During this 24 hour orbit, if a system does not check out, Orion can remain in this orbit until the situation is resolved.<\/p>\n<p>Conversely, if a serious issue develops while in this 24 hour orbit, Orion can return the crew to Earth within 12 hours.<\/p>\n<p>However, if all systems check out, Orion\u2019s SM engine would, at a perigee of 391 km, fire for the TLI burn and propel Orion toward the moon.<\/p>\n<p>This TLI would put Orion and the crew on a \u201cnear-free return trajectory,\u201d notes the \u201cOrion Mission Design\u201d report, and would result in a swing through the lunar L2 point.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-medium wp-image-44215\" src=\"\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2016\/03\/Screen-Shot-2016-03-10-at-10.44.07-350x267.png\" sizes=\"(max-width: 350px) 100vw, 350px\" srcset=\"\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2016\/03\/Screen-Shot-2016-03-10-at-10.44.07-350x267.png 350w, \/\/www.nasaspaceflight.com\/wp-content\/uploads\/2016\/03\/Screen-Shot-2016-03-10-at-10.44.07-768x586.png 768w, \/\/www.nasaspaceflight.com\/wp-content\/uploads\/2016\/03\/Screen-Shot-2016-03-10-at-10.44.07-459x350.png 459w, \/\/www.nasaspaceflight.com\/wp-content\/uploads\/2016\/03\/Screen-Shot-2016-03-10-at-10.44.07.png 870w\" alt=\"Screen Shot 2016-03-10 at 10.44.07\" width=\"350\" height=\"267\">Concretely, it would result in Orion performing a lunar flyby at the L2 point at a distance of 61,548 km (38,244.15 miles) from the lunar surface.<\/p>\n<p>At this point, Orion\u2019s SM engine would perform the Return Trajectory Adjust (RTA) burn with a deltaV of 77 m\/s (253 f\/s) to aim the craft for the location Earth will be at for Entry Interface and landing.<\/p>\n<p>This Hybrid mission would last approximately 15-16 days. Per safety requirements, this profile would carry an added risk of radiation and MMOD strikes as Orion would make multiple passes through the Van Allen Radiation Belts and Earth proximity space.<\/p>\n<p>However, the \u201cOrion Mission Design\u201d report notes that the \u201cradiation dosage to the crew for two revolutions in the intermediate orbit is roughly equivalent to a six-month stay on the ISS.\u201d<\/p>\n<p>Any options that come from the evaluations will receive a rigorous evaluation from oversight bodies, not least NASA\u2019s Aerospace Safety Advisory Panel (ASAP) \u2013 which has previously been overly concerned about crew safety on the early Orion missions.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-medium wp-image-49220\" src=\"\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2017\/02\/2017-02-15-223251-350x220.jpg\" alt=\"\" width=\"350\" height=\"220\" srcset=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2017\/02\/2017-02-15-223251-350x220.jpg 350w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2017\/02\/2017-02-15-223251-557x350.jpg 557w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2017\/02\/2017-02-15-223251.jpg 582w\" sizes=\"(max-width: 350px) 100vw, 350px\">This body had previously noted they wish to see a 30 hour checkout period for Orion in LEO before venturing out into deep space.<\/p>\n<p>How such bodies will react to a crew riding on the maiden launch of SLS and Orion is unknown. However, there are some positive factors, thanks to Orion having already flown on the Exploration Flight Test -1 (EFT-1) and SLS\u2019 use of proven hardware, such as the RS-25 engines and Solid Rocket Boosters.<\/p>\n<p>It is also likely Mr. Lightfoot has conducted preliminary conversations with relevant departments, such as the Astronaut Office, before making his statement of intent to the workforce.<\/p>\n<p>How this will all play out on the schedule and budget line for SLS and Orion remains to be seen.<\/p>\n<p>(Images: NASA and L2 which includes, presentations, videos, graphics and internal \u2013 interactive with actual SLS engineers \u2013 updates on the SLS and HLV, available on no other site. Additional renders by L2 Artist Nathan Koga. The full gallery of Nathan\u2019s (SpaceX Dragon to MCT, SLS, Commercial Crew and more) L2 images can be *found here*))<\/p>\n<p>(L2 is \u2013 as it has been for the past several years \u2013 providing full exclusive SLS and Exploration Planning coverage. To join L2, click here:&nbsp;\/\/www.nasaspaceflight.com\/l2\/)<\/p>\n","protected":false},"excerpt":{"rendered":"<p>With NASA\u2019s management officially informing the workforce that evaluations are taking place into installing a crew on to the first flight of the Space Launch System (SLS), the challenge of ensuring crew safety will gain additional focus. Without an uncrewed test flight, a modification to the Exploration Mission -1 (EM-1) profile is likely, ranging from [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":30037,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":"","_links_to":"","_links_to_target":""},"categories":[2],"tags":[3718,4011,640,624],"class_list":["post-38861","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","tag-em-1","tag-em-2","tag-orion","tag-sls"],"acf":[],"_links":{"self":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/38861"}],"collection":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/comments?post=38861"}],"version-history":[{"count":0,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/38861\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/media\/30037"}],"wp:attachment":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/media?parent=38861"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/categories?post=38861"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/tags?post=38861"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}