{"id":38866,"date":"2017-02-07T19:55:33","date_gmt":"2017-02-07T11:55:33","guid":{"rendered":"https:\/\/wp-productionenv-bjg9h2g2bgg5b8aa.southeastasia-01.azurewebsites.net\/news\/maf-hit-by-tornado-all-personnel-safe-as-damage-assessments-begin\/"},"modified":"2017-02-07T19:55:33","modified_gmt":"2017-02-07T11:55:33","slug":"maf-hit-by-tornado-all-personnel-safe-as-damage-assessments-begin","status":"publish","type":"post","link":"https:\/\/starpath.global\/news\/maf-hit-by-tornado-all-personnel-safe-as-damage-assessments-begin\/","title":{"rendered":"MAF hit by tornado; all personnel safe as damage assessments begin"},"content":{"rendered":"<p>NASA\u2019s Michoud&nbsp;Assembly Facility (MAF) has been hit by a tornado in the early afternoon hours of Tuesday. &nbsp;The immediate extent of damage and injuries is not yet known, though&nbsp;video and photos on social media show several overturned vehicles and severely damage buildings. &nbsp;MAF&nbsp;is currently being used by NASA for construction of the core&nbsp;stage of the SLS rocket and by the Sierra Nevada Corporation for construction of the Dream Chaser spaceplane.<\/p>\n<\/p>\n<p>Tornado strike:<\/p>\n<p>As a line of severe thunderstorms associated with a spring cold front moved through the southern portions of the United States, NASA\u2019s Michoud Assembly Facility&nbsp;(MAF) in New Orleans, Louisiana, was hit by a major tornado Tuesday afternoon.<\/p>\n<p><img fetchpriority=\"high\" decoding=\"async\" class=\"size-medium wp-image-49106 alignleft\" src=\"\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2017\/02\/Screen-Shot-2017-02-07-at-13.58.14-350x332.png\" alt=\"\" width=\"350\" height=\"332\" srcset=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2017\/02\/Screen-Shot-2017-02-07-at-13.58.14-350x332.png 350w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2017\/02\/Screen-Shot-2017-02-07-at-13.58.14-369x350.png 369w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2017\/02\/Screen-Shot-2017-02-07-at-13.58.14-768x729.png 768w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2017\/02\/Screen-Shot-2017-02-07-at-13.58.14.png 828w\" sizes=\"(max-width: 350px) 100vw, 350px\">Initial weather reports from doppler radar indicated that the center of rotation for the tornado passed directly overhead of many of the main structures at MAF, with a&nbsp;well-defined debris cloud evident through side scan radar and 134 KTS from gate to gate wind measurements of the tornado that had&nbsp;rotation extending upwards to 30,000 feet.<\/p>\n<p>This radar estimated gate to gate measurement would indicate a wind speed of roughly 150mph.<\/p>\n<p>While a&nbsp;gate to gate measurement does not directly correspond to the&nbsp;Enhanced Fujita scale measurement of tornadoes, it does indicate a significant and powerful tornado.<\/p>\n<p>The official ranking of the tornado will come from National Weather Service ground observations of damage to structures, cars, and vegetation.<\/p>\n<p>     (adsbygoogle = window.adsbygoogle || []).push({});<\/p>\n<p>At the time of writing, the extent of damage at MAF is unknown \u2013 though video posted to social media shows extensive damage to some buildings.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"size-medium wp-image-49105 alignleft\" src=\"\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2017\/02\/Screen-Shot-2017-02-07-at-13.58.55-350x273.png\" alt=\"\" width=\"350\" height=\"273\" srcset=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2017\/02\/Screen-Shot-2017-02-07-at-13.58.55-350x273.png 350w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2017\/02\/Screen-Shot-2017-02-07-at-13.58.55.png 426w\" sizes=\"(max-width: 350px) 100vw, 350px\">Likewise,&nbsp;any potential injuries were&nbsp;unknown at the time of writing \u2013 though it is hoped that early&nbsp;warning&nbsp;weather&nbsp;systems would likely have given MAF employees some time to seek shelter in protected, inner-room&nbsp;areas of MAF\u2019s&nbsp;facilities.<\/p>\n<p>In the general area of New Orleans, there are reports of&nbsp;injuries, but it is not yet known if any of those injuries were sustained by workers at MAF.<\/p>\n<p>NASA\u2019s first statement on the weather event said&nbsp;that \u201cAt 11:25 a.m. CST, a tornado impacted NASA\u2019s Michoud Assembly Facility in New Orleans,\u201d noted NASA PAO Tracy McMahan.<\/p>\n<p>\u201cAt this time, only minor injuries have been reported and NASA employees and other tenants are being accounted for. There is still a threat of severe weather in the area and emergency officials are continuing to monitor the situation to ensure the safety of onsite personnel.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-medium wp-image-49123\" src=\"\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2017\/02\/2017-02-07-205125-350x249.jpg\" alt=\"\" width=\"350\" height=\"249\" srcset=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2017\/02\/2017-02-07-205125-350x249.jpg 350w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2017\/02\/2017-02-07-205125-493x350.jpg 493w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2017\/02\/2017-02-07-205125.jpg 556w\" sizes=\"(max-width: 350px) 100vw, 350px\">\u201cThe onsite Michoud emergency response team is also conducting damage assessments of buildings and facilities.\u201d<\/p>\n<p>NASA later updated that information, revealing late Tuesday night that all 3,500 employees of MAF were accounted for and that only five of them suffered minor injuries.<\/p>\n<p>The official statement late Tuesday read: \u201c\u2018Our hearts go out to our employees and the people in New Orleans who have suffered from this serious storm,\u2019 said Keith Hefner, director of the facility. \u2018The safety of our team is always our main concern, and we are pleased to report that we\u2019ve identified only minor injuries.\u2019<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"size-medium wp-image-49127 alignleft\" src=\"\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2017\/02\/Screen-Shot-2017-02-08-at-00.42.53-350x181.png\" alt=\"\" width=\"350\" height=\"181\" srcset=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2017\/02\/Screen-Shot-2017-02-08-at-00.42.53-350x181.png 350w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2017\/02\/Screen-Shot-2017-02-08-at-00.42.53-630x325.png 630w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2017\/02\/Screen-Shot-2017-02-08-at-00.42.53-768x396.png 768w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2017\/02\/Screen-Shot-2017-02-08-at-00.42.53.png 1136w\" sizes=\"(max-width: 350px) 100vw, 350px\">\u201cThe facility is currently closed and will remain closed Wednesday, Feb. 8, with only emergency personnel on site to continue damage assessments. All NASA employees and tenants who are not involved in emergency operations have been evacuated. Local law enforcement helped ensure employees arrived home safely. All utilities and services to the facility are being secured and efforts are underway to restore power.<\/p>\n<p>\u201cAt this time, emergency personnel have identified damage to building numbers 103, 350, and additional structures. Building 103, Michoud\u2019s main manufacturing building, has roof damage in several areas. Approximately 200 parked cars were damaged, and there was damage to roads and other areas near Michoud.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"size-medium wp-image-49128 alignleft\" src=\"\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2017\/02\/Screen-Shot-2017-02-08-at-00.44.14-350x259.png\" alt=\"\" width=\"350\" height=\"259\" srcset=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2017\/02\/Screen-Shot-2017-02-08-at-00.44.14-350x259.png 350w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2017\/02\/Screen-Shot-2017-02-08-at-00.44.14-473x350.png 473w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2017\/02\/Screen-Shot-2017-02-08-at-00.44.14-768x568.png 768w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2017\/02\/Screen-Shot-2017-02-08-at-00.44.14.png 1052w\" sizes=\"(max-width: 350px) 100vw, 350px\">\u201c\u2018Michoud has a comprehensive emergency plan that we activated today to ensure the safety of our people and to secure our facilities,\u2019 said Hefner. \u2018I am proud of our dedicated team onsite who are successfully implementing that plan.\u2019<\/p>\n<p>\u201cHardware for NASA\u2019s heavy-lift rocket, the Space Launch System, and the Orion spacecraft is secure, and no damage from the storm has been identified to hardware or the barge Pegasus docked at Michoud.\u201d<\/p>\n<p>MAF is a historic part of NASA, having been responsible for production of portions of the Saturn V&nbsp;Apollo moon rockets, all of the External Tanks for&nbsp;the Space Shuttle Program, and has recently undergone major upgrades for the construction of the first stage of the SLS rocket.<\/p>\n<p>The facility is also home to construction operations for Sierra Nevada\u2019s Dream Chaser spacecraft, which was recently awarded a CRS2 contract for commercial resupply efforts of the International Space Station beginning in 2019.<\/p>\n<p>This is a developing story, and this article will be updated as more information becomes available.<\/p>\n<p>**Click here for more MAF News Articles**<\/p>\n<p>MAF History:<\/p>\n<p>Michoud has played a vital role in building rocket hardware for many decades, best known to the current generation for its assembly of the large External Tanks that flew with the Space Shuttle.<\/p>\n<p>Its history ranges as far back as the 1940s, building planes and landing craft during World War II, before switching its focus to building engines for Sherman and Patton tanks for use during the Korean War.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-medium wp-image-49119\" src=\"\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2017\/02\/2017-02-07-204825-350x234.jpg\" alt=\"\" width=\"350\" height=\"234\" srcset=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2017\/02\/2017-02-07-204825-350x234.jpg 350w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2017\/02\/2017-02-07-204825-263x175.jpg 263w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2017\/02\/2017-02-07-204825.jpg 414w\" sizes=\"(max-width: 350px) 100vw, 350px\">MAF entered the rocket business in 1961, when NASA tasked the facility with the construction of first stages for the Saturn IB and Saturn V launch vehicles, prior to their shipment by barge to the Kennedy Space Center (KSC).<\/p>\n<p>Undergoing a similar transition to what it is today, Michoud had its attention switched to the construction and assembly of the Shuttle External Tanks.<\/p>\n<p>The first of the 136 tanks, ET-1 for STS-1, rolled out of the door in June, 1979&nbsp;\u2013 one of only two tanks to have its thermal protection system foam covered in white paint.<\/p>\n<p>The latter period of its ET production role was filled with both tragedy and success, as STS-107\u2019s External Tank became the focus of investigations into the loss of Columbia, after it shed a large piece of foam from its bipod ramp, critically damaging the ill-fated flagship.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-medium wp-image-49120\" src=\"\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2017\/02\/2017-02-07-204856-350x276.jpg\" alt=\"\" width=\"350\" height=\"276\" srcset=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2017\/02\/2017-02-07-204856-350x276.jpg 350w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2017\/02\/2017-02-07-204856.jpg 411w\" sizes=\"(max-width: 350px) 100vw, 350px\">The painful Return To Flight efforts resulted in major modifications to the External Tank, placing new demands on Michoud\u2019s workforce, only for the region to be decimated by a more serious weather event than Tuesday\u2019s, when Hurricane Katrina hit in 2005.<\/p>\n<p>With large numbers of the MAF workforce displaced \u2013 some with their homes completely destroyed \u2013 the downstream ET manifest was under severe strain, just as NASA were hoping to pick up the pace on ISS assembly missions to complete the Shuttle\u2019s final major role in space.<\/p>\n<p>Under the leadership of key managers, such as the highly respected Wanda Sigur, the workforce rallied, adding shifts and working Technical Interchange Meetings (TIMs) to streamline the production practises, all while improving the safety of the tanks.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-medium wp-image-49121\" src=\"\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2017\/02\/2017-02-07-204921-350x264.jpg\" alt=\"\" width=\"350\" height=\"264\" srcset=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2017\/02\/2017-02-07-204921-350x264.jpg 350w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2017\/02\/2017-02-07-204921.jpg 426w\" sizes=\"(max-width: 350px) 100vw, 350px\">Their work proved to be successful, as confirmed by the \u201cclean\u201d performance of the ETs during the vast majority of RTF launches.<\/p>\n<p>The MAF workforce managed to keep the ET schedule on track \u2013 aided by some misbehaving orbiters extending processing flows at KSC \u2013 and even returned one tank back into the mix. ET-122 was set to fly earlier in the program, before being damaged by Katrina. It successfully flew on STS-134 with Endeavour.<\/p>\n<p>However, by the time the Shuttle Program was slowing down, the workforce already knew the promise of transitioning their careers into the Constellation Program (CxP) were dashed. As as result of CxP\u2019s eventual cancellation, the vast majority of the MAF workforce were laid off as the final External Tank headed out into the Gulf of Mexico.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-medium wp-image-48257\" src=\"\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2016\/12\/2016-12-16-180131-350x245.jpg\" alt=\"\" width=\"350\" height=\"245\" srcset=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2016\/12\/2016-12-16-180131-350x245.jpg 350w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2016\/12\/2016-12-16-180131-501x350.jpg 501w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2016\/12\/2016-12-16-180131-768x537.jpg 768w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2016\/12\/2016-12-16-180131-1170x818.jpg 1170w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2016\/12\/2016-12-16-180131.jpg 1215w\" sizes=\"(max-width: 350px) 100vw, 350px\">A large number of workers could have seen their careers saved, had it not been for the delays in implementing the plan for a Heavy Lift Launch Vehicle (HLV), outlined in the 2010 Authorization Act as the flagship of a realigned exploration program.<\/p>\n<p>MAF leaders had hoped for an announcement within a timescale that may have allowed them to save a large number of workers, as was seen in their actions to extend the period prior to handing out WARN notices, several times, before finally losing patience with the politically motivated stalling tactics in Washington DC.<\/p>\n<p>The impact to the facility was severe, as only a small group of skilled workers remained, spending their days removing equipment to make way for a line of Hollywood production companies to use the wide open floor space to film scenes for movies, such as GI Joe 2 (Retaliation).<\/p>\n<p>The facility is now coming back to life, with commercial and government activities \u2013 the latter ranging from Orion hardware, through to its main role focusing on the constuction of SLS stages. Major milestones were being ticked off in recent months, relating to the core stage of the monster rocket.<\/p>\n<p>(Images: Nathan Koga, L2 Renders \u2013 L2 ET and MAF sections. Local Media \u2013 See links here: https:\/\/forum.nasaspaceflight.com\/index.php?topic=42253.0 )<\/p>\n","protected":false},"excerpt":{"rendered":"<p>NASA\u2019s Michoud&nbsp;Assembly Facility (MAF) has been hit by a tornado in the early afternoon hours of Tuesday. &nbsp;The immediate extent of damage and injuries is not yet known, though&nbsp;video and photos on social media show several overturned vehicles and severely damage buildings. &nbsp;MAF&nbsp;is currently being used by NASA for construction of the core&nbsp;stage of the [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":30028,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":"","_links_to":"","_links_to_target":""},"categories":[2],"tags":[7866,624],"class_list":["post-38866","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","tag-maf","tag-sls"],"acf":[],"_links":{"self":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/38866"}],"collection":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/comments?post=38866"}],"version-history":[{"count":0,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/38866\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/media\/30028"}],"wp:attachment":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/media?parent=38866"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/categories?post=38866"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/tags?post=38866"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}