{"id":38912,"date":"2016-11-24T00:05:03","date_gmt":"2016-11-23T16:05:03","guid":{"rendered":"https:\/\/wp-productionenv-bjg9h2g2bgg5b8aa.southeastasia-01.azurewebsites.net\/news\/space-station-in-good-health-prepares-for-busy-expedition-50-period\/"},"modified":"2016-11-24T00:05:03","modified_gmt":"2016-11-23T16:05:03","slug":"space-station-in-good-health-prepares-for-busy-expedition-50-period","status":"publish","type":"post","link":"https:\/\/starpath.global\/news\/space-station-in-good-health-prepares-for-busy-expedition-50-period\/","title":{"rendered":"Space Station in good health, prepares for busy Expedition 50 period"},"content":{"rendered":"<p>As part of the normal review process, NASA has updated the NASA Advisory Council (NAC) on the status of the International Space Station \u2013 including its overall health, upcoming visiting vehicle schedule, commercial resupply efforts, and battery deliveries and associated installation EVAs that will upgrade the Station into its next phase of operation and propel its lifetime to 2024.<\/p>\n<\/p>\n<p><b>General health of Station:<\/b><\/p>\n<p>Overall, the now 18 year-old Space Station (based on launch of the first ISS module on 20 November 1998) is operating in excellent condition and far exceeding overall systems expectations.<\/p>\n<p><img fetchpriority=\"high\" decoding=\"async\" class=\"alignleft wp-image-47938 size-medium\" src=\"\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2016\/11\/Screen-Shot-2016-11-23-at-09.04.22-350x203.png\" alt=\"Screen Shot 2016-11-23 at 09.04.22\" width=\"350\" height=\"203\" srcset=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2016\/11\/Screen-Shot-2016-11-23-at-09.04.22-350x203.png 350w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2016\/11\/Screen-Shot-2016-11-23-at-09.04.22-604x350.png 604w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2016\/11\/Screen-Shot-2016-11-23-at-09.04.22-768x445.png 768w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2016\/11\/Screen-Shot-2016-11-23-at-09.04.22-1170x678.png 1170w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2016\/11\/Screen-Shot-2016-11-23-at-09.04.22.png 1264w\" sizes=\"(max-width: 350px) 100vw, 350px\"><\/p>\n<p>While Sam Scimemi, ISS Director at NASA Headquarters, noted that a few systems and components have not behaved as well as the overall system, he stated to the NAC that \u201cIn general, if you average all the systems, we\u2019re doing much better [than the expected lifetime].<\/p>\n<p>\u201cSpace hardware is designed to last longer, and it does typically last a lot longer than predicted. &nbsp;And we\u2019re seeing that in our experience.\u201d<\/p>\n<p>However, Mr. Scimemi did state that \u201cWe\u2019ve had some particular problems with particular pieces of systems. &nbsp;In particular related to life support like our ECLSS (Environmental Control and Life Support System) system. &nbsp;We\u2019ve had individual pieces of equipment like valves that have given us trouble. &nbsp;We had some avionics parts failures that were happening because of a manufacturing issue.<\/p>\n<h4 class=\"widget-title penci-border-arrow\">See Also<\/h4>\n<ul>\n<li>ISS Section<\/li>\n<li>     (adsbygoogle = window.adsbygoogle <\/li>\n<li>L2 ISS Section<\/li>\n<li>Click here to Join L2<\/li>\n<\/ul>\n<p>\u201cSo there have been individual pieces that have been giving us issues and have been failing far more quickly or more often than designed. &nbsp;But Station as a whole has outperformed in general from back when it was originally designed.\u201d<\/p>\n<p>In terms of systems that have given controllers some issues, Mr. Scimemi specifically noted the Oxygen Generation Assembly (OGA) on Station.<\/p>\n<p>\u201cOur oxygen generation system that\u2019s been on Station and operating very well for the past five years or so finally gave out [in late-October].\u201d<\/p>\n<p>The OGA is a critical piece of life support equipment as it generates much of the oxygen needed to support a six person crew on Station. <\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft wp-image-47941 size-medium\" src=\"\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2016\/11\/Screen-Shot-2016-11-23-at-09.07.24-350x263.png\" alt=\"Screen Shot 2016-11-23 at 09.07.24\" width=\"350\" height=\"263\" srcset=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2016\/11\/Screen-Shot-2016-11-23-at-09.07.24-350x263.png 350w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2016\/11\/Screen-Shot-2016-11-23-at-09.07.24-466x350.png 466w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2016\/11\/Screen-Shot-2016-11-23-at-09.07.24.png 588w\" sizes=\"(max-width: 350px) 100vw, 350px\"><\/p>\n<p>For this particular OGA failure, the failure occurred during the three-person crew period of station hand-over operations. <\/p>\n<p>Because of the timing of the failure, Mr. Scimemi noted that \u201cWe had the Russian Elektron providing oxygen, and we worked with the crew to install the spare OGA\u201d we had on board. &nbsp;<\/p>\n<p>Removal &amp; Replacement (R&amp;R) of the OGA finished on 9 November, and the new unit has been up and running \u201cat a nominal 22%\u201d ever since.<\/p>\n<p>Spare parts for the newly-installed OGA will be flown to Station on the scheduled 1 December launch of Progress 65P, and a full spare OGA will be launched on the upcoming OA-7 flight of Cygnus on Atlas V from the Kennedy Space Center in March 2017.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"size-medium wp-image-47943 alignleft\" src=\"\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2016\/11\/Screen-Shot-2016-11-23-at-09.09.26-350x232.png\" alt=\"Screen Shot 2016-11-23 at 09.09.26\" width=\"350\" height=\"232\" srcset=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2016\/11\/Screen-Shot-2016-11-23-at-09.09.26-350x232.png 350w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2016\/11\/Screen-Shot-2016-11-23-at-09.09.26-528x350.png 528w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2016\/11\/Screen-Shot-2016-11-23-at-09.09.26-768x509.png 768w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2016\/11\/Screen-Shot-2016-11-23-at-09.09.26-1920x1273.png 1920w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2016\/11\/Screen-Shot-2016-11-23-at-09.09.26-1170x776.png 1170w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2016\/11\/Screen-Shot-2016-11-23-at-09.09.26-780x516.png 780w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2016\/11\/Screen-Shot-2016-11-23-at-09.09.26-585x390.png 585w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2016\/11\/Screen-Shot-2016-11-23-at-09.09.26-263x175.png 263w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2016\/11\/Screen-Shot-2016-11-23-at-09.09.26.png 1934w\" sizes=\"(max-width: 350px) 100vw, 350px\">The NAC then followed up on the OGA discussion, asking about the predicted lifetime of the OGA.<\/p>\n<p>Mr. Scimemi noted that the OGA carried a lifetime of 5 years, so it met its certification criteria in that regard.<\/p>\n<p>For the NAC, the conversation about the OGA continued, with questions regarding a potential generic issues with the OGAs \u2013 including the spare just installed on Station.<\/p>\n<p>Mr. Scimemi stated that the referenced issue is within the cell stack of the OGA. <\/p>\n<p>\u201cWe thought that this failure might apply to the spare as well. &nbsp;But this spare is up and operating, so we\u2019re doing that [investigative] work right now\u201d on the ground. <\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"size-medium wp-image-47945 alignleft\" src=\"\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2016\/11\/Screen-Shot-2016-11-23-at-09.11.16-350x214.png\" alt=\"Screen Shot 2016-11-23 at 09.11.16\" width=\"350\" height=\"214\" srcset=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2016\/11\/Screen-Shot-2016-11-23-at-09.11.16-350x214.png 350w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2016\/11\/Screen-Shot-2016-11-23-at-09.11.16-573x350.png 573w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2016\/11\/Screen-Shot-2016-11-23-at-09.11.16-180x110.png 180w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2016\/11\/Screen-Shot-2016-11-23-at-09.11.16-768x469.png 768w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2016\/11\/Screen-Shot-2016-11-23-at-09.11.16-1170x715.png 1170w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2016\/11\/Screen-Shot-2016-11-23-at-09.11.16.png 1418w\" sizes=\"(max-width: 350px) 100vw, 350px\">Mr. Scimemi then used this opportunity to talk to the NAC about how this specific issue is being worked in terms of the anticipated introduction of a next generation OGA system to the Station beginning in 2019. &nbsp;<\/p>\n<p>\u201cThe things we\u2019re learning from the entire ECLSS system we\u2019re applying to the next generation system. &nbsp;We\u2019re taking all these lessons in terms of design and also in terms of the way we operate the systems.\u201d<\/p>\n<p>In terms of the next generation OGA, Mr. Scimemi noted that it\u2019s anticipated to start going up to Station in 2019 \u2013 with a few years of installation work before it\u2019s fully integrated to the Station.<\/p>\n<p>Importantly, this next generation OGA is representative of the larger work and education of the systems the ISS affords NASA.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"size-medium wp-image-47948 alignleft\" src=\"\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2016\/11\/Screen-Shot-2016-11-23-at-09.15.34-350x268.png\" alt=\"Screen Shot 2016-11-23 at 09.15.34\" width=\"350\" height=\"268\" srcset=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2016\/11\/Screen-Shot-2016-11-23-at-09.15.34-350x268.png 350w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2016\/11\/Screen-Shot-2016-11-23-at-09.15.34-458x350.png 458w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2016\/11\/Screen-Shot-2016-11-23-at-09.15.34-768x587.png 768w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2016\/11\/Screen-Shot-2016-11-23-at-09.15.34-1170x894.png 1170w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2016\/11\/Screen-Shot-2016-11-23-at-09.15.34.png 1274w\" sizes=\"(max-width: 350px) 100vw, 350px\">According to Mr. Scimemi, Station engineers never intended to redesign the OGA. &nbsp;But real-time operations and data have changed that position.<\/p>\n<p>Moreover, in terms of Station outfitting, Mr. Scimemi overviewed the installation of the International Docking Adaptor in August. <\/p>\n<p>\u201cBack in August, we did the IDA installation. &nbsp;It went quite well, and [the crew] performed all the tasks they expected\u201d from a technical standpoint, though there was a loss of comm in EV-1.<\/p>\n<p>\u201cIt turned out to be an issue between flight and the ground,\u201d stated Mr. Scimemi. &nbsp;\u201cTo this end, the vehicle teams are working to make sure that doesn\u2019t happen again.<\/p>\n<p>\u201cMoreover, back in September, we retracted the temporary thermal radiator that\u2019s been out on the end of the Truss. &nbsp;<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"size-medium wp-image-47953 alignleft\" src=\"\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2016\/11\/Screen-Shot-2016-11-23-at-09.23.06-350x233.png\" alt=\"Screen Shot 2016-11-23 at 09.23.06\" width=\"350\" height=\"233\" srcset=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2016\/11\/Screen-Shot-2016-11-23-at-09.23.06-350x233.png 350w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2016\/11\/Screen-Shot-2016-11-23-at-09.23.06-526x350.png 526w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2016\/11\/Screen-Shot-2016-11-23-at-09.23.06-768x511.png 768w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2016\/11\/Screen-Shot-2016-11-23-at-09.23.06-1920x1277.png 1920w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2016\/11\/Screen-Shot-2016-11-23-at-09.23.06-1170x778.png 1170w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2016\/11\/Screen-Shot-2016-11-23-at-09.23.06-780x516.png 780w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2016\/11\/Screen-Shot-2016-11-23-at-09.23.06-585x390.png 585w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2016\/11\/Screen-Shot-2016-11-23-at-09.23.06-263x175.png 263w\" sizes=\"(max-width: 350px) 100vw, 350px\">\u201cWe assisted it down and installed the shroud, and it went very well. &nbsp;And we were actually able to complete several get ahead tasks. &nbsp;<\/p>\n<p>\u201cWe were able to install a high definition camera and we tied back the CETA cart brake handle. So that\u2019s another EVA that went very well\u201d earlier this year.<\/p>\n<p>Importantly, Mr. Scimemi also overviewed the current status of consumables aboard the Station.<\/p>\n<p>Specifically, Mr. Scimemi noted that the ISS program has learned how to better manage its consumables (i.e.: water and food).<\/p>\n<p>Currently, there is enough food on ISS to take the crew out to April 2017 (to June with rationing).<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"size-medium wp-image-47949 alignleft\" src=\"\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2016\/11\/Screen-Shot-2016-11-23-at-09.17.19-350x197.png\" alt=\"Screen Shot 2016-11-23 at 09.17.19\" width=\"350\" height=\"197\" srcset=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2016\/11\/Screen-Shot-2016-11-23-at-09.17.19-350x197.png 350w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2016\/11\/Screen-Shot-2016-11-23-at-09.17.19-623x350.png 623w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2016\/11\/Screen-Shot-2016-11-23-at-09.17.19-768x431.png 768w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2016\/11\/Screen-Shot-2016-11-23-at-09.17.19-1920x1078.png 1920w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2016\/11\/Screen-Shot-2016-11-23-at-09.17.19-1170x657.png 1170w\" sizes=\"(max-width: 350px) 100vw, 350px\">However, that assumes that all upcoming resupply missions in December and January fail to arrive at Station.<\/p>\n<p>If the upcoming Progress 65P mission is successful, food supplies will last out until mid-May 2017 (July with rationing).<\/p>\n<p>At present, the limiting consumable on Station is water, with current supplies under normal usage lasting until March 2017 \u2013 14 June under crew reduction or rationing operations.<\/p>\n<p>If Progress 65P is successful, water supplies will nominally last through 2 May 2017 \u2013 1 August with crew reduction or rationing efforts.<\/p>\n<p><b>Visiting Vehicles and Commercial Resupply efforts:<\/b><\/p>\n<p>While Progress 65P is the first of the upcoming Visiting Vehicles (VVs) set to launch to the ISS in December, the first half of the month is projected to be an intense period of VV activity for the six-person Expedition 50 crew.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"size-medium wp-image-47956 alignleft\" src=\"\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2016\/11\/Screen-Shot-2016-11-23-at-09.25.29-350x249.png\" alt=\"Screen Shot 2016-11-23 at 09.25.29\" width=\"350\" height=\"249\" srcset=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2016\/11\/Screen-Shot-2016-11-23-at-09.25.29-350x249.png 350w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2016\/11\/Screen-Shot-2016-11-23-at-09.25.29-491x350.png 491w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2016\/11\/Screen-Shot-2016-11-23-at-09.25.29-768x547.png 768w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2016\/11\/Screen-Shot-2016-11-23-at-09.25.29-1170x833.png 1170w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2016\/11\/Screen-Shot-2016-11-23-at-09.25.29.png 1348w\" sizes=\"(max-width: 350px) 100vw, 350px\">Progress 65P is set to launch on 1 December and dock to the Station on 3 December \u2013 followed closely by JAXA\u2019s HTV-6 resupply craft.<\/p>\n<p>\u201cWe have HTV coming up,\u201d notes Mr. Scimemi. &nbsp;\u201cThat\u2019s planning to launch on December 9th, and it has all of our important batteries\u201d for our January EVAs. <\/p>\n<p>HTV was initially set to launch earlier in the fall, but a fuel line issue necessitated a destack and swap out to correct the issue.<\/p>\n<p>Mr. Scimemi noted that JAXA is now back into a readiness posture to launch HTV on 9 December, which under the most-recent Flight Planning and Integration Panel document \u2013 available for download on L2 \u2013 will place HTV-6 at Station for grapple and berthing on 13 December.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"size-medium wp-image-47958 alignleft\" src=\"\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2016\/11\/Screen-Shot-2016-11-23-at-09.27.22-350x231.png\" alt=\"Screen Shot 2016-11-23 at 09.27.22\" width=\"350\" height=\"231\" srcset=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2016\/11\/Screen-Shot-2016-11-23-at-09.27.22-350x231.png 350w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2016\/11\/Screen-Shot-2016-11-23-at-09.27.22-530x350.png 530w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2016\/11\/Screen-Shot-2016-11-23-at-09.27.22-768x507.png 768w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2016\/11\/Screen-Shot-2016-11-23-at-09.27.22-1170x772.png 1170w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2016\/11\/Screen-Shot-2016-11-23-at-09.27.22-780x516.png 780w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2016\/11\/Screen-Shot-2016-11-23-at-09.27.22-263x175.png 263w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2016\/11\/Screen-Shot-2016-11-23-at-09.27.22.png 1454w\" sizes=\"(max-width: 350px) 100vw, 350px\">In all, HTV-6 will deliver 2,750 kg of pressurized cargo and 1,400 kg of external cargo \u2013 the six batteries.<\/p>\n<p>Once those batteries are at Station, the Expedition 50 crew will be tasked with R&amp;Ring the current set of batteries with the new ones.<\/p>\n<p>According to Mr. Scimemi, \u201cComing up in January, we\u2019ve got two critical EVAs based on the batteries being brought up on the HTV. <\/p>\n<p>\u201cThese batteries are critical for the overall long-duration extension of the Station to 2024 and beyond.\u201d<\/p>\n<p>To aid the Expedition 50 crew\u2019s EVA tasks with the batteries, ground robotic controllers have already used the Dextre robot on the exterior of the Station to break all the torque on the bolts on the installed batteries.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"size-medium wp-image-47959 alignleft\" src=\"\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2016\/11\/Screen-Shot-2016-11-23-at-09.29.06-350x256.png\" alt=\"Screen Shot 2016-11-23 at 09.29.06\" width=\"350\" height=\"256\" srcset=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2016\/11\/Screen-Shot-2016-11-23-at-09.29.06-350x256.png 350w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2016\/11\/Screen-Shot-2016-11-23-at-09.29.06-478x350.png 478w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2016\/11\/Screen-Shot-2016-11-23-at-09.29.06-768x562.png 768w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2016\/11\/Screen-Shot-2016-11-23-at-09.29.06-1170x856.png 1170w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2016\/11\/Screen-Shot-2016-11-23-at-09.29.06.png 1306w\" sizes=\"(max-width: 350px) 100vw, 350px\">Mr. Scimemi noted that this robotic operation went very well, even \u201cbetter than expected.\u201d<\/p>\n<p>While only two EVAs are currently planned for the battery R&amp;R, there are two back-up, contingency EVAs also in the schedule should the R&amp;R run into issues and require more time.<\/p>\n<p>After 65P and HTV-6, the next officially scheduled resupply mission to Station is the 3 February 2017 launch of the 66P Progress, followed by March\u2019s OA-7 launch of Cygnus.<\/p>\n<p>It remains entirely possible that SpaceX will be ready to resume flights to the ISS in the January 2017 timeframe \u2013 assuming a successful recovery to flight operations from the AMOS-6 accident on 1 September 2016 and the completion and activation of LC-39A at the Kennedy Space Center.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"size-medium wp-image-47961 alignleft\" src=\"\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2016\/11\/Screen-Shot-2016-11-23-at-09.33.11-350x254.png\" alt=\"Screen Shot 2016-11-23 at 09.33.11\" width=\"350\" height=\"254\" srcset=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2016\/11\/Screen-Shot-2016-11-23-at-09.33.11-350x254.png 350w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2016\/11\/Screen-Shot-2016-11-23-at-09.33.11-482x350.png 482w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2016\/11\/Screen-Shot-2016-11-23-at-09.33.11-768x558.png 768w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2016\/11\/Screen-Shot-2016-11-23-at-09.33.11-1170x850.png 1170w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2016\/11\/Screen-Shot-2016-11-23-at-09.33.11.png 1732w\" sizes=\"(max-width: 350px) 100vw, 350px\">Specifically, Mr. Scimemi noted that three NASA personnel are participating in the SpaceX Anomaly Team investigation, and NASA has also set up an independent review panel to examine whatever conclusions come from the AMOS-6 investigation.<\/p>\n<p>Mr. Scimemi also noted that damage to SpaceX\u2019s SLC-40 pad at the Cape Canaveral Air Force Station \u201cwas extensive\u201d and SpaceX is focusing on getting LC-39A up and running.<\/p>\n<p>However, the NAC had several concerns\/questions regarding SpaceX\u2019s investigation. <\/p>\n<p>Mr. Wayne Hale specifically noted that \u201cUsually we don\u2019t go forward until we know an exact root cause or an underlying cause. And I don\u2019t think they\u2019ve gotten to that point (an exact root cause) in this investigation.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-medium wp-image-47933\" src=\"\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2016\/11\/2016-11-22-224027-350x234.jpg\" alt=\"2016-11-22-224027\" width=\"350\" height=\"234\" srcset=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2016\/11\/2016-11-22-224027-350x234.jpg 350w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2016\/11\/2016-11-22-224027-263x175.jpg 263w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2016\/11\/2016-11-22-224027.jpg 498w\" sizes=\"(max-width: 350px) 100vw, 350px\">\u201cIf they don\u2019t find a real underlying cause, just an idea of what it was, but they don\u2019t have a corrective action, does NASA have any thoughts on that or what we plan to do?\u201d<\/p>\n<p>Mr. Scimemi answered that \u201cmany anomalies never get to hard root cause. &nbsp;A lot of times we get to the most probable cause, and we\u2019ve had that before. &nbsp;<\/p>\n<p>\u201cSo what happens is that since NASA is participating in the anomaly investigation team, we actually understand all the technical rationale of how they get to where they potentially get. &nbsp;And all that knowledge will be given to NASA as well as all the corrective action before return to flight.<\/p>\n<p>\u201cAnd that\u2019s all spelled out in the CRS contract. &nbsp;So [SpaceX will] have to prove to NASA that it\u2019s safe to fly when they\u2019re ready to fly. &nbsp;And we will actually have to accept what they found and what the corrective actions were. <\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft\" src=\"\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2016\/08\/2016-08-03-134705-350x222.jpg\" alt=\"2016-08-03-134705\" width=\"350\" height=\"222\">The NAC continued questioning the possibility of \u201cno corrective action\u201d on SpaceX\u2019s part, asking if Mr. Scimemi expected there to be \u201csome corrective action even though [SpaceX] might not be able to determine root cause? &nbsp;Or might [SpaceX] move forward with this as a one-time anomaly?\u201d<\/p>\n<p>Mr. Scimemi stated that the teams have not \u201cgotten to that point yet.\u201d<\/p>\n<p>Regardless of when SpaceX is able to resume CRS-1 contracted flights to ISS, Mr. Scimemi noted that NASA has completed the first and second milestones of the CRS-2 contract awards with SpaceX, Orbital ATK, and Sierra Nevada.<\/p>\n<p>Additionally, \u201cwe\u2019ve kicked off the third milestone with Orbital ATK, and we expect to kick off the third milestone for Sierra Nevada and SpaceX soon,\u201d noted Mr. Scimemi.<\/p>\n<p>(Images: NASA, ESA, CSA, Roscomos, and L2 \u2013 including&nbsp;L2 artist Nathan Koga \u2013 The full gallery of Nathan\u2019s (SpaceX Dragon to MCT, SLS, Commercial Crew and more) L2 images can be *found here*)<\/p>\n<p>(To join L2, click here:&nbsp;\/\/www.nasaspaceflight.com\/l2\/)<\/p>\n","protected":false},"excerpt":{"rendered":"<p>As part of the normal review process, NASA has updated the NASA Advisory Council (NAC) on the status of the International Space Station \u2013 including its overall health, upcoming visiting vehicle schedule, commercial resupply efforts, and battery deliveries and associated installation EVAs that will upgrade the Station into its next phase of operation and propel [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":"","_links_to":"","_links_to_target":""},"categories":[2],"tags":[233],"class_list":["post-38912","post","type-post","status-publish","format-standard","hentry","category-news","tag-iss"],"acf":[],"_links":{"self":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/38912"}],"collection":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/comments?post=38912"}],"version-history":[{"count":0,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/38912\/revisions"}],"wp:attachment":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/media?parent=38912"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/categories?post=38912"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/tags?post=38912"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}