{"id":38966,"date":"2016-09-08T00:11:32","date_gmt":"2016-09-07T16:11:32","guid":{"rendered":"https:\/\/wp-productionenv-bjg9h2g2bgg5b8aa.southeastasia-01.azurewebsites.net\/news\/antares-readying-for-rtf-with-oa-5-cygnus-waiting-on-a-launch-date\/"},"modified":"2016-09-08T00:11:32","modified_gmt":"2016-09-07T16:11:32","slug":"antares-readying-for-rtf-with-oa-5-cygnus-waiting-on-a-launch-date","status":"publish","type":"post","link":"https:\/\/starpath.global\/news\/antares-readying-for-rtf-with-oa-5-cygnus-waiting-on-a-launch-date\/","title":{"rendered":"Antares readying for RTF with OA-5 Cygnus, waiting on a launch date"},"content":{"rendered":"<p>The Return To Flight (RTF) of Orbital ATK\u2019s Antares rocket is currently waiting on a launch date decision, following resolution work after May\u2019s Static Fire test. The launch, expected to take place in the next four or five weeks, will task Antares with lofting the OA-5 Cygnus en route to a berthing slot in the International Space Station\u2019s increasingly convoluted Visiting Vehicle schedule.<\/p>\n<p>\nAntares Return:<\/p>\n<p>The long-awaited return of Antares will take place almost two years after the CRS-3 mission failed just seconds after lift-off from the Wallops launch site.<\/p>\n<p><img fetchpriority=\"high\" decoding=\"async\" class=\"alignleft\" src=\"\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2015\/08\/2015-08-07-122716-350x210.jpg\" alt=\"2015-08-07-122716\" width=\"350\" height=\"210\">Two Cygnus missions have taken place since the loss of Antares \u2013 thanks to her ability to launch with multiple launch vehicles.<\/p>\n<p>Those missions \u2013&nbsp;OA-4 and OA-6&nbsp;\u2013 were successfully launched on United Launch Alliance (ULA) Atlas V rockets, flying out of Cape Canaveral Air Force Station SLC-41 in Florida in December 2015 and&nbsp;March 2016, respectively.<\/p>\n<p>The hiring of Atlas V allowed Orbital ATK to continue with its Commercial Resupply Services (CRS) obligations, while work on bringing Cygnus\u2019 natural launch vehicle back into service.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft\" src=\"\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2016\/05\/Screen-Shot-2016-05-31-at-09.44.12-350x275.png\" alt=\"Screen Shot 2016-05-31 at 09.44.12\" width=\"350\" height=\"275\">After the CRS-3 mishap at Wallops in October 2014, Orbital ATK decided to re-engine the first stage of the launch vehicle with RD-181 engines from NPO Energomash.<\/p>\n<p>The two RD-181 engines replaced Aerojet AJ-26 engines that were used in the first Antares launches in 2013 and 2014.<\/p>\n<p>NASA mission patches<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>NASA mission updates<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>Technology News<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>\n<p>     (adsbygoogle = window.adsbygoogle || []).push({});<\/p>\n<p>The new vehicle configuration is designated as the Antares 200 series, capable of lofting the larger version of the Cygnus spacecraft that debuted with the rides uphill on the Atlas V.<\/p>\n<p>Cygnus flights to the ISS will use the new first stage coupled with Orbital ATK\u2019s CASTOR 30XL solid motor as a second stage in the Antares 230 configuration.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft\" src=\"\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2016\/06\/2016-06-15-234229-350x247.jpg\" alt=\"2016-06-15-234229\" width=\"350\" height=\"247\">With repairs of the Wallops launch site&nbsp;at the Mid-Atlantic Regional Spaceport (MARS)&nbsp;complete, the new Antares rocket was rolled out to Pad 0A for a static fire test.<\/p>\n<p>At the time of the test, Antares was targeting a return date of July 6 for the&nbsp;OA-5 mission to the ISS.<\/p>\n<p>Notably, the Antares 230 core stage for OA-5 was not the first stage that underwent the static fire.<\/p>\n<p>The OA-5 rocket remained inside the integration facility, awaiting the results of the tests taking place on her sister that is destined to launch on the OA-7 mission.<\/p>\n<h4 class=\"widget-title penci-border-arrow\">See Also<\/h4>\n<ul>\n<li>Antares\/Cygnus OA-5<\/li>\n<li>Orbital Forum Section<\/li>\n<li>L2 Antares\/Cygnus Special<\/li>\n<li>Click here to Join L2<\/li>\n<\/ul>\n<p>Orbital ATK then opted to delay the launch date&nbsp;due to the requirement for \u201cstatic fire test data analysis to be completed, along with final trajectory shaping work.\u201d<\/p>\n<p>During the interim period, Antares engineers fine-tuned Antares, based on the results of the static fire test. This included the replacement of an engine actuator.<\/p>\n<p>\u201cDuring the testing and inspection process of the OA-5 vehicle, an unexpected engine actuator response was detected,\u201d noted Trina Helquist, Sr. Manager Communications with Orbital ATK\u2019s Launch Vehicles Division.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-medium wp-image-46751\" src=\"\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2016\/09\/2016-09-06-220809-350x246.jpg\" alt=\"2016-09-06-220809\" width=\"350\" height=\"246\" srcset=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2016\/09\/2016-09-06-220809-350x246.jpg 350w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2016\/09\/2016-09-06-220809-498x350.jpg 498w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2016\/09\/2016-09-06-220809.jpg 585w\" sizes=\"(max-width: 350px) 100vw, 350px\">\u201cIn order to fully understand the occurrence, the unit was removed. We have since replaced the actuator and have completed its initial testing to ensure its readiness for the OA-5 mission.\u201d<\/p>\n<p>The static fire also proved its worth when a hardware review identified a trace amount of particulate in the pneumatic system. However, Orbital ATK noted that was introduced through an interface used for ground testing and which is not used in actual flight operations.<\/p>\n<p>\u201cWe have incorporated corrective action into our processes. All other ground systems, both in the launch vehicle assembly facility and at the launch pad, were inspected and confirmed to meet specifications.\u201d<\/p>\n<p>\u201cWe will continue to follow our rigorous testing and inspection procedures to ensure mission success.\u201d<\/p>\n<p>A<img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-medium wp-image-46670\" src=\"\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2016\/08\/2016-09-01-002407-350x258.jpg\" alt=\"2016-09-01-002407\" width=\"350\" height=\"258\" srcset=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2016\/08\/2016-09-01-002407-350x258.jpg 350w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2016\/08\/2016-09-01-002407-476x350.jpg 476w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2016\/08\/2016-09-01-002407.jpg 545w\" sizes=\"(max-width: 350px) 100vw, 350px\">ntares\u2019 launch date with the Cygnus spacecraft has the additional challenge of negotiating a slot for arrival in the Station\u2019s busy Visiting Vehicle (VV) schedule, which has become more convoluted over recent weeks.<\/p>\n<p>Japan\u2019s HTV-6 mission to the Station was set to take place in early October&nbsp;and as such provided the main roadblock to Cygnus\u2019 path to the orbital outpost \u2013 although the ISS management can request a level of rearrangement to cater for all partners.<\/p>\n<p>Notably, Mitsubishi Heavy Industries, Ltd. and the Japan Aerospace Exploration Agency (JAXA) recently decided to postpone the launch of HTV-6 from its October 1 launch date \u2013 to a yet-to-be-determined slot \u2013 after a leak was found during processing on the cargo vehicle.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-medium wp-image-46767\" src=\"\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2016\/09\/2016-09-07-122902-350x228.jpg\" alt=\"2016-09-07-122902\" width=\"350\" height=\"228\" srcset=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2016\/09\/2016-09-07-122902-350x228.jpg 350w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2016\/09\/2016-09-07-122902-538x350.jpg 538w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2016\/09\/2016-09-07-122902.jpg 645w\" sizes=\"(max-width: 350px) 100vw, 350px\">Orbital ATK confirmed an exact launch date for its OA-5 Cygnus has not yet been determined. The current official NET (No Earlier Than) date is late September, although that is expected to change, with the launch expected to take place in the next four to five weeks \u2013 which points to an October date.<\/p>\n<p>Cygnus is only expected to make a short visit to the Station, with the most recent&nbsp;Flight Planning Integration Panel (FPIP) manifest (L2) showing Cygnus\u2019 berthed mission is only scheduled for nine days.<\/p>\n<p>The OA-7 Cygnus will enjoy a much longer stay, with a berthed mission of just over two months, per the FPIP manifest document.<\/p>\n<p>The previous plan was for HTV-6 to reside at the ISS for over a month, prior to the arrival of SpaceX\u2019s CRS-10 Dragon spacecraft. However, Dragon\u2019s schedule is also now \u201cunder review\u201d as a result of the fallout from the loss of the Falcon 9 with Amos-6 during a Static Fire test this month.<\/p>\n<p>Although the ISS is \u201cwell stocked\u201d to cope with the changes to its supply vehicle launch dates, ISS managers are busy realigning their planning schedules, which will eventually provide launch date options for Antares\u2019 return.<\/p>\n<p>(Images: Orbital ATK, ULA, Pratt &amp; Whitney Rocketdyne, NASA and L2 including renders from L2 artist Nathan Koga \u2013 The full gallery of Nathan\u2019s (SpaceX Dragon to MCT, SLS, Commercial Crew and more) L2 images can be *found here*)<\/p>\n<p>(To join L2, click here:&nbsp;\/\/www.nasaspaceflight.com\/l2\/)<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The Return To Flight (RTF) of Orbital ATK\u2019s Antares rocket is currently waiting on a launch date decision, following resolution work after May\u2019s Static Fire test. The launch, expected to take place in the next four or five weeks, will task Antares with lofting the OA-5 Cygnus en route to a berthing slot in the [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":30158,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":"","_links_to":"","_links_to_target":""},"categories":[2],"tags":[1871,639,233],"class_list":["post-38966","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","tag-antares","tag-cygnus","tag-iss"],"acf":[],"_links":{"self":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/38966"}],"collection":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/comments?post=38966"}],"version-history":[{"count":0,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/38966\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/media\/30158"}],"wp:attachment":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/media?parent=38966"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/categories?post=38966"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/tags?post=38966"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}