{"id":39075,"date":"2016-04-29T19:50:25","date_gmt":"2016-04-29T11:50:25","guid":{"rendered":"https:\/\/wp-productionenv-bjg9h2g2bgg5b8aa.southeastasia-01.azurewebsites.net\/news\/oa-6-atlas-v-booster-shortcomings-due-to-mrcv-anomaly\/"},"modified":"2016-04-29T19:50:25","modified_gmt":"2016-04-29T11:50:25","slug":"oa-6-atlas-v-booster-shortcomings-due-to-mrcv-anomaly","status":"publish","type":"post","link":"https:\/\/starpath.global\/news\/oa-6-atlas-v-booster-shortcomings-due-to-mrcv-anomaly\/","title":{"rendered":"OA-6: Atlas V booster shortcomings due to MRCV anomaly"},"content":{"rendered":"<p>Despite successfully lofting the OA-6 Cygnus safely into orbit, United Launch Alliance (ULA) engineers have been investigating the first stage launch phase of the Atlas V\u2019s March mission. The Atlas V booster shutdown several seconds ahead of schedule due to what is now classed as a fault with&nbsp;RD-180 Mixture Ratio Control Valve (MRCV) assembly.<\/p>\n<p>Atlas V Update:<\/p>\n<p>The Atlas V is one of the most reliable rockets in the world, with all of her 62 launches classed as mission successes. This is despite what is now two missions where an anomaly had to be overcome.<\/p>\n<p>The first mission to suffer an issue was the 2007 launch of the NRO L-30 spy satellite mission, which saw its pair of spacecraft deployed into a lower-than-intended orbit when the Centaur upper stage shut down ahead of schedule.<\/p>\n<h4 class=\"widget-title penci-border-arrow\">See Also<\/h4>\n<ul>\n<li>ULA Forum Section<\/li>\n<li>L2 Master Section<\/li>\n<li>Click here to Join L2<\/li>\n<\/ul>\n<p>The premature shutdown was blamed on a leaky valve, starving the upper stage of fuel for its second burn ahead of spacecraft separation. The spacecraft still went on to achieve their operational orbital parameters. As such, this mission is only classed as a \u201cpartial\u201d failure by observers, while ULA class it as successful.<\/p>\n<p>Interestingly, it was the Centaur that came to the rescue during the OA-6 mission to send the latest Cygnus spacecraft on a path toward the International Space Station.<\/p>\n<p><img fetchpriority=\"high\" decoding=\"async\" class=\"alignleft size-medium wp-image-44997\" src=\"\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2016\/04\/2016-04-29-152624-350x229.jpg\" alt=\"2016-04-29-152624\" width=\"350\" height=\"229\" srcset=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2016\/04\/2016-04-29-152624-350x229.jpg 350w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2016\/04\/2016-04-29-152624.jpg 525w\" sizes=\"(max-width: 350px) 100vw, 350px\">Atlas V launched on its&nbsp;first attempt at the opening of the available window, departing from SLC-41 at Cape Canaveral.<\/p>\n<p>The first stage was set to burn for four minutes and 15.5 seconds before its engine shut down. However, the timing of engine shutdown was shown to be six seconds earlier than planned.<\/p>\n<p>Following staging, the Centaur\u2019s RL10C-1 engine entered its prestart phase.&nbsp;Ten seconds after stage separation, the Centaur engine ignited to begin a single burn that was pre-planned for a duration of thirteen minutes and 38 seconds.<\/p>\n<p>Space Shuttle<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>Aerospace industry analysis<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>Space Technology<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>\n<p>     (adsbygoogle = window.adsbygoogle || []).push({});<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-medium wp-image-44475\" src=\"\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2016\/03\/2016-03-25-145605-350x241.jpg\" alt=\"2016-03-25-145605\" width=\"350\" height=\"241\" srcset=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2016\/03\/2016-03-25-145605-350x241.jpg 350w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2016\/03\/2016-03-25-145605-508x350.jpg 508w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2016\/03\/2016-03-25-145605.jpg 554w\" sizes=\"(max-width: 350px) 100vw, 350px\">However, this burn lasted&nbsp;over a minute longer, as Centaur worked to overcome the shortfall of the Atlas V\u2019s first stage performance.<\/p>\n<p>Centaur ably delivered&nbsp;Cygnus into the correct 230km orbit and&nbsp;into its&nbsp;correct&nbsp;RAAN (Right Ascension of the Ascending Node), which ultimately classed the mission as&nbsp;a success.<\/p>\n<p>The Upper Stage\u2019s extra push resulted in Cygnus being 300 km further downrange than expected at spacecraft separation.<\/p>\n<p>However, this parameter held no notable impact on the spacecraft\u2019s mission, with any \u201cin-track error\u201d easily compensated for by adjusting the timing and duration of phasing burns to get to the rendezvous point.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-medium wp-image-44998\" src=\"\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2016\/04\/2016-04-29-152737-350x243.jpg\" alt=\"2016-04-29-152737\" width=\"350\" height=\"243\" srcset=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2016\/04\/2016-04-29-152737-350x243.jpg 350w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2016\/04\/2016-04-29-152737-504x350.jpg 504w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2016\/04\/2016-04-29-152737.jpg 575w\" sizes=\"(max-width: 350px) 100vw, 350px\">Cygnus arrived at the ISS within the timeline and was successfully berthed for her \u201cOn Station\u201d mission phase.<\/p>\n<p>\u201cDuring the launch, the system experienced a premature first stage shutdown. Atlas is a robust system,\u201d as outlined by ULA. \u201cThe Centaur upper stage compensated for the first stage anomaly, delivering Cygnus to a precise orbit, well within the required accuracy.\u201d<\/p>\n<p>While Centaur delivered Cygnus into her correct orbit, the stage still had one final job to complete: to deorbit itself into an area pre-noted in the NOTAM (Notice To Airmen) zone over the ocean near Australia.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-medium wp-image-44473\" src=\"\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2016\/03\/2016-03-25-145343-350x231.jpg\" alt=\"2016-03-25-145343\" width=\"350\" height=\"231\" srcset=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2016\/03\/2016-03-25-145343-350x231.jpg 350w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2016\/03\/2016-03-25-145343-531x350.jpg 531w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2016\/03\/2016-03-25-145343-263x175.jpg 263w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2016\/03\/2016-03-25-145343.jpg 681w\" sizes=\"(max-width: 350px) 100vw, 350px\">The stage\u2019s RL10C-1 started up as expected for the disposal burn, but due to the depletion of its propellent from having to burn longer than planned, it shut down shortly after&nbsp;the burn began.<\/p>\n<p>As a result, the stage entered a contingency sequence for just such an occurrence but was unable to&nbsp;restart the engine due to \u201crunning on fumes\u201d. It&nbsp;is understood, however, that Centaur still re-entered over water, south of New Zealand instead of south of (central to western) Australia.<\/p>\n<p>A fiery farewell for a stage that showed it could overcome the challenges of an underperformance from its booster partner.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-medium wp-image-44995\" src=\"\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2016\/04\/2016-04-29-152106-350x234.jpg\" alt=\"2016-04-29-152106\" width=\"350\" height=\"234\" srcset=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2016\/04\/2016-04-29-152106-350x234.jpg 350w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2016\/04\/2016-04-29-152106-263x175.jpg 263w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2016\/04\/2016-04-29-152106.jpg 395w\" sizes=\"(max-width: 350px) 100vw, 350px\">Since the issue, ULA engineers have been investigating the root cause of the booster\u2019s underperformance and provided a specific update on Friday.<\/p>\n<p>\u201cThe ULA engineering team has reviewed the data and has determined an anomaly with the RD-180 Mixture Ratio Control Valve (MRCV) assembly caused a reduction in fuel flow during the boost phase of the flight,\u201d noted the company, pointing to the assumed issue with the fuel ratio causing the early shutdown.<\/p>\n<p>\u201cIn addition to analysis and testing, all RD-180 engines are being inspected.\u201d<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-medium wp-image-44996\" src=\"\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2016\/04\/2016-04-29-152238-350x271.jpg\" alt=\"2016-04-29-152238\" width=\"350\" height=\"271\" srcset=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2016\/04\/2016-04-29-152238-350x271.jpg 350w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2016\/04\/2016-04-29-152238-451x350.jpg 451w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2016\/04\/2016-04-29-152238.jpg 543w\" sizes=\"(max-width: 350px) 100vw, 350px\">The latter reference is in relation to the upcoming Atlas V missions, with the next launch set to loft the latest&nbsp;US Navy Mobile User Objective System (MUOS) spacecraft.<\/p>\n<p>That mission remains without a confirmed launch target due to the investigation. The RD-180 hardware for the MUOS-5 launch is being inspected at the launch site, with the Atlas V inside SLC-41\u2019s&nbsp;Vertical Integration Facility (VIF).<\/p>\n<p>\u201cLast Friday, in preparation for the MUOS-5 launch, the Atlas V completed the Launch Vehicle on Stand (LVOS) operation, erecting the Atlas V into the Vertical Integration Facility at Cape Canaveral Air Force Station,\u201d added ULA.<\/p>\n<p>\u201cLVOS will allow configuration of the vehicle to support RD-180 engine inspections and confirm all engine components are ready for launch. The Atlas V MUOS-5 launch is targeted for early summer; a new launch date has not been secured on the Eastern Range. \u201d<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft\" src=\"\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2016\/04\/2016-04-14-224332-350x249.jpg\" alt=\"2016-04-14-224332\" width=\"350\" height=\"249\">While ULA prepares for the Delta IV- Heavy launch tasked with the lofting of the NROL-37 spacecraft&nbsp;\u2013 a mission that is not being impacted by the Atlas V investigation \u2013 the company is hopeful its manifest of Atlas V missions will remain relatively unhindered.<\/p>\n<p>\u201cThe impact to the remainder of the Atlas V manifest is in review with new launch dates being coordinated with our customers,\u201d ULA stated.<\/p>\n<p>\u201cAll missions manifested for 2016 are expected to be successfully executed by the end of the year, including OSIRIS-REx, which will remain in early September to support its critical science window.\u201d<\/p>\n<p>(Images via ULA, NASA, Lockheed Martin and Pratt &amp; Whitney)<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Despite successfully lofting the OA-6 Cygnus safely into orbit, United Launch Alliance (ULA) engineers have been investigating the first stage launch phase of the Atlas V\u2019s March mission. The Atlas V booster shutdown several seconds ahead of schedule due to what is now classed as a fault with&nbsp;RD-180 Mixture Ratio Control Valve (MRCV) assembly. Atlas [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":30181,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":"","_links_to":"","_links_to_target":""},"categories":[2],"tags":[7758,3537,3672,363],"class_list":["post-39075","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","tag-atlas-v","tag-muos","tag-oa-6","tag-ula"],"acf":[],"_links":{"self":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/39075"}],"collection":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/comments?post=39075"}],"version-history":[{"count":0,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/39075\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/media\/30181"}],"wp:attachment":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/media?parent=39075"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/categories?post=39075"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/tags?post=39075"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}