{"id":39113,"date":"2016-03-10T22:39:06","date_gmt":"2016-03-10T14:39:06","guid":{"rendered":"https:\/\/wp-productionenv-bjg9h2g2bgg5b8aa.southeastasia-01.azurewebsites.net\/news\/rs-25-veteran-conducts-static-fire-test-ahead-of-sls-launch\/"},"modified":"2016-03-10T22:39:06","modified_gmt":"2016-03-10T14:39:06","slug":"rs-25-veteran-conducts-static-fire-test-ahead-of-sls-launch","status":"publish","type":"post","link":"https:\/\/starpath.global\/news\/rs-25-veteran-conducts-static-fire-test-ahead-of-sls-launch\/","title":{"rendered":"RS-25 veteran conducts Static Fire test ahead of SLS launch"},"content":{"rendered":"<p>NASA and Aerojet Rocketdyne have conducted an opening test of the RS-25 rocket engine that will help power the Space Launch System (SLS) during launch. Engine 2059, a flight engine that helped launch five Space Shuttle missions, was test-fired on Thursday afternoon in the A-1 test stand at Stennis Space Center in Mississippi to continue qualifying a new engine controller design and to help calibrate the A-1 facility itself for future testing.\n<\/p>\n<p>RS-25 Test:<\/p>\n<p>Typically, hot-fire tests such as this are planned to start when the engine and the test team are ready, rather than planned for a specific time.<\/p>\n<p>As such there wasn\u2019t an ignition T-0 available until close to when the engine was ready to fire up. Ignition was marked at approximately 15:41 pm. Central time.<\/p>\n<h4 class=\"widget-title penci-border-arrow\">See Also<\/h4>\n<ul>\n<li>SLS Forum Section<\/li>\n<li>L2 RS-25 Section<\/li>\n<li>L2 SLS Section<\/li>\n<li>Click here to Join L2<\/li>\n<\/ul>\n<p>\u201cThe test will be in the early to mid-afternoon,\u201d said Steve Wofford, SLS Liquid Engines Office at Marshall Space Flight Center in Alabama, in an interview with NASASpaceflight.com.<\/p>\n<p>\u201cWe don\u2019t set a (specific) time for the test as it\u2019s more dictated by when propellant conditions are in the right state to be able to test the engines, so you do prep work all throughout the day and then when conditions are correct, you proceed with the test.\u201d<\/p>\n<p>The engine ran for 500 seconds during the test, which is a SLS flight duration. Ahead of the test, Mr. Wofford said that 323 of those seconds would be at the SLS power level of 109 percent.<\/p>\n<p><img fetchpriority=\"high\" decoding=\"async\" class=\"alignleft size-medium wp-image-44190\" src=\"\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2016\/03\/2016-03-10-145209-350x260.jpg\" alt=\"2016-03-10-145209\" width=\"350\" height=\"260\" srcset=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2016\/03\/2016-03-10-145209-350x260.jpg 350w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2016\/03\/2016-03-10-145209-470x350.jpg 470w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2016\/03\/2016-03-10-145209.jpg 520w\" sizes=\"(max-width: 350px) 100vw, 350px\">One of the objectives of Thursday\u2019s test is to help calibrate a post-Shuttle change made to the A-1 test stand.<\/p>\n<p>Aerospace industry analysis<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>Space Shuttle models<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>NASA educational resources<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>\n<p>     (adsbygoogle = window.adsbygoogle || []).push({});<\/p>\n<p>The A-1 facility was one of the stands at Stennis used to test RS-25 engines, formerly known as Space Shuttle Main Engines (SSME), during the Space Shuttle era. The last SSME test on the A-1 stand was in 2006, after which the stand was converted for use testing the J-2X engine for the Constellation program.<\/p>\n<p>Following those tests (and cancellation of the Constellation program), the stand was reconfigured to once again support RS-25 testing that began early last year, this time as a part of SLS development work.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-medium wp-image-44191\" src=\"\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2016\/03\/2016-03-10-145320-350x239.jpg\" alt=\"2016-03-10-145320\" width=\"350\" height=\"239\" srcset=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2016\/03\/2016-03-10-145320-350x239.jpg 350w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2016\/03\/2016-03-10-145320-513x350.jpg 513w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2016\/03\/2016-03-10-145320.jpg 563w\" sizes=\"(max-width: 350px) 100vw, 350px\">\u201cWe installed a new thrust measurement system on test stand A-1 following the end of the Shuttle program,\u201d Mr. Wofford explained, \u201cso we need to run a calibration test on a flight engine.<\/p>\n<p>\u201cWe\u2019ve got previous calibration data for this flight engine with the old thrust measurement system; we want to run another sample with this flight engine with the new thrust measurement system to see how those compare so that we can isolate that variable with that new change.\u201d<\/p>\n<p>While the design of the engine for the Space Shuttle has largely been retained, the operating environment between Shuttle and SLS does have significant differences.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft\" src=\"\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2016\/01\/2016-01-05-144949-350x228.jpg\" alt=\"2016-01-05-144949\" width=\"350\" height=\"228\">SLS will be flying with four RS-25 engines versus Shuttle\u2019s three and with more propellant, and last year\u2019s test firings verified that the engine handles the higher inlet pressures and lower inlet temperatures during SLS launches while running at a higher thrust level than Shuttle.<\/p>\n<p>\u201cThe inlet conditions are in a region that was previously outside of our test history, but we had model data that said that the engines could handle that,\u201d Mr. Wofford explains. \u201cSo we proved that out in the hot-fire test series last year and it doesn\u2019t bother the engine.<\/p>\n<p>\u201cThe engine gets in steady-state and you can run it at that power level at those inlet conditions and it doesn\u2019t bother the engine \u2013 the throttling is for vehicle driven needs.\u201d<\/p>\n<p>*Click here for more RS-25 News Articles*<\/p>\n<p>In addition to the calibration of the facility thrust measurement system for A-1, other objectives for this test include another test sample of the SLS inlet conditions and testing of a rebuilt high-pressure fuel turbopump.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-medium wp-image-44192\" src=\"\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2016\/03\/2016-03-10-150035-350x234.jpg\" alt=\"2016-03-10-150035\" width=\"350\" height=\"234\" srcset=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2016\/03\/2016-03-10-150035-350x234.jpg 350w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2016\/03\/2016-03-10-150035-524x350.jpg 524w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2016\/03\/2016-03-10-150035-768x513.jpg 768w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2016\/03\/2016-03-10-150035-585x390.jpg 585w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2016\/03\/2016-03-10-150035-263x175.jpg 263w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2016\/03\/2016-03-10-150035.jpg 845w\" sizes=\"(max-width: 350px) 100vw, 350px\">The engine used in this test, E2059, flew on five Space Shuttle missions; it first flew three times on Shuttle Orbiter Atlantis (STS-117, STS-122, and STS-125) and then on Orbiter Endeavour\u2019s last two flights (STS-130 and STS-134). It is currently assigned to fly installed in the second Core Stage on Exploration Mission-2 (EM-2), which is planned to be the first crewed SLS\/Orion flight.<\/p>\n<p>The primary hardware change from the SSME to the RS-25 is the new engine controller; the SSME controller hardware was judged to be both obsolete \u2013 parts were no longer available \u2013 and incompatible with the SLS power and data architectures.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft\" src=\"\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2010\/11\/A41.jpg\" alt=\"\" width=\"350\" height=\"199\">The new design was evolved from the controller that was in development for use with the J-2X engine; development to certify the controller for the RS-25 on SLS is still on-going, with engineering models being used to qualify the hardware and software for flight units that will follow.<\/p>\n<p>Hot-fire testing of RS-25 engines resumed last year, with a series of seven tests conducted using development engine E0525 on the A-1 stand between January and August, 2015.<\/p>\n<p>Among the objectives for last year\u2019s series, the tests explored the different engine inlet conditions between Shuttle and SLS, provided development run time for the new engine controller, and tested a variety of thrust profiles; Mr. Wofford called the completed test series both a success and a relief.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft\" src=\"\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2015\/08\/2015-08-27-205225-350x245.jpg\" alt=\"2015-08-27-205225\" width=\"350\" height=\"245\">\u201cThe results of the tests last year were extremely successful \u2013 I was really, really pleased with that test series,\u201d he said.<\/p>\n<p>\u201cWe threw some really tough thrust profiles at the engine \u2013 kind of unprecedented in their complexity \u2013 and all of our tests went full duration and all of our tests came off on time. And really and truly I think we got about 80 percent of the way there in terms of hardware confidence on being ready to fly with the test series last summer.<\/p>\n<p>\u201cNow we (still) need to\u2026get additional (test) samples and certification of our new ablative insulation and our development flight instrumentation, but in terms of hardware confidence, I breathed a lot easier following that test series last summer.\u201d<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-medium wp-image-44193\" src=\"\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2016\/03\/2016-03-10-150243-350x245.jpg\" alt=\"2016-03-10-150243\" width=\"350\" height=\"245\" srcset=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2016\/03\/2016-03-10-150243-350x245.jpg 350w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2016\/03\/2016-03-10-150243-500x350.jpg 500w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2016\/03\/2016-03-10-150243.jpg 529w\" sizes=\"(max-width: 350px) 100vw, 350px\">Thursday\u2019s test used an Engineering Model 5 controller; originally planned for late last year, it was decided to wait to do the hot-fire test until the EM5 controller was ready.<\/p>\n<p>\u201cEM5 was a little late coming off the production line due to some parts availability issues on getting it completed and we slipped this test until EM5 was ready,\u201d Mr. Wofford noted. \u201cSo it\u2019s ready to go \u2013 it\u2019s installed on the engine and that\u2019s what we\u2019re going to test.\u201d<\/p>\n<p>Mr. Wofford explained why they waited for the newer controller, noting it revolved around their certification planning and they had the time available to acquire it for use during testing.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-medium wp-image-44194\" src=\"\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2016\/03\/2016-03-10-150327-350x259.jpg\" alt=\"2016-03-10-150327\" width=\"350\" height=\"259\" srcset=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2016\/03\/2016-03-10-150327-350x259.jpg 350w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2016\/03\/2016-03-10-150327-473x350.jpg 473w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2016\/03\/2016-03-10-150327.jpg 584w\" sizes=\"(max-width: 350px) 100vw, 350px\">\u201cLast summer was all about development time for the controller system on a ground test engine. Part of our certification plan for the new control system was to also get hot-fire time on a flight engine and then hot-fire time on a different development engine.<\/p>\n<p>\u201cSo it\u2019s now time to get that hot-fire time for the new control system on a flight engine and this was a convenient window to accomplish that. This test wasn\u2019t critical path \u2013 we could do it at several different windows \u2013 but it was a convenient window to do it in.\u201d<\/p>\n<p>Test firings at Stennis are one part of overall development of the new engine controller, with Mr. Wofford noting there is a broader perspective in the development process.<\/p>\n<p>\u201cIn terms of the overall controller development, engine hot-fire time and demonstration is just a single facet of the way we develop and certify that system,\u201d he explained.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2015\/05\/2015-05-29-023304-350x240.jpg\" alt=\"\" width=\"350\" height=\"240\">\u201cSo in addition to hot-fire testing we do lots and lots of lab testing in the various \u2018hardware-in-the-loop\u2019 labs, we do something that we call design verification testing or DVT testing \u2013 and we\u2019re doing that right now. That\u2019s going on in the labs right now on one of our controller development units. Following that we do controller hardware qual (qualification) testing.<\/p>\n<p>\u201cThe DVT testing has been going on since October and DVT is where we really put the hardware through its paces in the lab with repeated thermal, vibration, and functional tests \u2013 it\u2019s really kind of a torture test \u2013 and the testing for DVT is far more severe than anything the hardware would see in flight.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2014\/07\/14-179_rs_25_installation_0-350x273.jpg\" alt=\"\" width=\"350\" height=\"273\">\u201cThe intention there is to shake out any problems ahead of controller qual tests. So think of DVT as risk-reduction testing leading into qual testing.\u201d<br \/>\nFollowing Thursday\u2019s test, another series of development hot-fire tests will be conducted using the other development engine, E0528. A series of five tests are planned to start in the July time-frame.<\/p>\n<p>Mr. Wofford said that the EM5 controller is the last planned development version, with flight boxes being the next units to be produced.<\/p>\n<p>One of the objectives of the next test series is to \u201cgreen run\u201d three of the four controllers that will fly with the first Core Stage on the EM-1 flight currently planned for late 2018.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft\" src=\"\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2016\/01\/2016-01-27-133641-350x258.jpg\" alt=\"2016-01-27-133641\" width=\"350\" height=\"258\">The first two tests of the next series will use EM5 units installed on E0528; the last three hot-fire tests will use different flight units installed on the engine. The fourth flight unit controller will get its green run during the full Core Stage test on the B-2 stand at Stennis, currently planned for late 2017.<\/p>\n<p>After the E0528 test series, one \u201cgreen run\u201d test each of newly assembled flight engines (E2063 and E2062) is planned in the late-Fall \/ early Winter time-frame.<\/p>\n<p>One of those tests was earlier scheduled in between Thursday\u2019s test and the E0528 test series. However, Mr. Wofford said that they are not in the critical path of development and both were moved to the other side of the E0528 tests.<\/p>\n<p>(Images:&nbsp;Via NASA and L2 \u2013 including photos from Philip Sloss and SLS renders from L2 artist Nathan Koga \u2013 The full gallery of Nathan\u2019s (SpaceX Dragon to MCT, SLS, Commercial Crew and more) L2 images can be *found here*)<\/p>\n<p>(To join L2, click here:&nbsp;\/\/www.nasaspaceflight.com\/l2\/)<\/p>\n","protected":false},"excerpt":{"rendered":"<p>NASA and Aerojet Rocketdyne have conducted an opening test of the RS-25 rocket engine that will help power the Space Launch System (SLS) during launch. Engine 2059, a flight engine that helped launch five Space Shuttle missions, was test-fired on Thursday afternoon in the A-1 test stand at Stennis Space Center in Mississippi to continue [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":"","_links_to":"","_links_to_target":""},"categories":[2],"tags":[2363,624,8116,8091],"class_list":["post-39113","post","type-post","status-publish","format-standard","hentry","category-news","tag-rs-25","tag-sls","tag-ssme","tag-stennis"],"acf":[],"_links":{"self":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/39113"}],"collection":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/comments?post=39113"}],"version-history":[{"count":0,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/39113\/revisions"}],"wp:attachment":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/media?parent=39113"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/categories?post=39113"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/tags?post=39113"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}