{"id":39130,"date":"2016-02-15T23:48:58","date_gmt":"2016-02-15T15:48:58","guid":{"rendered":"https:\/\/wp-productionenv-bjg9h2g2bgg5b8aa.southeastasia-01.azurewebsites.net\/news\/nasa-moves-to-enforce-early-switch-to-eus-for-sls\/"},"modified":"2016-02-15T23:48:58","modified_gmt":"2016-02-15T15:48:58","slug":"nasa-moves-to-enforce-early-switch-to-eus-for-sls","status":"publish","type":"post","link":"https:\/\/starpath.global\/news\/nasa-moves-to-enforce-early-switch-to-eus-for-sls\/","title":{"rendered":"NASA moves to enforce early switch to EUS for SLS"},"content":{"rendered":"<p>NASA managers have placed a \u201cstop work order\u201d in relation to the human-rating of the Interim Cryogenic Propulsion Stage (lCPS) for the Space Launch System (SLS). The stage, which was set to ride with a crewed flight on Exploration Mission -2 (EM-2), will be replaced by the early addition of the more powerful Exploration Upper Stage, although NASA recently claimed the proposed FY 2017 funding cuts to SLS place its implementation schedule in doubt.<\/p>\n<p>SLS Trying To Find A Path:<\/p>\n<p>The Space Launch System continues to enjoy a relatively smooth developmental path, especially when compared to its predecessor Constellation Program (CxP).<\/p>\n<p>Schedule slips and technical issues continually plagued the Ares-based architecture, although engineers cite funding issues were also a major impact on their efforts.<\/p>\n<p><img fetchpriority=\"high\" decoding=\"async\" class=\"alignleft size-medium wp-image-43846\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2016\/02\/2016-02-15-165801-350x249.jpg\" alt=\"2016-02-15-165801\" width=\"350\" height=\"249\" srcset=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2016\/02\/2016-02-15-165801-350x249.jpg 350w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2016\/02\/2016-02-15-165801.jpg 400w\" sizes=\"(max-width: 350px) 100vw, 350px\">The early plan for the Constellation Program involved a Moon First approach, a stepping stone to Mars on the \u201cVision for Space Exploration\u201d (VSE) path.<\/p>\n<p>The VSE\u2019s \u201cMoon, Mars and Beyond\u201d manifest \u2013 produced in 2006 (available in L2) \u2013 showed the program that would have already been deep into providing crew rotation mission to the International Space Station (ISS) by 2016 \u2013 three years away from a return of crewed missions to the surface of the Moon \u2013 via the combination of Ares I, Orion, Ares V and the Altair lunar lander.<\/p>\n<p>As per most rocket development schedules, slips to early manifest plans are almost a certainty \u2013 as eventually realized via the aforementioned CxP issues in the years that followed the 2006 plan.<\/p>\n<p>SLS has suffered far less by way of schedule slips. The very early political will was to debut the monster rocket in 2016, prior to solidifying to a 2017 target. EM-1 is currently expected to take place in 2018, a slip that is far less dramatic when compared to CxP\u2019s woes.<\/p>\n<h4 class=\"widget-title penci-border-arrow\">See Also<\/h4>\n<ul>\n<li>SLS Forum Section<\/li>\n<li>     (adsbygoogle = window.adsbygoogle <\/li>\n<li>L2 SLS Section<\/li>\n<li>Click here to Join L2<\/li>\n<\/ul>\n<p>The main issue for SLS is her lack of missions. The early CxP plan had a wide range of flights on its planned schedule, whereas SLS lacks any real definition past the soundbites and hashtags provided by NASA.<\/p>\n<p>This has also led to concerns about the rocket\u2019s flight rate, in part due to the lack of confirmed payloads that are yet to make it past the paperwork stage of Design Reference Missions (DRMs).<\/p>\n<p>One element of the rocket that may boost SLS\u2019 range of missions is the powerful Exploration Upper Stage (EUS).<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-medium wp-image-43853\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2016\/02\/2016-02-15-221911-350x257.jpg\" alt=\"2016-02-15-221911\" width=\"350\" height=\"257\" srcset=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2016\/02\/2016-02-15-221911-350x257.jpg 350w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2016\/02\/2016-02-15-221911-477x350.jpg 477w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2016\/02\/2016-02-15-221911.jpg 482w\" sizes=\"(max-width: 350px) 100vw, 350px\">The initial plan was to switch to this new upper stage after the crewed EM-2 mission. However, as previously reported by this site, NASA wishes to advance this plan.<\/p>\n<p>The debut of SLS will be known as the \u201cBlock 1\u201d, sporting a&nbsp;Delta Cryogenic Second Stage (DCSS), renamed the Interim Cryogenic Propulsion System (ICPS) for SLS.<\/p>\n<p>As noted in numerous meetings \u2013 not least by NASA\u2019s Aerospace Safety Advisory Panel (ASAP) \u2013 it would cost around $150m to \u201chuman rate\u201d this stage ahead of EM-2, a cost that would be associated with just the single use of the stage ahead of moving to the EUS.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-medium wp-image-43852\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2016\/02\/2016-02-15-221200-350x246.jpg\" alt=\"2016-02-15-221200\" width=\"350\" height=\"246\" srcset=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2016\/02\/2016-02-15-221200-350x246.jpg 350w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2016\/02\/2016-02-15-221200-498x350.jpg 498w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2016\/02\/2016-02-15-221200.jpg 579w\" sizes=\"(max-width: 350px) 100vw, 350px\">The switch to EUS after the first test flight of SLS would allow for the rocket to enter its workhorse configuration that will be capable of a full mission range envisioned throughout the 2020s.<\/p>\n<p>According to NASA documentation acquired by L2, NASA is eyeing the immediate push to the workhorse Block 1B configuration after EM-1, \u201ca configuration that allows for the use of the Universal Stage Adapter (USA) capable of co-manifesting up to 10 metric tons of payload along with the Orion vehicle on a trans-lunar trajectory.\u201d<\/p>\n<p>The SLS program completed the Systems Requirements Review (SRR) for the EUS in January 2015, which sets forth the Point Of Departure (POD) of the Block 1B configuration to be used starting with EM-2.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2014\/06\/Z31.jpg\" alt=\"Z3\" width=\"350\" height=\"246\">Per the EUS POD, the definition calls for the stage to untilize four RL-1OC-3 engines (EUSEs).<\/p>\n<p>The documentation was released internally throughout the SLS Program to call for a stop order on all work associated with the ICPS after EM-1.<\/p>\n<p>\u201cThe Deputy Associate Administrator (DAA) for Exploration Systems Development (ESD) directs the<br \/>\nfollowing to all ESD programs and offices: The ESD architecture baseline is changed to implement a human-rated Block 1B crewed configuration of SLS starting with the EM-2 launch.<\/p>\n<p>\u201cWork will continue as planned using SLS Block 1 (with ICPS) for the uncrewed EM-1 flight. Any work associated with human-rating ICPS and using SLS Block 1 with ICPS beyond EM-1 will be stopped. The effort to prepare ICPS for EM-1, and any work to date associated with human rating ICPS, is valuable and will be archived per Agency policy.\u201d<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-medium wp-image-43851\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2016\/02\/2016-02-15-215756-350x307.jpg\" alt=\"2016-02-15-215756\" width=\"350\" height=\"307\" srcset=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2016\/02\/2016-02-15-215756-350x307.jpg 350w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2016\/02\/2016-02-15-215756-399x350.jpg 399w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2016\/02\/2016-02-15-215756.jpg 486w\" sizes=\"(max-width: 350px) 100vw, 350px\">Moving to the EUS for the second flight of the SLS will involve additional challenges, such as large changes to the top of the SLS Mobile Launcher, which will need to cater for the larger EUS in the SLS stack.<\/p>\n<p>\u201cWith this change, there will be some interface differences between SLS Block 1B and Orion that will<br \/>\ncontinue to be worked through normal enterprise integration processes,\u201d added the documentation.<\/p>\n<p>\u201cGSDO (Ground Systems Development and Operations) will be required to make substantial infrastructure and interface updates to accommodate Block 1B requirements; these updates to GSDO are not backwards-compatible to Block 1.\u201d<\/p>\n<p>One potential problem to NASA\u2019s plan was the recent announcement of the&nbsp;NASA FY 2017 Budget Request, which removed a huge amount of funding from SLS and Orion.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2015\/06\/2015-06-30-132927-350x245.jpg\" alt=\"2015-06-30-132927\" width=\"350\" height=\"245\">The EUS recieved a specific reference from&nbsp;NASA Chief Financial Officer David Radzanowski in comments made to the media after the announcement, citing that the reduced funding could impact on implementing the EUS on the second flight of SLS.<\/p>\n<p>However, as is usual, SLS\u2019 political allies in Congress are likely to return a large amount of funding to SLS and Orion\u2019s budget lines, removing the concern of EUS\u2019 early installation.<\/p>\n<p>As such, NASA will press on with its plan to implement EUS into the second flight of SLS, with a forward plan already outlined.<\/p>\n<p>\u201cESD will update the Level 1 Requirements, Concept of Operations (ConOps), Integrated Design&nbsp;Definition Document (IDDD), Flight Test, and any other necessary documentation to reflect the above,&nbsp;which will flow to program baselines,\u201d added the documentation associated with the ICPS stop work order.<\/p>\n<p>\u201cPrograms will immediately implement any necessary planning and&nbsp;effort in accordance with this decision memo.\u201d<\/p>\n<p>Images: NASA and L2 \u2013 including renders from L2 artist Nathan Koga \u2013 The full gallery of Nathan\u2019s (SpaceX Dragon to MCT, SLS, Commercial Crew and more) L2 images can be *found here*)<\/p>\n<p>(To join L2, click here:&nbsp;http:\/\/www.nasaspaceflight.com\/l2\/)<\/p>\n","protected":false},"excerpt":{"rendered":"<p>NASA managers have placed a \u201cstop work order\u201d in relation to the human-rating of the Interim Cryogenic Propulsion Stage (lCPS) for the Space Launch System (SLS). The stage, which was set to ride with a crewed flight on Exploration Mission -2 (EM-2), will be replaced by the early addition of the more powerful Exploration Upper [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":30080,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":"","_links_to":"","_links_to_target":""},"categories":[2],"tags":[4011,8075,640,624],"class_list":["post-39130","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","tag-em-2","tag-eus","tag-orion","tag-sls"],"acf":[],"_links":{"self":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/39130"}],"collection":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/comments?post=39130"}],"version-history":[{"count":0,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/39130\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/media\/30080"}],"wp:attachment":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/media?parent=39130"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/categories?post=39130"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/tags?post=39130"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}