{"id":39312,"date":"2015-06-16T23:38:54","date_gmt":"2015-06-16T15:38:54","guid":{"rendered":"https:\/\/wp-productionenv-bjg9h2g2bgg5b8aa.southeastasia-01.azurewebsites.net\/news\/available-to-rent-one-vab-high-bay-three-mobile-launcher-platforms\/"},"modified":"2015-06-16T23:38:54","modified_gmt":"2015-06-16T15:38:54","slug":"available-to-rent-one-vab-high-bay-three-mobile-launcher-platforms","status":"publish","type":"post","link":"https:\/\/starpath.global\/news\/available-to-rent-one-vab-high-bay-three-mobile-launcher-platforms\/","title":{"rendered":"Available to Rent: One VAB High Bay, three Mobile Launcher Platforms"},"content":{"rendered":"<p>The Kennedy Space Center (KSC) is continuing its drive to attract new commercial partners by offering the use of a High Bay inside the famous Vehicle Assembly Building (VAB). Also on offer \u2013 via an announcement for proposals (AFP) under KSC\u2019s multi-user spaceport brief \u2013 are the three former Shuttle Mobile Launch Platforms (MLPs).<\/p>\n<p>Multi-User KSC:<\/p>\n<p>The Kennedy Space Center is undergoing a major top-to-tail transformation.<\/p>\n<p>Moving away from its esteemed role with the Space Shuttle Program, the iconic Florida base is now deep into its transition to re-emerge as a 21st Century spaceport.<\/p>\n<p><img fetchpriority=\"high\" decoding=\"async\" class=\"alignleft size-medium wp-image-40551\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2015\/06\/2015-06-16-171324-350x255.jpg\" alt=\"2015-06-16-171324\" width=\"350\" height=\"255\" srcset=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2015\/06\/2015-06-16-171324-350x255.jpg 350w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2015\/06\/2015-06-16-171324-480x350.jpg 480w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2015\/06\/2015-06-16-171324.jpg 568w\" sizes=\"(max-width: 350px) 100vw, 350px\">Work has ranged from the mundane task of upgrading the sewage systems, through the dramatic changes to the center\u2019s skyline, with both launch pads preparing to host new rockets.<\/p>\n<p>Pad 39A will soon welcome SpaceX\u2019s Falcon Heavy rocket, breaking KSC\u2019s ties with government owned rockets.<\/p>\n<p>Work to convert 39A into a SpaceX launch pad has seen the construction of a new&nbsp;Horizontal Integration Facility (HIF), while construction is continuing on the pad\u2019s ramp and launch mount area.<\/p>\n<p>Pad 39B has already been converted in readiness to host the Space Launch System (SLS). However, its \u201cClean Pad\u201d infrastructure is designed to enable other rockets to launch from its coastline base. It will also include a mini pad area within its perimeter, aimed at small class launchers.<\/p>\n<p>While SpaceX won\u2019t be utilizing the VAB, SLS \u2013 and the aforementioned small launchers \u2013 will be integrated within the cavernous surroundings of the&nbsp;iconic building.<\/p>\n<p>NASA educational resources<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>Space Shuttle<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>Rocket building kits<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>\n<p>     (adsbygoogle = window.adsbygoogle || []).push({});<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-medium wp-image-40556\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2015\/06\/2015-06-16-232028-350x265.jpg\" alt=\"2015-06-16-232028\" width=\"350\" height=\"265\" srcset=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2015\/06\/2015-06-16-232028-350x265.jpg 350w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2015\/06\/2015-06-16-232028-462x350.jpg 462w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2015\/06\/2015-06-16-232028.jpg 516w\" sizes=\"(max-width: 350px) 100vw, 350px\">The launch vehicle integration facility was built in 1965 to support assembly of Apollo\/Saturn vehicles&nbsp;and modified to support the Space Shuttle Program. The VAB features four High Bays, each with approximately 27,435 square feet of floor space and an internal height of 456 feet.<\/p>\n<p>Although SLS will utilize the transfer aisle and one High Bay, the VAB\u2019s available capacity \u201cexceeds planned NASA usage.<\/p>\n<p>\u201cTherefore the Agency has determined that VAB High Bay 2 (HB2) is available for use by a commercial company or consortium, or other US domestic entity, including state agencies, to provide commercial space launch services as defined by the Commercial Space Launch Act,\u201d as announced by NASA this week.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-medium wp-image-40552\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2015\/06\/2015-06-16-231100-350x241.jpg\" alt=\"2015-06-16-231100\" width=\"350\" height=\"241\" srcset=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2015\/06\/2015-06-16-231100-350x241.jpg 350w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2015\/06\/2015-06-16-231100.jpg 486w\" sizes=\"(max-width: 350px) 100vw, 350px\">VAB HB2 \u2013 located on the west side of the facility \u2013 holds potential as a launch vehicle processing, integration, and testing bay for commercial space operations. HB2 has historically been used for storage, vertical integration, and stacking of spacecraft.<\/p>\n<p>A commercial space launch company could use HB2 in support of its space launch services while assuming financial and technical responsibility for operations and maintenance (O&amp;M), thus reducing some of the costs for NASA.<\/p>\n<p>\u201cMaking unique capabilities like the VAB available to commercial companies is yet another step in our evolution to a diverse spaceport that supports government and commercial partners,\u201d added Scott Colloredo, director of Center Planning and Development at KSC.<\/p>\n<h4 class=\"widget-title penci-border-arrow\">See Also<\/h4>\n<ul>\n<li>Commercial Forum Section<\/li>\n<li>L2 Future Vehicles Section<\/li>\n<li>L2 SLS Section<\/li>\n<li>Click here to Join L2<\/li>\n<\/ul>\n<p>\u201cThe Space Launch System relies on the VAB for assembly and integration, but High Bay 2 will be available in 2016 for commercial users, and we want to fully explore who might have a need for a massive integration facility at Launch Complex 39.\u201d<\/p>\n<p>NASA notes the availability of HB2 to an interested party is estimated to be June 2016.<\/p>\n<p>Studies into the use of the VAB HBs in tandem with SLS launch campaigns have been conducted over the years.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft\" title=\"Atlas V at KSC, via L2\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2012\/09\/Z76.jpg\" alt=\"Atlas V at KSC, via L2\" width=\"349\" height=\"266\">Notes and graphics from the studies were acquired by L2 (LINK), showing an integration path involving an Atlas V being stacked inside the Vehicle Assembly Building (VAB), atop of a former Shuttle MLP, prior to being rolled out to Complex 39.<\/p>\n<p>Such dual flows inside the VAB are aimed at allowing both a commercial vehicle and the SLS to be processing at the same time. Work to&nbsp;remove and replace platforms that were dedicated to the Shuttle stack&nbsp;is now almost complete.<\/p>\n<p>The Kennedy Space Center\u2019s Ground Systems Development and Operations (GSDO) program had also noted they expected to transition its three MLPs.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-medium wp-image-40553\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2015\/06\/2015-06-16-231136-350x252.jpg\" alt=\"2015-06-16-231136\" width=\"350\" height=\"252\" srcset=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2015\/06\/2015-06-16-231136-350x252.jpg 350w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2015\/06\/2015-06-16-231136-487x350.jpg 487w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2015\/06\/2015-06-16-231136.jpg 502w\" sizes=\"(max-width: 350px) 100vw, 350px\">Previous plans showed MLP-1 was set to retire, MLP-2 was to be dedicated to a liquid fueled vehicle \u2013 such as Atlas V, while MLP-3 could be used by a Solid Rocket Motor vehicle \u2013&nbsp;such as the Liberty rocket.<\/p>\n<p>Since those plans were created, Atlas V\u2019s days have since been numbered, as the United Launch Alliance (ULA) focus on switching to its Vulcan rocket, while the Liberty rocket \u2013 which originally planned to use the Ares I Mobile Launcher before that transitioned into the ownership of SLS \u2013 has been shelved.<\/p>\n<p>This has resulted in all three MLPs being offered to potential customers, with alterations to the hardware to be made after they are acquired.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-medium wp-image-40554\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2015\/06\/2015-06-16-231354-350x261.jpg\" alt=\"2015-06-16-231354\" width=\"350\" height=\"261\" srcset=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2015\/06\/2015-06-16-231354-350x261.jpg 350w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2015\/06\/2015-06-16-231354-470x350.jpg 470w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2015\/06\/2015-06-16-231354.jpg 544w\" sizes=\"(max-width: 350px) 100vw, 350px\">\u201cNASA has determined that three MLPs are available as secondary assets under this AFP for use by a commercial company or consortium, or other US domestic entity, including state agencies, to provide commercial space launch services as defined by the Commercial Space Launch Act,\u201d added the AFP outline.<\/p>\n<p>\u201cThe MLPs were used to stack, transport, and launch the Space Shuttle. They are available as an option to Proposers (i.e., proposers do not have to request an MLP to propose for VAB HB2). Proposers may include a request for one, two, or three MLP(s) in their response. Proposers may also request an MLP or MLPs without proposing for VAB HB2.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-medium wp-image-40555\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2015\/06\/2015-06-16-231553-350x267.jpg\" alt=\"2015-06-16-231553\" width=\"350\" height=\"267\" srcset=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2015\/06\/2015-06-16-231553-350x267.jpg 350w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2015\/06\/2015-06-16-231553-459x350.jpg 459w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2015\/06\/2015-06-16-231553.jpg 550w\" sizes=\"(max-width: 350px) 100vw, 350px\">\u201cThese assets are being provided to proposers in an \u2018as is\u2019 condition.\u201d<\/p>\n<p>A large 77 page outline noted some interesting caveats for interested parties, adding \u201cNASA will not consider proposals for non-aerospace use of the VAB or MLPs or those that do not otherwise contribute to enabling the commercial use of space.\u201d<\/p>\n<p>NASA had previously allowed the Michoud Assembly Facility (MAF) to be used by outside interests, resulting in oil companies and even Hollywood film productions taking up space in the former External Tank production facility.<\/p>\n<p>NASA also expect to be paid (or reimbursed out of any subsequent contract) over six million dollars over five years from a suitor in \u201crates\u201d, covering power, utility and associated maintenance costs.<\/p>\n<p>It is not known if any companies have expressed any recent interest in the High Bay or MLP options. Any interested parties must submit their interest to NASA by the end of July.<\/p>\n<p>(Images: via L2 Sections. Other images via NASA)<\/p>\n<p>(Click here:&nbsp;http:\/\/www.nasaspaceflight.com\/l2\/&nbsp;\u2013 to view how you can support NSF\u2019s running costs and access the best space flight content on the entire internet).<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The Kennedy Space Center (KSC) is continuing its drive to attract new commercial partners by offering the use of a High Bay inside the famous Vehicle Assembly Building (VAB). Also on offer \u2013 via an announcement for proposals (AFP) under KSC\u2019s multi-user spaceport brief \u2013 are the three former Shuttle Mobile Launch Platforms (MLPs). Multi-User [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":30133,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":"","_links_to":"","_links_to_target":""},"categories":[2],"tags":[7766,9024,1701],"class_list":["post-39312","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","tag-ksc","tag-mlp","tag-vab"],"acf":[],"_links":{"self":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/39312"}],"collection":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/comments?post=39312"}],"version-history":[{"count":0,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/39312\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/media\/30133"}],"wp:attachment":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/media?parent=39312"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/categories?post=39312"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/tags?post=39312"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}