{"id":39377,"date":"2015-03-23T20:08:01","date_gmt":"2015-03-23T12:08:01","guid":{"rendered":"https:\/\/wp-productionenv-bjg9h2g2bgg5b8aa.southeastasia-01.azurewebsites.net\/news\/nasa-agrees-to-aid-dream-chaser-development-to-cdr-level\/"},"modified":"2015-03-23T20:08:01","modified_gmt":"2015-03-23T12:08:01","slug":"nasa-agrees-to-aid-dream-chaser-development-to-cdr-level","status":"publish","type":"post","link":"https:\/\/starpath.global\/news\/nasa-agrees-to-aid-dream-chaser-development-to-cdr-level\/","title":{"rendered":"NASA agrees to aid Dream Chaser development to CDR level"},"content":{"rendered":"<p>As was promised, NASA is not abandoning&nbsp;Sierra Nevada Corporation (SNC) and its Dream Chaser vehicle, despite the spaceplane losing out on the lucrative&nbsp;Commercial Crew Transportation Capability (CCtCap) award last year. An agreement has been was reached for SNC to continue to work with NASA through to the Critical Design Review (CDR) level of maturity for the vehicle.<\/p>\n<p>Dream Chaser:<\/p>\n<p>With a&nbsp;heritage ranging back to NASA Langley\u2019s HL-20 spaceplane concept from the 1980s, Dream Chaser is a vehicle that can utilize cross-range capability and land on a conventional runway.<\/p>\n<p><img fetchpriority=\"high\" decoding=\"async\" class=\"alignleft\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2012\/09\/Z35.jpg\" alt=\"\" width=\"350\" height=\"228\">That \u201cdissimilar redundancy\u201d \u2013 when compared to her capsule rivals \u2013 won its fair share of admirers, with many experts believing the spaceplane and SpaceX\u2019s Dragon 2 were the most likely duo to win through to the CCtCAP stage of NASA funding.<\/p>\n<p>However, the $6.8 billion award to SpaceX and Boeing saw Dream Chaser missing out, resulting in layoffs at SNC and a bleak future for the vehicle.<\/p>\n<p>Although a protest against the CCtCAP decision was lodged and subsequently&nbsp;thrown out, SNC continued to promote the vehicle for other uses.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft  wp-image-39711\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2015\/03\/2015-03-24-00_34_22-CRS-2_-Dream-Chaser-Cargo-System.jpg\" alt=\"2015-03-24 00_34_22-CRS-2_ Dream Chaser Cargo System\" width=\"349\" height=\"281\">While numerous associations with overseas space agencies and commercial partners continue to be evaluated, SNC has since officially announced their cargo variant of the Dream Chaser for NASA\u2019s CRS2 bid process.<\/p>\n<p>CRS2 will be the follow-on to the current Commercial Resupply Services (CRS) contract that involves&nbsp;SpaceX\u2019s cargo Dragon spacecraft and Orbital\u2019s Cygnus vehicle.<\/p>\n<p>SNC revealed a Dream Chaser Cargo System that has a folded wing design to fit inside a standard fairing for multiple launch vehicles.<\/p>\n<p>SNC continues to work with NASA via the final&nbsp;Commercial Crew Integrated Capability (CCiCap) milestones, although it was uncertain as to how long that work would continue.<\/p>\n<h4 class=\"widget-title penci-border-arrow\">See Also<\/h4>\n<ul>\n<li>     (adsbygoogle = window.adsbygoogle <\/li>\n<li>Commercial Crew Section<\/li>\n<li>L2 Dream Chaser<\/li>\n<li>Click here to Join L2<\/li>\n<\/ul>\n<p>Ahead of the CCtCAP award, NASA promised it wouldn\u2019t \u201cabandon\u201d the company that was to miss out on the CCtCAP award. Per Monday\u2019s announcement, that promise appears to have been kept.<\/p>\n<p>The agreement points to an amendment to its current Space Act Agreement (SAA) arrangement, adding a \u201csignificant development milestone\u201d to the CCiCap partnership with NASA.<\/p>\n<p>The continuation of the partnership will see the association with NASA extended through to March 2016 \u2013 via the addition of Milestone 41, specifically titled \u201cDesign Analysis Cycle-6 Closeout Review\u201d.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2014\/01\/Z113.jpg\" alt=\"Z11\" width=\"345\" height=\"216\">This additional milestone will allow SNC to demonstrate the advancement of the Dream Chaser Space System design from a Preliminary Design Review (PDR) level of maturity toward a Critical Design Review (CDR) level.<\/p>\n<p>While there isn\u2019t any additional funding from this new agreement, SNC notes it is pleased they will have the support of NASA through to next year \u2013 in turn aiding the vehicle\u2019s maturity as they compete for the CRS2 award.<\/p>\n<p>\u201cWe are eager to continue our work with NASA on development of the Dream Chaser Space System and appreciate NASA\u2019s continued support of our program,\u201d noted Mark N. Sirangelo, corporate vice president, SNC\u2019s Space Systems.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2013\/12\/Z73.jpg\" alt=\"Z7\" width=\"349\" height=\"207\">\u201cAgreeing to extend the SAA is recognition by NASA of the unique value of the Dream Chaser lifting-body vehicle. As the only runway-landing, piloted space vehicle in development, Dream Chaser provides the opportunity to preserve the U.S. legacy of 30 years of space shuttle and lifting-body experience.<\/p>\n<p>\u201cThe continued agreement and addition of the Closeout Review milestone ensures the entire Dream Chaser Space System continues its path forward to CDR maturation.\u201d<\/p>\n<p>The agreement may also result in confirmation SNC will send the Dream Chaser Engineering Test Article (ETA) on a second trip to California for another free flight test.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2013\/10\/Z76.jpg\" alt=\"Z7\" width=\"348\" height=\"222\">While the first flight test, conducted in 2013, is still best known for the landing gear failure, it was ultimately a hugely successful test, proving the vehicle could fly, and fly well \u2013 something that could only be confirmed via a full-scale flight.<\/p>\n<p>While the ETA has undergone repairs following her Californian tumble, there were fears SNC wouldn\u2019t be able to financially justify a second free flight test after losing out on the CCtCAP funding.<\/p>\n<p>The second test is still technically an objective of the CCiCAP process, although most of the free flight data was successfully gathered during the initial test, achieving a green light on the NASA milestone checklist.<\/p>\n<p>Fully completing all of the CCiCAP objectives, in addition to the newly installed&nbsp;Design Analysis Cycle-6 Closeout Review milestone, would place SNC in a good position not only with NASA for the CRS2 considerations, but also with the numerous partners they are continuing to work with.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2014\/11\/2014-11-26-13_02_00-Stratolaunch-with-Orbital-LV-HD-Video-AND-additional-information-350x231.jpg\" alt=\"2014-11-26 13_02_00-Stratolaunch with Orbital LV HD Video AND additional information\" width=\"350\" height=\"231\">SNC are still working reviews with the Stratolaunch Systems team for a subscale version of the Dream Chaser that could fly missions from the giant aircraft carrier system.<\/p>\n<p>Such an arrangement would result in a good amount of synergy between the two companies, utilizing a runway &nbsp;\u2013 such as the Shuttle Landing Facility (SLF) at the Kennedy Space Center (KSC), for both the start and conclusion of missions.<\/p>\n<p>An agreement to land all versions of the Dream Chaser at Ellington Airport near Houston was also revealed this week.<\/p>\n<p>SNC also recently announced it has completed an initial study for the Dream Chaser for European Utilization (DC4EU) concept, co-funded by the Space Administration of the German Aerospace Center (DLR) and OHB.<\/p>\n<p>What is now certain is Dream Chaser will at least live on into 2016.<\/p>\n<p>(Images: L2 Content, SNC and NASA)<\/p>\n<p>(Click here:&nbsp;http:\/\/www.nasaspaceflight.com\/l2\/&nbsp;\u2013 to view how you can access the best space flight content on the entire internet and directly support NASASpaceflight.com.)<\/p>\n","protected":false},"excerpt":{"rendered":"<p>As was promised, NASA is not abandoning&nbsp;Sierra Nevada Corporation (SNC) and its Dream Chaser vehicle, despite the spaceplane losing out on the lucrative&nbsp;Commercial Crew Transportation Capability (CCtCap) award last year. An agreement has been was reached for SNC to continue to work with NASA through to the Critical Design Review (CDR) level of maturity for [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":29995,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":"","_links_to":"","_links_to_target":""},"categories":[2],"tags":[4055,970],"class_list":["post-39377","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","tag-ccicap","tag-dream-chaser"],"acf":[],"_links":{"self":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/39377"}],"collection":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/comments?post=39377"}],"version-history":[{"count":0,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/39377\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/media\/29995"}],"wp:attachment":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/media?parent=39377"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/categories?post=39377"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/tags?post=39377"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}