{"id":39396,"date":"2015-02-23T23:19:13","date_gmt":"2015-02-23T15:19:13","guid":{"rendered":"https:\/\/wp-productionenv-bjg9h2g2bgg5b8aa.southeastasia-01.azurewebsites.net\/news\/super-crawler-ct-2-test-run-marks-50th-anniversary\/"},"modified":"2015-02-23T23:19:13","modified_gmt":"2015-02-23T15:19:13","slug":"super-crawler-ct-2-test-run-marks-50th-anniversary","status":"publish","type":"post","link":"https:\/\/starpath.global\/news\/super-crawler-ct-2-test-run-marks-50th-anniversary\/","title":{"rendered":"Super Crawler CT-2 test run marks 50th anniversary"},"content":{"rendered":"<p>NASA\u2019s Crawler Transporter -2 (CT-2) is continuing to enjoy its first outing in over a year, as its roll to Pad 39B tests its latest modifications ahead of an active role with the Space Launch System (SLS). Its trip at the pad began last week, but was staggered to mark the 50th anniversary of the famous crawlers on Monday, both of which are being re-purposed for SLS, following their previous roles with the Saturn rocket and the Space Shuttle.<\/p>\n<p>Crawler Transports \u2013 The New Era:<\/p>\n<p>The CTs have been part of the space program since the the 1960s, with&nbsp;fabrication of the behemoth machine\u2019s parts initiated in 1963 at their birth site in Ohio.<\/p>\n<p>Contractor Marion completed 90 percent of the design and began to ship parts of the vehicle in March 1964. This allowed assembly of the first CT at Merritt Island, which was completed in November of that year.<\/p>\n<p>Live testing began in 1965, with the first Crawler put through its paces that summer, moving the Launch Umbilical Tower (LUT) one mile along two short stretches of road to test how the CT would perform on different surfaces. As a result, this week marks the 50th anniversary of the CTs.<\/p>\n<p><img fetchpriority=\"high\" decoding=\"async\" class=\"alignleft\" title=\"Z6\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2012\/11\/Z69.jpg\" alt=\"\" width=\"350\" height=\"222\">The first Saturn&nbsp;V rocket transported to the pad&nbsp;by the CT was the \u201cFacilities Checkout Vehicle\u201d AS-500F, ahead of the unmanned Apollo 4 mission, with the CT transporting the Saturn Vs for all of the Moon missions.<\/p>\n<p>The final Saturn to be transported to Complex 39 was the Saturn IB for the ASTP mission in 1975, ahead of the transition towards the Space Shuttle Program (SSP).<\/p>\n<p>Now the CTs would find themselves transporting the Mobile Launch Platform (MLP) \u2013 complete with the Shuttle orbiter, &nbsp;her External Tank and Solid Rocket Boosters (SRBs)&nbsp;\u2013 to the pads.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft\" title=\"Z5\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2012\/11\/Z512.jpg\" alt=\"\" width=\"348\" height=\"246\">The CT opened its&nbsp;Shuttle career by rolling Enterprise to launch pad 39A on 1 May 1979 for testing.<\/p>\n<p>SpaceX launch tickets<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>Spaceflight history books<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>Technology News<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>\n<p>     (adsbygoogle = window.adsbygoogle || []).push({});<\/p>\n<p>During rollout, Enterprise was driven at various speeds to measure and note the various vibration strains on the fully-mated Shuttle stack. This was used to determine an optimal rollout speed for operational Space Shuttle missions.<\/p>\n<p>Once at the pad, Enterprise helped validate launch pad procedures.<\/p>\n<p>With vital data already at hand from the Enterprise roll to 39A,&nbsp;Columbia and the STS-1 stack were rolled out to the same pad by the CT on December 29, 1980.&nbsp;STS-1\u2019s launch kicked off the Shuttle era the following year.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft\" title=\"Z4\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2012\/11\/Z415.jpg\" alt=\"\" width=\"350\" height=\"272\">The CTs took it in turns to rollout all of the Shuttle stacks for their missions, an always-impressive sight,&nbsp;not least STS-6, as the CT rolled its superstar passenger of Shuttle Challenger out in fog bank over the crawler way at the Kennedy Space Center (KSC) in March, 1983.<\/p>\n<p>Modifications were made throughout the lifetime of the CTs, including ahead of Return To Flight when replacement work was carried out on large amounts of the vehicle, including the huge shoes that make up the tracks on the Crawlers \u2013 a massive feat considering the CT has eight tracks, two on each corner, with each track consisting of 57 shoes, each shoe weighing in at 1,984 pounds (900 kg).<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-medium wp-image-39301\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2015\/02\/2015-02-16-15_13_19-Ares-I-X-Rollout-Google-Search-350x227.jpg\" alt=\"2015-02-16 15_13_19-Ares I-X Rollout - Google Search\" width=\"350\" height=\"227\" srcset=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2015\/02\/2015-02-16-15_13_19-Ares-I-X-Rollout-Google-Search-350x227.jpg 350w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2015\/02\/2015-02-16-15_13_19-Ares-I-X-Rollout-Google-Search-539x350.jpg 539w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2015\/02\/2015-02-16-15_13_19-Ares-I-X-Rollout-Google-Search-768x499.jpg 768w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2015\/02\/2015-02-16-15_13_19-Ares-I-X-Rollout-Google-Search.jpg 948w\" sizes=\"(max-width: 350px) 100vw, 350px\">While the CTs continued their role with Shuttle, the opening task with the Constellation Program (CxP) involved the rollout of the&nbsp;Ares I-X vehicle to Pad 39B for its October, 2009 test flight.<\/p>\n<p>CT-2 paid its first visit to the Ares Mobile Launcher (ML) \u2013 not involved with the Ares I-X launch \u2013 in 2010, relocating the newly built structure to its parksite home. However, this was during an uncertain time, with the Constellation Program being closed down.<\/p>\n<p>The CTs found themselves being re-purposed yet again, this time with the&nbsp;the Space Launch System&nbsp;(SLS).<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft\" title=\"Z82\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2012\/11\/Z821.jpg\" alt=\"\" width=\"349\" height=\"248\">With the Crawlerway tested to show it could handle the massive weight of the Heavy Lift Launch Vehicle&nbsp;(HLV),&nbsp;a test run of the CT with the former Ares ML \u2013 since designated to host SLS vehicles&nbsp;\u2013 was conducted in November, 2011.<\/p>\n<p>The trip to 39B was taken at a very steady pace, allowing for critical measurements to be taken during the 4.2 mile journey.<\/p>\n<p>The CT conducted the roll of the large structure without issue, prior to&nbsp;returning it to near the VAB after pad testing was completed.<\/p>\n<h4 class=\"widget-title penci-border-arrow\">See Also<\/h4>\n<ul>\n<li>SLS Forum Section<\/li>\n<li>L2 SLS Section<\/li>\n<li>Click here to Join L2<\/li>\n<\/ul>\n<p>However, it will be a much heavier stack to carry once the SLS is integrated on the ML inside the VAB \u2013 with the heaviest SLS rollout weight, including the ML, estimated to be over 14 million pounds.<\/p>\n<p>As such, CT-2 received approval for modifications, to modernize and beef up its capability almost immediately after completing the ML roll testing.<\/p>\n<p>CT-2\u2019s upgrades began with JEL (Jacking, Equalizing, and Leveling) valve replacement.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-32367\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2014\/01\/Z55.jpg\" alt=\"Z5\" width=\"348\" height=\"250\">The upgrades included the Alco E1 &amp; E2 Engine Panel upgrades, Parking\/Service Brakes improvements, Cabin replacement\/modifications and the installation of two new massive 1500KW Generator sets.<\/p>\n<p>Classed as a 20 year life extension effort under NASA\u2019s Ground Systems Development and Operations Program (GSDO) effort,&nbsp;45 areas were worked on \u2013 right down to new carpets in the cabins \u2013 with a test roll down the Crawlerway from the VAB conducted in 2012.<\/p>\n<p>CT-2 returned to the VAB to take up residency inside the giant building\u2019s High Bay 2 (HB-2) for the next set of modifications, focusing on the&nbsp;modification work on the roller bearings.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-32365\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2014\/01\/Z37.jpg\" alt=\"Z3\" width=\"346\" height=\"233\">It was soon joined by CT-1 in High Bay 3 (HB-3), as it too began upgrades, opening with asbestos abatement\/removal tasks ahead of&nbsp;the engine control room modifications.<\/p>\n<p>CT-1 completed modifications in line with those already conducted on CT-2, along with being the test bed for new JEL Cylinder Prototype testing.<\/p>\n<p>CT-1 was then used as the test article for a complete generator load bank test.<\/p>\n<p>\u201cThe Test confirmed the max power output for each generator. Also, the test served as the baseline for Temperature and Airflow around locations of the MPPU\u2019s and the MPPU Porch,\u201d per L2\u2019s CT upgrade section.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-medium wp-image-39302\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2015\/02\/2015-02-16-15_14_37-Entire-KSC-Status-Report-ISC-Jan-2014-Onwards-350x265.jpg\" alt=\"2015-02-16 15_14_37-Entire KSC Status Report (ISC) - Jan, 2014 Onwards\" width=\"350\" height=\"265\" srcset=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2015\/02\/2015-02-16-15_14_37-Entire-KSC-Status-Report-ISC-Jan-2014-Onwards-350x265.jpg 350w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2015\/02\/2015-02-16-15_14_37-Entire-KSC-Status-Report-ISC-Jan-2014-Onwards-463x350.jpg 463w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2015\/02\/2015-02-16-15_14_37-Entire-KSC-Status-Report-ISC-Jan-2014-Onwards-768x581.jpg 768w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2015\/02\/2015-02-16-15_14_37-Entire-KSC-Status-Report-ISC-Jan-2014-Onwards.jpg 828w\" sizes=\"(max-width: 350px) 100vw, 350px\">\u201cThe Porch is slated to be installed on End 3 of CT-2 in a year or two.\u201d<\/p>\n<p>CT-1 was recently seen&nbsp;at the old Saturn Mobile Service Structure (MSS) park site at the A\/B Crawlerway spilt,&nbsp;keeping Mobile Launch Platform -2 (MLP-2) company.<\/p>\n<p>Meanwhile, CT-2 \u2013 with a fresh set of bearings \u2013 moved out of HB-2 for a short trip before returning to the VAB, allowing for lubrication checks and testing last year.<\/p>\n<p>The CT was taken on a test run around the VAB to&nbsp;a point just behind OPF 1.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-32370\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2014\/01\/Z85.jpg\" alt=\"Z8\" width=\"351\" height=\"239\">The test \u2013 according to L2\u2019s CT upgrade section&nbsp;\u2013 helped evaluate the CT\u2019s&nbsp;new rollers, bearings and shafts on the vehicle\u2019s A and C corners, along with a new Strain and Temperature System.<\/p>\n<p>The CT then made another move, this time to its CT yard \u2013 a familiar port of call for the Crawlers.<\/p>\n<p>CT-2 then rolled to the east side of the VAB through the curves and then back to the SRM Road, twice.<\/p>\n<p>It then returned to the CT Yard for a refuel and some maintenance.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-32373\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2014\/01\/Z102.jpg\" alt=\"Z10\" width=\"349\" height=\"228\">After a brief CT yard stay, CT-2 was moved back to the VAB for continuation of Phase II modifications.<\/p>\n<p>All of the modifications to CT-2 are expected to be completed by early 2016.<\/p>\n<p>\u201cCrawler Transporter (CT) Team received the refurbished CT gear-box components,\u201d added L2\u2019s CT Upgrade Section.<\/p>\n<p>\u201cTwo of the shafts have been successfully installed and the remainder will be installed as part of the gear-box project.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-medium wp-image-39303\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2015\/02\/2015-02-16-15_15_13-Space-Port-News-Jan2015.pdf-Foxit-Reader-350x245.jpg\" alt=\"2015-02-16 15_15_13-Space Port News Jan2015.pdf - Foxit Reader\" width=\"350\" height=\"245\" srcset=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2015\/02\/2015-02-16-15_15_13-Space-Port-News-Jan2015.pdf-Foxit-Reader-350x245.jpg 350w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2015\/02\/2015-02-16-15_15_13-Space-Port-News-Jan2015.pdf-Foxit-Reader-500x350.jpg 500w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2015\/02\/2015-02-16-15_15_13-Space-Port-News-Jan2015.pdf-Foxit-Reader-768x538.jpg 768w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2015\/02\/2015-02-16-15_15_13-Space-Port-News-Jan2015.pdf-Foxit-Reader.jpg 1042w\" sizes=\"(max-width: 350px) 100vw, 350px\">\u201cPrior to shoe installation a spin test will take place to check for proper installation in preparation for a planned rollout.<\/p>\n<p>Those upgrades have since been completed, with a test run of CT-2 to Pad 39B taking place on Wednesday.&nbsp;L2 schedule information showed weather this move was scheduled to start at 8am on Wednesday.<\/p>\n<p>\u201cVAB CT Move: CT-2 will move from VAB, Hi-Bay 2 to Pad 39B on 2\/18\/15 at 0800 Eastern,\u201d per L2\u2019s CT Upgrade section.<\/p>\n<p>The start time was slightly later in the day \u2013 after teams had to fix&nbsp;a minor controller module problem \u2013 before KSC information confirmed the CT was rolling.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-medium wp-image-39393\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2015\/02\/2015-02-24-01_04_43-Twitter-350x258.jpg\" alt=\"2015-02-24 01_04_43-Twitter\" width=\"350\" height=\"258\" srcset=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2015\/02\/2015-02-24-01_04_43-Twitter-350x258.jpg 350w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2015\/02\/2015-02-24-01_04_43-Twitter-475x350.jpg 475w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2015\/02\/2015-02-24-01_04_43-Twitter.jpg 550w\" sizes=\"(max-width: 350px) 100vw, 350px\">It was initially thought the CT would take several hours to roll down the crawlerway. However, the CT first made a short trip to an area between OPF-1 and the CT Yard, in the middle of the Tow Way, allowing for the adjusting of Tread Belts.<\/p>\n<p>The main roll was conducted on Monday, timed to coincide with the anniversary, allowing for photo opportunities and further promotion of NASA\u2019s future ambitions relating to deep space exploration.<\/p>\n<p>CT-2\u2019s destination \u2013 Pad 39B \u2013 is now deep into its transition to become a \u201cclean pad\u201d. It was recently announced it will receive&nbsp;a new Flame Deflector and associated Flame Trench,&nbsp;required to help the pad deal with the immense thrust of the SLS.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-medium wp-image-39304\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2015\/02\/2015-02-16-15_16_14-L2-Level_-Space-Launch-System-Update-Notes-And-Discussion-Sept-2014-onwards-350x281.jpg\" alt=\"2015-02-16 15_16_14-L2 Level_ Space Launch System Update Notes And Discussion - Sept, 2014 onwards\" width=\"350\" height=\"281\" srcset=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2015\/02\/2015-02-16-15_16_14-L2-Level_-Space-Launch-System-Update-Notes-And-Discussion-Sept-2014-onwards-350x281.jpg 350w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2015\/02\/2015-02-16-15_16_14-L2-Level_-Space-Launch-System-Update-Notes-And-Discussion-Sept-2014-onwards-435x350.jpg 435w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2015\/02\/2015-02-16-15_16_14-L2-Level_-Space-Launch-System-Update-Notes-And-Discussion-Sept-2014-onwards-768x618.jpg 768w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2015\/02\/2015-02-16-15_16_14-L2-Level_-Space-Launch-System-Update-Notes-And-Discussion-Sept-2014-onwards.jpg 802w\" sizes=\"(max-width: 350px) 100vw, 350px\">Everything remains on track for CT-2 is to carry out its first operational role by picking up the Mobile Launcher (ML) \u2013 which is continuing conversion work for SLS \u2013 before carrying it inside the VAB, all likely taking place in late 2017 or early 2018.<\/p>\n<p>This will be a key part of the build up to Exploration Mission -1 (EM-1), with the first Space Launch System (SLS) expected to be stacked on the ML for a roll to Pad 39B.<\/p>\n<p>The first rollout is expected to test all of the systems, along with pad fit checks.<\/p>\n<p>The stack will likely roll back to the protection of the VAB ahead of launch preparations for the first mission rollout of the Heavy Lift Launch Vehicle (HLV) with Orion, for the Exploration Mission -1 (EM-1) pad flow to lift-off, culminating in the first mission of the new era in mid-2018.<\/p>\n<p>(Images: Via L2 content from L2\u2019s SLS specific L2 section, which includes, presentations, videos, graphics and internal \u2013 interactive with actual SLS engineers \u2013 updates on the SLS and HLV, available on no other site. Final image of SLS via L2 Artist Nathan Koga. Other image via L2 Historical and NASA)<\/p>\n<p>(L2 is \u2013 as it has been for the past several years \u2013 providing full exclusive SLS&nbsp; and Exploration Planning coverage.&nbsp; To join L2, click here:&nbsp;http:\/\/www.nasaspaceflight.com\/l2\/)<\/p>\n","protected":false},"excerpt":{"rendered":"<p>NASA\u2019s Crawler Transporter -2 (CT-2) is continuing to enjoy its first outing in over a year, as its roll to Pad 39B tests its latest modifications ahead of an active role with the Space Launch System (SLS). Its trip at the pad began last week, but was staggered to mark the 50th anniversary of the [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":30163,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":"","_links_to":"","_links_to_target":""},"categories":[2],"tags":[7871,8976,8892,624],"class_list":["post-39396","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","tag-39b","tag-ct","tag-ml","tag-sls"],"acf":[],"_links":{"self":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/39396"}],"collection":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/comments?post=39396"}],"version-history":[{"count":0,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/39396\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/media\/30163"}],"wp:attachment":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/media?parent=39396"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/categories?post=39396"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/tags?post=39396"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}