{"id":39464,"date":"2014-11-08T22:16:22","date_gmt":"2014-11-08T14:16:22","guid":{"rendered":"https:\/\/wp-productionenv-bjg9h2g2bgg5b8aa.southeastasia-01.azurewebsites.net\/news\/dream-chaser-lines-up-network-of-public-airport-landing-options\/"},"modified":"2014-11-08T22:16:22","modified_gmt":"2014-11-08T14:16:22","slug":"dream-chaser-lines-up-network-of-public-airport-landing-options","status":"publish","type":"post","link":"https:\/\/starpath.global\/news\/dream-chaser-lines-up-network-of-public-airport-landing-options\/","title":{"rendered":"Dream Chaser lines up network of public airport landing options"},"content":{"rendered":"<p>Sierra Nevada Corporation (SNC) has presented an overview on the wealth of potential landing site options available to its Dream Chaser spacecraft, outlining how the company could add an array of public airports \u2013 with minimum disruption \u2013 for both nominal and emergency End Of Mission (EOM) scenarios when the primary CONUS landing sites are not available.<\/p>\n<p>Dream Chaser Final Approach:<\/p>\n<p>The baby orbiter is currently embattled in a legal challenge against NASA\u2019s decision to award continued Commercial Crew funding to SpaceX\u2019s Dragon V2 (Dragon 2) and Boeing\u2019s CST-100.<\/p>\n<h4 class=\"widget-title penci-border-arrow\">See Also<\/h4>\n<ul>\n<li>Commercial Crew Forum<\/li>\n<li>L2 Future&nbsp;Vehicles&nbsp;Section<\/li>\n<li>L2&nbsp;Dream Chaser&nbsp;Special<\/li>\n<li>Click here to Join L2<\/li>\n<\/ul>\n<p>Ironically, both SpaceX and Boeing have become somewhat mute during this challenge, while SNC have been firing out media releases portraying an active program, despite NASA\u2019s CCtCAP decision \u2013 albeit while laying off key workers involved in the development of the spaceplane.<\/p>\n<p>SNC did note that Dream Chaser would live on, regardless of NASA\u2019s decision, although she is now at the mercy of finding alternative customers in the commercial field. That, in part, explains SNC\u2019s active media drive of late.<\/p>\n<p><img fetchpriority=\"high\" decoding=\"async\" class=\"alignleft\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2014\/01\/Z113.jpg\" alt=\"Z11\" width=\"345\" height=\"216\">The latest information pertains to one of Dream Chaser\u2019s star turns, namely her ability select and land on numerous runway options, post mission.<\/p>\n<p>While CST-100 will land via airbags, and crewed Dragon\u2019s are eventually expected to propulsively return to a designated landing site \u2013 after initial missions will parachute into the ocean \u2013 Dream Chaser would utilize her cross range capability and pick a runway for a post-mission scenario that mimicked her auntie, the Space Shuttle.<\/p>\n<p>This \u201cdissimilar redundancy\u201d was supposed to be a winning ticket in the eyes of NASA.<\/p>\n<p>Instead, the Agency opted for a future of that only involves capsules -both commercial and NASA \u2013 for its astronaut transportation needs.<\/p>\n<p>     (adsbygoogle = window.adsbygoogle || []).push({});<\/p>\n<p>Dream Chaser To An Airport Near You:<\/p>\n<p>This week, SNC and partner organization RS&amp;H, Inc., presented findings regarding the challenges and opportunities of landing Dream Chaser at public-use airports during the Space Traffic Management Conference at the space-famous Embry-Riddle Aeronautical University (ERAU).<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-medium wp-image-38144\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2014\/11\/2014-11-08-14_07_36-Challenges-and-Opportunities-Related-to-Landing-the-Dream-Chaser-5Nov14-20pp.pdf-350x253.jpg\" alt=\"2014-11-08 14_07_36-Challenges and Opportunities Related to Landing the Dream Chaser 5Nov14 20pp.pdf\" width=\"350\" height=\"253\">The presentation showed Dream Chaser would have the option to land at an array of options around the planet.<\/p>\n<p>However, work analyzing the applicable standards and unique requirements that must be addressed to receive approval for Dream Chaser to land either at a spaceport or commercial airport is continuing.<\/p>\n<p>Although SNC summarized the findings in a short media release, the presentation has since been acquired, providing insight into the current evaluations.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-medium wp-image-38138\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2014\/11\/2014-11-08-02_50_32-MAPS_G_G_5.pdf-Foxit-Reader-350x240.jpg\" alt=\"2014-11-08 02_50_32-MAPS_G_G_5.pdf - Foxit Reader\" width=\"350\" height=\"240\" srcset=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2014\/11\/2014-11-08-02_50_32-MAPS_G_G_5.pdf-Foxit-Reader-350x240.jpg 350w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2014\/11\/2014-11-08-02_50_32-MAPS_G_G_5.pdf-Foxit-Reader-510x350.jpg 510w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2014\/11\/2014-11-08-02_50_32-MAPS_G_G_5.pdf-Foxit-Reader-768x527.jpg 768w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2014\/11\/2014-11-08-02_50_32-MAPS_G_G_5.pdf-Foxit-Reader.jpg 1117w\" sizes=\"(max-width: 350px) 100vw, 350px\">The key elements of the presentation noted Dream Chaser could follow in the footsteps of the Space Shuttle, a vehicle that had three primary landing sites (KSC, Edwards and the less-than-desirable White Sands) but also a multitude of alternative, emergency sites.<\/p>\n<p>A full landing site option overview presentation provided to shuttle crews (available in L2) showed each site \u2013 ranging from Atlantic City International to Amberley in Australia \u2013 along with a number of highly sporty landings at some exotic island landing strips \u2013 with numerous navigational aids and photography included.<\/p>\n<p>Most, however, were for the event of an emergency (immediate) return from orbit, something that was thankfully never required during the history of the Space Shuttle Program.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2012\/10\/Z35.jpg\" alt=\"\" width=\"351\" height=\"207\">A continually updated Google Earth program (L2)&nbsp;\u2013 known as the complete ELS runway database \u2013&nbsp;also showed thousands of landing sites across the planet, each with an array of data.<\/p>\n<p>Most of options were ruled out from hosting a returning orbiter, mostly due to the large runway dimensions a shuttle required when touching back down on terra firma.<\/p>\n<p>NASA\u2019s Landing Support Officer (LSO) worked on color coding every runway in rank of ability for an orbiter to stand a chance of landing and coming to a stop.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2013\/12\/Z73.jpg\" alt=\"Z7\" width=\"349\" height=\"207\">During the Shuttle era, NASA\u2019s Mission Operations Directorate (MOD) briefed the teams at least once a year on what to do if a shuttle was forced to make an emergency landing.<\/p>\n<p>These evaluations included the basic requirements for a 1,200 feet exclusion zone while the crew powered down the orbiter, prior to the arrival of the NASA rapid response team within 24 hours.<\/p>\n<p>The emergency response for a Shuttle orbiter would have been far more elaborate when compared to Dream Chaser due to the major difference of the SNC spaceplane\u2019s lack of&nbsp;any hazardous materials for operation.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2013\/07\/Z46.jpg\" alt=\"Flare prior to landing\" width=\"349\" height=\"218\">As such Dream Chaser should be able to land at any suitable runway, over 8,000 feet long, without requiring specialized equipment. Shuttle orbiters historically required a 12,000 feet long runway as a general minimum requirement, added to an array of support vehicles to care for the orbiter.<\/p>\n<p>According to the presentation, Dream Chaser sports a cross-range capability of 1,100 nmi for the Dream Chaser, cited as exceeding Space Shuttle performance and allowing for the vehicle to maintain at least one runway landing opportunity every orbit.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-medium wp-image-38148\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2014\/11\/2014-11-08-14_52_07-Challenges-and-Opportunities-Related-to-Landing-the-Dream-Chaser-5Nov14-20pp.pdf-350x196.jpg\" alt=\"2014-11-08 14_52_07-Challenges and Opportunities Related to Landing the Dream Chaser 5Nov14 20pp.pdf\" width=\"350\" height=\"196\" srcset=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2014\/11\/2014-11-08-14_52_07-Challenges-and-Opportunities-Related-to-Landing-the-Dream-Chaser-5Nov14-20pp.pdf-350x196.jpg 350w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2014\/11\/2014-11-08-14_52_07-Challenges-and-Opportunities-Related-to-Landing-the-Dream-Chaser-5Nov14-20pp.pdf-624x350.jpg 624w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2014\/11\/2014-11-08-14_52_07-Challenges-and-Opportunities-Related-to-Landing-the-Dream-Chaser-5Nov14-20pp.pdf-768x430.jpg 768w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2014\/11\/2014-11-08-14_52_07-Challenges-and-Opportunities-Related-to-Landing-the-Dream-Chaser-5Nov14-20pp.pdf.jpg 892w\" sizes=\"(max-width: 350px) 100vw, 350px\">As with Shuttle, a primary landing site within the contiguous United States (CONUS) is the first priority. Dream Chaser has secured three such sites, namely the Shuttle Landing Facility (SLF) in Florida, Vandenberg Air Force Base in California, and Houston\u2019s Ellington Airport in Texas.<\/p>\n<p>SNC has also initiated discussions and assessments with multiple landing sites around the world.<\/p>\n<p>Disruption to a public airport hosting a scheduled \u2013 or unscheduled \u2013 landing of a Dream Chaser would be minimal, with SNC noting she could&nbsp;be removed from the runway within minutes of landing, further reducing any opportunity for landing site conflicts for nominal (planned) landing sites as well as abort or emergency (unplanned) landing sites.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2013\/06\/Z71.jpg\" alt=\"Dream Chaser with Centaur\" width=\"351\" height=\"240\">The presentation covers both nominal, emergency returns from orbit and also ascent aborts, with Dream Chaser enjoying continuous runway landing capability from the launch pad through the Atlas\/Centaur launch vehicle trajectory. &nbsp;SNC are in \u201cregular collaborative dialogue\u201d with the Federal Aviation Administration (FAA) for the identification and confirmation of such sites.<\/p>\n<p>Also covered is Dream Chaser\u2019s impressive Delta-V margins and fault tolerance Reaction Control System (RCS) to ensure the spacecraft would be able to conduct the passage towards an emergency landing site.<\/p>\n<p>In the emergency event of an incapacitated crew, Dream Chaser would be able to find her way home, via the use of her autoland capability.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-medium wp-image-38146\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2014\/11\/2014-11-08-14_22_30-Shuttle-Flight-Deck-Google-Search-350x230.jpg\" alt=\"2014-11-08 14_22_30-Shuttle Flight Deck - Google Search\" width=\"350\" height=\"230\" srcset=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2014\/11\/2014-11-08-14_22_30-Shuttle-Flight-Deck-Google-Search-350x230.jpg 350w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2014\/11\/2014-11-08-14_22_30-Shuttle-Flight-Deck-Google-Search-532x350.jpg 532w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2014\/11\/2014-11-08-14_22_30-Shuttle-Flight-Deck-Google-Search.jpg 725w\" sizes=\"(max-width: 350px) 100vw, 350px\">Notably, work was conducted to give the Shuttle orbiter\u2019s such a capability (Autonomous Orbiter Rapid Prototype (AORP)\/Remote Controlled Orbiter IFM cable) to end their missions without crew assistance.<\/p>\n<p>However, this was later explained as evaluations into the highly undesirable event of a mortally injured orbiter being able to leave her crew at the \u201csafe haven\u201d of the ISS, ahead of either making an \u201cattempt\u201d to land, or conduct a tail first destructive re-entry.<\/p>\n<p>An injured orbiter would have had to depart the ISS to free up the docking port for the LON (Launch On Need) orbiter.<\/p>\n<p>In the event of a Dream Chaser making a surprise visit to a public airport, the post landing turnaround would be speedy, per the planning that has already taken place.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-medium wp-image-38145\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2014\/11\/2014-11-08-14_15_35-Challenges-and-Opportunities-Related-to-Landing-the-Dream-Chaser-5Nov14-20pp.pdf-350x236.jpg\" alt=\"2014-11-08 14_15_35-Challenges and Opportunities Related to Landing the Dream Chaser 5Nov14 20pp.pdf\" width=\"350\" height=\"236\" srcset=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2014\/11\/2014-11-08-14_15_35-Challenges-and-Opportunities-Related-to-Landing-the-Dream-Chaser-5Nov14-20pp.pdf-350x236.jpg 350w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2014\/11\/2014-11-08-14_15_35-Challenges-and-Opportunities-Related-to-Landing-the-Dream-Chaser-5Nov14-20pp.pdf-518x350.jpg 518w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2014\/11\/2014-11-08-14_15_35-Challenges-and-Opportunities-Related-to-Landing-the-Dream-Chaser-5Nov14-20pp.pdf.jpg 687w\" sizes=\"(max-width: 350px) 100vw, 350px\">Following rollout, the crew would remain inside the spacecraft while she was towed off the runaway \u2013 unlike the scenario of the Space Shuttle. An option would still be available \u2013 likely in a medical emergency scenario \u2013 for the crew to egress out of the Dream Chaser after wheels stop.<\/p>\n<p>The return of an uncrewed Dream Chaser would require the deactivation of the Flight Termination System (FTS) ordnance \u2013 although SNC note they are looking at other FTS options that do not include ordnance.<\/p>\n<p>Should that \u201cworst case\u201d FTS solution be implemented, a post-landing Dream Chaser would require a two-person crew to install&nbsp;safing pins in the Safe and Arm devices for the FTS.<\/p>\n<p>Evaluations into the timeline for a Dream Chaser landing and being successfully towed to a safe area off the runway shows the process can be completed in just 10 to 20 minutes.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2012\/07\/Z341.jpg\" alt=\"\" width=\"350\" height=\"234\">Other considerations covered in the evaluations note the the ideal runway options would be constructed of concrete instead of asphalt.<\/p>\n<p>This is because an asphalt runway landing may require the modification to the Dream Chaser nose skid material.<\/p>\n<p>Tests of the landing skid have demonstrated that concrete runways are durable enough to withstand the vehicle\u2019s existing skid material without causing unusual wear and degradation to the runway.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2013\/07\/Z38.jpg\" alt=\"Tow Test\" width=\"350\" height=\"220\">Data on the nose skid\u2019s interactions have already been acquired during the Dream Chaser ETA (Engineering Test Vehicle) testing at Edwards Air Force Base, where the vehicle was dragged behind a truck for more than 20 miles in numerous ground taxi tow tests.<\/p>\n<p>This is one of the important factors a commercial airport operator would need to be consulted on, given the goal would be to free an undamaged runway in a timely manner to allow for the airport to reopen the runway for commercial aircraft.\n<\/p>\n<p>The Edwards testing noted that the nose landing skid imparted no damage to the runway, striping, or runway centerline lighting.<\/p>\n<p>Additionally, no damage was done to the runway when the left main landing gear did not properly deploy during the infamous landing test that ended with Dream Chaser taking a tumble off the runway.<\/p>\n<p>The presentation shows that despite the large amount of evaluations that have already taken place, negotiations will be required closer to the time Dream Chaser would require such landing options to become available.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-medium wp-image-38149\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2014\/11\/2014-11-08-15_17_15-Challenges-and-Opportunities-Related-to-Landing-the-Dream-Chaser-5Nov14-20pp.pdf-350x331.jpg\" alt=\"2014-11-08 15_17_15-Challenges and Opportunities Related to Landing the Dream Chaser 5Nov14 20pp.pdf\" width=\"350\" height=\"331\" srcset=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2014\/11\/2014-11-08-15_17_15-Challenges-and-Opportunities-Related-to-Landing-the-Dream-Chaser-5Nov14-20pp.pdf-350x331.jpg 350w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2014\/11\/2014-11-08-15_17_15-Challenges-and-Opportunities-Related-to-Landing-the-Dream-Chaser-5Nov14-20pp.pdf-370x350.jpg 370w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2014\/11\/2014-11-08-15_17_15-Challenges-and-Opportunities-Related-to-Landing-the-Dream-Chaser-5Nov14-20pp.pdf.jpg 689w\" sizes=\"(max-width: 350px) 100vw, 350px\">This includes airspace requirements, given Dream Chaser descends from orbit as a glider, with both a very high velocity and a high sink rate. This renders her incompatible with typical aircraft operations and requires special handling from Air Traffic Control facilities.<\/p>\n<p>Evaluations note that \u201call commercial aircraft operating at altitudes between 18,000 feet mean sea level (msl) (FL180) and 60,000 feet msl (FL600) are required to operate on flight plans generally under Instrument Flight Rules (IFR) requirements and must be in contact with FAA air traffic controllers.<\/p>\n<p>\u201cBelow 18,000 feet msl (FL180), many aircraft are not on flight plans with a mix of IFR and Visual Flight Rules (VFR) operations and, depending on the geographic area, may not be in contact with air traffic controllers.<\/p>\n<p>\u201cThese combined considerations make it essential that the Dream Chaser descent be planned in coordination with air traffic control. Specific blocks of airspace must first be identified before planning an airport descent and approach.\u201d<\/p>\n<p>Letters of Agreement among the various controlling agencies would set pre-authorized reservations in place, allowing for commercial air traffic to be routed around the intended flight corridor until the Dream Chaser vehicle lands.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2013\/10\/Z57.jpg\" alt=\"Z5\" width=\"348\" height=\"209\">Work with the FAA is expected to cover a number of certification and requirements, ranging from airspace to public safety \u2013 including the impact of the sonic boom that Dream Chaser will create to announce her return from supersonic velocities.<\/p>\n<p>\u201cThe need for future work in the areas of environmental analyses due to sonic boom and trajectory shaping will need to be completed to gain final NEPA approval for Dream Chaser landing at spaceport and\/or public use airports, such as Ellington Airport,\u201d added the presentation.<\/p>\n<p>\u201cThrough the use of sonic boom analytical software such as PCBoom, a standardized method can be used to understand the impact and develop an optimal flight path.\u201d<\/p>\n<p>Overall, the evaluations show Dream Chaser is likely to be able to land at public-use airports, pending negotiations, safety outlines and FAA approval.<\/p>\n<p>(Images via SNC,&nbsp;L2 and NASA)<\/p>\n<p>(Click here:&nbsp;http:\/\/www.nasaspaceflight.com\/l2\/&nbsp;\u2013 to view how you can access the best space flight content on the entire internet and directly support NSF\u2019s running costs).<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Sierra Nevada Corporation (SNC) has presented an overview on the wealth of potential landing site options available to its Dream Chaser spacecraft, outlining how the company could add an array of public airports \u2013 with minimum disruption \u2013 for both nominal and emergency End Of Mission (EOM) scenarios when the primary CONUS landing sites are [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":29992,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":"","_links_to":"","_links_to_target":""},"categories":[2],"tags":[8996,4055,3985,524,970,8894],"class_list":["post-39464","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","tag-ccdev","tag-ccicap","tag-cctcap","tag-commercial-crew","tag-dream-chaser","tag-snc"],"acf":[],"_links":{"self":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/39464"}],"collection":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/comments?post=39464"}],"version-history":[{"count":0,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/39464\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/media\/29992"}],"wp:attachment":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/media?parent=39464"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/categories?post=39464"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/tags?post=39464"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}