{"id":39467,"date":"2014-11-03T18:53:52","date_gmt":"2014-11-03T10:53:52","guid":{"rendered":"https:\/\/wp-productionenv-bjg9h2g2bgg5b8aa.southeastasia-01.azurewebsites.net\/news\/sls-manifest-targets-europa-and-mars-sample-return-missions\/"},"modified":"2014-11-03T18:53:52","modified_gmt":"2014-11-03T10:53:52","slug":"sls-manifest-targets-europa-and-mars-sample-return-missions","status":"publish","type":"post","link":"https:\/\/starpath.global\/news\/sls-manifest-targets-europa-and-mars-sample-return-missions\/","title":{"rendered":"SLS manifest targets Europa and Mars Sample Return missions"},"content":{"rendered":"<p>NASA is moving up a gear with its manifest planning for the Space Launch System (SLS). A new internal manifest portrays a tag team approach, alternating SLS between crewed missions for Orion and major flagship science missions that includes sending a spacecraft to Europa and conducting a Mars Sample Return mission, all before the middle of the next decade.<br \/>\nSLS Manifest Drive:<\/p>\n<p>The launch rate for NASA\u2019s new Heavy Lift Launch Vehicle (HLV) has been a concern for some time, with&nbsp;Bill Gerstenmaier, NASA\u2019s Associate Administrator for Human Exploration and Operations, claiming SLS will have to launch&nbsp;at least once per year, as a \u201cnecessary\u201d requirement.<\/p>\n<p>The reasons for ensuring \u201crepetitive cadence\u201d relates to multiple engineering, safety and budgetary factors, but also to build public inspiration for NASA\u2019s future goals.<\/p>\n<p><img fetchpriority=\"high\" decoding=\"async\" class=\"alignleft size-medium wp-image-38086\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2014\/11\/2014-11-04-02_02_02-L2-Level_-Space-Launch-System-Update-Notes-And-Discussion-Sept-2014-onwards-350x230.jpg\" alt=\"2014-11-04 02_02_02-L2 Level_ Space Launch System Update Notes And Discussion - Sept, 2014 onwards\" width=\"350\" height=\"230\" srcset=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2014\/11\/2014-11-04-02_02_02-L2-Level_-Space-Launch-System-Update-Notes-And-Discussion-Sept-2014-onwards-350x230.jpg 350w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2014\/11\/2014-11-04-02_02_02-L2-Level_-Space-Launch-System-Update-Notes-And-Discussion-Sept-2014-onwards-532x350.jpg 532w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2014\/11\/2014-11-04-02_02_02-L2-Level_-Space-Launch-System-Update-Notes-And-Discussion-Sept-2014-onwards.jpg 647w\" sizes=\"(max-width: 350px) 100vw, 350px\">Currently, NASA\u2019s PR campaign for the monster rocket mainly revolves around a tour of a giant inflatable SLS model stationed outside random events.<\/p>\n<p>However, the big question of building the mission manifest for SLS has not laid dormant with NASA managers, many of whom continue to work methodically through options based on capability and affordability within the projected long-term budgets.<\/p>\n<p>That process now appears to be moving up a gear, with an expansion of the planning manifest now seen on internal documentation (L2), moving way past the current public information that only shows two missions and a loose promise of crewed missions to Mars in the mid 2030s.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2014\/04\/Z88.jpg\" alt=\"\" width=\"349\" height=\"247\">Those opening two missions begin with the 2018 test flight for SLS in her Block 1 configuration, tasked with lofting an uncrewed Orion to&nbsp;70,000 km past the Moon on a 25 day flight.<\/p>\n<p>This mission was changed from an Apollo 8 style mission around the Moon, in order to gain experience ahead of Exploration Mission -2 (EM-2) mission to send a crew to visit a captured asteroid.<\/p>\n<p>     (adsbygoogle = window.adsbygoogle || []).push({});<\/p>\n<p>Originally, the plan was to launch EM-1 in late 2017, prior to an unpopular four year wait until the crewed mission in 2021. Despite continued interest in a cargo mission to split the gap, the plan has not yet changed. The dates, however, have.<\/p>\n<p>Due to continued issues with what is known as the critical path \u2013 namely Orion and schedule problems with ESA\u2019s Service Module contribution \u2013 EM-1 has slipped into 2018. Internal information, acquired via SLS\u2019 L2 section, shows Orion is the driver for what is now a manifested slip to September 30, 2018.<\/p>\n<h4 class=\"widget-title penci-border-arrow\">See Also<\/h4>\n<ul>\n<li>SLS Forum Section<\/li>\n<li>L2 SLS Section<\/li>\n<li>L2 Orion Section<\/li>\n<li>Click here to Join L2<\/li>\n<\/ul>\n<p>Interestingly, the previous four year gap may also be reduced via a positive move, specifically the continued viability of advancing the EM-2 launch date.<\/p>\n<p>While there is some hope this date can move into the 2020 timeframe, manifest information shows this mission could at least move from the previous&nbsp;August 15, 2021 target to earlier in the year. Orion is shown as being able to support that change.<\/p>\n<p>NASA has not publicly noted any information for missions after EM-2. However, the newly created manifest information goes much further, with an eye on fulfilling Mr.&nbsp;Gerstenmaier\u2019s advice and creating some much-needed public interest.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2014\/03\/Z271.jpg\" alt=\"Z27\" width=\"348\" height=\"265\">Based around the utilization of what is now a baselined Block 1B configuration with the Exploration Upper Stage (EUS) \u2013 the workhorse for the 2020s \u2013 the manifest information shows an invigorated effort to secure the Europa Clipper mission for SLS.<\/p>\n<p>As previously reported by this site, several studies have been conducted for such a mission, ranging from an exercise in planning between SLS and JPL, through to payload fairing designs. However, planning now appears to be advancing at a pace.<\/p>\n<p>Based around a notional Design Reference Mission (DRM),&nbsp;there is now frequent communication between the Europa office at JPL and the SLS Program Office. This includes the exchange of data, analysis results and engineering computer models between the two organizations.<\/p>\n<p>*Click here for more SLS News Articles*<\/p>\n<p>Several other NASA centers and departments are now officially involved, ranging from the Ground Ops folks at KSC, through to the Launch Services Program (LSP).<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-32976\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2014\/03\/Z231.jpg\" alt=\"Z23\" width=\"345\" height=\"230\" srcset=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2014\/03\/Z231.jpg 345w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2014\/03\/Z231-263x175.jpg 263w\" sizes=\"(max-width: 345px) 100vw, 345px\">The main problem is obviously related to the funding standpoint, given this spacecraft remains without the major budget allocation.<\/p>\n<p>However, the&nbsp;benefits of utilizing the superior performance of SLS would result in the mission transit time being vastly reduced, when compared to the eight or so years it would take via a current launch vehicle.<\/p>\n<p>The marriage of a flagship science mission with SLS may also prove to be of interest politically, especially with lawmakers who support SLS.<\/p>\n<p>The internal planning has also created a placement on the manifest, with the notional mission now targeting launch in June 2022, with a backup opportunity in July 2023.<\/p>\n<p>Should the new manifest become a reality, the focus would then switch to Exploration Mission -3 (EM-3), the second flight of a crewed Orion. While there continues to be some debate as to the mission outline for this flight, it too now has an official launch date target, namely August 15, 2023.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-26979\" title=\"Z8\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2012\/11\/Z84.jpg\" alt=\"\" width=\"350\" height=\"265\">The following year would then switch attention toward Mars, with a previous option now becoming part of the baselined planning.<\/p>\n<p>Previously tagged as the \u201c2024+ Single Shot MSR on SLS\u201d option, a Mars Sample Return (MSR) mission has now received a placeholder in the 2024 slot on the official internal manifest.<\/p>\n<p>Originally, the outline spoke of a\u201dPossible Mars SEP (Solar Electric Power\/Propulsion) Orbiter\u201d riding as a secondary payload on the Heavy Lift Launch Vehicle. The cited alternatives of using a Falcon Heavy or a Delta IV-Heavy would see it become their primary payload.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-26980\" title=\"Z9\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2012\/11\/Z94.jpg\" alt=\"\" width=\"349\" height=\"222\">However, SLS planning now appears to be moving toward building a primary mission for the 2024 SLS flight.<\/p>\n<p>The mission has previously been outlined as utilizing robotics to acquire the samples, prior to being launched from the surface of Mars for a rendezvous with a crewed Orion vehicle.<\/p>\n<p>The sample canister would be then enclosed in a stowage case and stowed in Orion for its Earth return.<\/p>\n<p>\u201cThis approach deals with key planetary protection concerns. Crew inspection, cleaning and sample prior to Earth return removes the need to robotically \u201cbreak the chain\u201d of contact with samples at Mars, thus reducing complexity and cost of the robotic missions,\u201d noted the previous outline.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-medium wp-image-38085\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2014\/11\/2014-11-04-02_00_35-L2-Level_-Space-Launch-System-Update-Notes-And-Discussion-Sept-2014-onwards-350x239.jpg\" alt=\"2014-11-04 02_00_35-L2 Level_ Space Launch System Update Notes And Discussion - Sept, 2014 onwards\" width=\"350\" height=\"239\" srcset=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2014\/11\/2014-11-04-02_00_35-L2-Level_-Space-Launch-System-Update-Notes-And-Discussion-Sept-2014-onwards-350x239.jpg 350w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2014\/11\/2014-11-04-02_00_35-L2-Level_-Space-Launch-System-Update-Notes-And-Discussion-Sept-2014-onwards-512x350.jpg 512w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2014\/11\/2014-11-04-02_00_35-L2-Level_-Space-Launch-System-Update-Notes-And-Discussion-Sept-2014-onwards.jpg 641w\" sizes=\"(max-width: 350px) 100vw, 350px\">Once again, NASA funding requirements will ultimately decide if this mission can become a reality, although it would provide a stepping stone towards the eventual crewed missions to Mars.<\/p>\n<p>Exploration Mission -4 (EM-4) would be the third crewed mission of SLS and Orion, manifested for August 15, 2025. However, this mission is yet to gain an outline.<\/p>\n<p>Sources note the SLS Program Office continues to have meetings at quarterly intervals to review the latest studies for evolving the missions, with the majority of the focus currently being placed on the Europa Clipper opportunity.<\/p>\n<p>(Images: Via L2 content (lead image, EUS and SLS in her correct appearance (unpainted core) from L2 member Nathan Koga) and from L2\u2019s SLS sections, which includes, presentations, videos, graphics and internal \u2013 interactive with actual SLS engineers \u2013 updates on the SLS and HLV, available on no other site.)<\/p>\n<p>(L2 is \u2013 as it has been for the past several years \u2013 providing full exclusive SLS and Exploration Planning coverage. To join L2, click here:&nbsp;http:\/\/www.nasaspaceflight.com\/l2\/)<\/p>\n","protected":false},"excerpt":{"rendered":"<p>NASA is moving up a gear with its manifest planning for the Space Launch System (SLS). A new internal manifest portrays a tag team approach, alternating SLS between crewed missions for Orion and major flagship science missions that includes sending a spacecraft to Europa and conducting a Mars Sample Return mission, all before the middle [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":"","_links_to":"","_links_to_target":""},"categories":[2],"tags":[3718,4011,8909,9055,1659,367,8014,640,624],"class_list":["post-39467","post","type-post","status-publish","format-standard","hentry","category-news","tag-em-1","tag-em-2","tag-em-3","tag-em-4","tag-europa","tag-mars","tag-msr","tag-orion","tag-sls"],"acf":[],"_links":{"self":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/39467"}],"collection":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/comments?post=39467"}],"version-history":[{"count":0,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/39467\/revisions"}],"wp:attachment":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/media?parent=39467"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/categories?post=39467"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/tags?post=39467"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}