{"id":39497,"date":"2014-09-26T22:41:19","date_gmt":"2014-09-26T14:41:19","guid":{"rendered":"https:\/\/wp-productionenv-bjg9h2g2bgg5b8aa.southeastasia-01.azurewebsites.net\/news\/dream-chaser-shows-her-fight-snc-protest-cctcap-decision\/"},"modified":"2014-09-26T22:41:19","modified_gmt":"2014-09-26T14:41:19","slug":"dream-chaser-shows-her-fight-snc-protest-cctcap-decision","status":"publish","type":"post","link":"https:\/\/starpath.global\/news\/dream-chaser-shows-her-fight-snc-protest-cctcap-decision\/","title":{"rendered":"Dream Chaser shows her fight \u2013 SNC protest CCtCap decision"},"content":{"rendered":"<p>Sierra Nevada Corporation (SNC) has confirmed it will protest NASA\u2019s Commercial Crew Transportation Capability (CCtCap) contract award decision. While the protest is ongoing, the spaceplane will continue her pursuit of international partners, while a bid on the next round of commercial cargo contacts will provide additional near-term focus.<\/p>\n<p>Dream Chaser:<\/p>\n<p>SNC\u2019s talented workforce have made great progress maturing the design and development of the Dream Chaser Space System (DCSS).<\/p>\n<p>The reusable lifting body vehicle is based on the heritage of NASA Langley\u2019s HL-20 spaceplane concept from the 1980s, a space vehicle that can utilize cross-range capability and land on a conventional runway.<\/p>\n<p><img fetchpriority=\"high\" decoding=\"async\" class=\"alignleft\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2013\/12\/Z73.jpg\" alt=\"Z7\" width=\"349\" height=\"207\">While this commonality of capability and familiarity of appearance with the Space Shuttle made her the darling of the Commercial Crew fan base, Dream Chaser\u2019s practicality hones in on the spirit of the Shuttle orbiters, setting her apart from the fleet of capsules that appear to be the mainstay of NASA\u2019s own future ambitions.<\/p>\n<p>Within the space industry \u2013 at least those speaking to NASASpaceFlight \u2013 it&nbsp;was expected that NASA would select Dream Chaser alongside SpaceX\u2019s Dragon V2, providing a key element of&nbsp;\u201cdissimilar redundancy\u201d within the Agency\u2019s priority drive of removing the undesirable reliance on the Russian Soyuz for lofting NASA astronauts to an International Space Station (ISS) that was mainly funded and constructed by the United States.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-medium wp-image-37630\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2014\/09\/2014-09-26-22_37_39-CST-100-Dragon-Google-Search-350x214.jpg\" alt=\"2014-09-26 22_37_39-CST-100 Dragon - Google Search\" width=\"350\" height=\"214\" srcset=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2014\/09\/2014-09-26-22_37_39-CST-100-Dragon-Google-Search-350x214.jpg 350w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2014\/09\/2014-09-26-22_37_39-CST-100-Dragon-Google-Search-572x350.jpg 572w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2014\/09\/2014-09-26-22_37_39-CST-100-Dragon-Google-Search-180x110.jpg 180w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2014\/09\/2014-09-26-22_37_39-CST-100-Dragon-Google-Search.jpg 753w\" sizes=\"(max-width: 350px) 100vw, 350px\">Per the original CCtCap decision NASA opted to partner Dragon with Boeing\u2019s CST-100 capsule, with the rationale behind the decision a tightly kept secret \u2013 only set to be revealed, in part, by the upcoming publication of the Source Selection document.<\/p>\n<p>Missing out on a slice of the $6.8 billion pot \u2013 of which the lion\u2019s share was allocated to Boeing \u2013 &nbsp;understandably resulted in an immediate impact to SNC\u2019s Dream Chaser workforce.<\/p>\n<p>     (adsbygoogle = window.adsbygoogle || []).push({});<\/p>\n<p>\u201cAs a result of not being selected by NASA, SNC needed to conduct a limited staff reduction of our Dream Chaser team of the personnel that have come on board in anticipation of the growth a win would have provided,\u201d noted the company in a statement to NASASpaceFlight.com<\/p>\n<h4 class=\"widget-title penci-border-arrow\">See Also<\/h4>\n<ul>\n<li>Commercial Crew Forum<\/li>\n<li>L2 Future&nbsp;Vehicles&nbsp;Section<\/li>\n<li>L2&nbsp;Dream Chaser&nbsp;Special<\/li>\n<li>Click here to Join L2<\/li>\n<\/ul>\n<p>\u201cWe have held out as long as possible in taking these actions as every person and every job is important to the company. We spent considerable time exploring every avenue and doing all that we could think of to keep the impact of as minimal as possible.\u201d<\/p>\n<p>While any losses from within the highly skilled Dream Chaser workforce are undoubtedly painful, the company claims the impact is small when placed into context with both their growth over recent years and the total workforce at its base in Colorado.<\/p>\n<p>\u201cWe have retained as many people as we were able. The total reduction was approximately 9 percent of SNC\u2019s overall Colorado workforce. That workforce has grown significantly \u2013 from 200 people five years ago to over 1,110 today,\u201d added the company that works in several areas of the space industry.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2014\/01\/Z83.jpg\" alt=\"Z8\" width=\"349\" height=\"233\">\u201cSNC is, and will remain, financially sound and stable, with the business and backlog as strong as ever. This reduction was confined to the Dream Chaser team and support staff and does not affect our other programs. SNC employs a solid and quality space group. We continue to expand while expecting a strong year.\u201d<\/p>\n<p>However, even based on the original decision from NASA, the end of the road for Dream Chaser\u2019s CCP ambitions did not equate to her being confined to quarters, according to SNC.<\/p>\n<p>*Click here for more Dream Chaser News Articles*<\/p>\n<p>Firstly, the vehicle remained within NASA\u2019s program, via the final CCiCap milestones. Completion of those milestones should result in the Dream Chaser ETA (Engineering Test Vehicle) tasting the Californian air one more time at the end of this year.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2013\/10\/Z76.jpg\" alt=\"Z7\" width=\"348\" height=\"222\">The return trip to NASA\u2019s Dryden Flight Research Center is on the cards in order to complete a second \u201cFree Flight\u201d test, following on from the 2013 events.<\/p>\n<p>While that flight is still best known for the landing gear failure, it was still a hugely successful test, proving the vehicle could fly, and fly well \u2013 something that could only be confirmed via a full scale flight.<\/p>\n<p>\u201cWe plan to continue to work on Dream Chaser under the CCiCap initiative and with NASA,\u201d added the company.&nbsp;\u201cSNC has a significant ongoing Dream Chaser team sufficient to execute the program.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2012\/12\/Z412.jpg\" alt=\"\" width=\"350\" height=\"258\">Looking further ahead from the completion of the CCiCap milestones, SNC has made the immediate decision to keep Dream Chaser focused on achieving her ambition of berthing with the ISS.<\/p>\n<p>\u201cSNC has made the decision to continue the development of the Dream Chaser to flight, including a near term bid on NASA\u2019s CRS2 effort,\u201d SNC noted, pointing to a potential cargo role for the vehicle.<\/p>\n<p>CRS2 will be the follow on to the current Commercial Resupply Services (CRS) contract that involves SpaceX\u2019s cargo Dragon spacecraft and Orbital\u2019s Cygnus vehicle.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2012\/10\/Z313.jpg\" alt=\"\" width=\"349\" height=\"221\">On Friday, NASA released a request for proposals (RFP) for the next round of contracts for private-sector companies to deliver experiments and supplies to the orbiting laboratory.<\/p>\n<p>Under the Commercial Resupply Services 2 RFP, NASA intends to award contracts with one or more companies for six or more flights per contract.<\/p>\n<p>As with current resupply flights, these missions would launch from US spaceports, and the contracted services would include logistical and research cargo delivery and return to and from the space station through fiscal year 2020, with the option to purchase additional launches through 2024.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2013\/04\/Z1031.jpg\" alt=\"Crew boarding Dream Chaser\" width=\"348\" height=\"239\">However, Friday also marked the confirmation that the SNC management have opted to take the CCtCap decision through a protest procedure, as is the company\u2019s right.<\/p>\n<p>The deadline for making such a decision was Friday, meaning SNC looked at all of its options before filing the protest.<\/p>\n<p>\u201cI can confirm that SNC has officially filed a protest with the GAO regarding the CCtCap decision,\u201d the company confirmed to NASASpaceFlight.com.<\/p>\n<p>Later on Friday, a press release went further<img loading=\"lazy\" decoding=\"async\" class=\"alignleft\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2012\/10\/Z13.jpg\" alt=\"\" width=\"350\" height=\"213\">, shining light on the Source Selection document, citing serious questions and inconsistencies.<\/p>\n<p>\u201cIn its 51 year history SNC has never filed a legal challenge to a government contract award. &nbsp;However, in the case of the CCtCap award, NASA\u2019s own Source Selection Statement and debrief indicate that there are serious questions and inconsistencies in the source selection process. &nbsp;SNC, therefore, feels that there is no alternative but to institute a legal challenge,\u201d noted SNC, also highlighting some of the issues they found in the document.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2012\/01\/Z86.jpg\" alt=\"\" width=\"349\" height=\"245\">\u201cSNC\u2019s Dream Chaser proposal was the second lowest priced proposal in the CCtCap competition. SNC\u2019s proposal also achieved mission suitability scores comparable to the other two proposals. &nbsp;In fact, out of a possible 1,000 total points, the highest ranked and lowest ranked offerors were separated by a minor amount of total points and other factors were equally comparable.\u201d<\/p>\n<p>Even if the protest is unsuccessful, Dream Chaser will fight on.<\/p>\n<p>In tandem with their CRS2 drive, SNC is expected to work on building recent associations with commercial partners and international organizations.<\/p>\n<p>Dream Chaser currently has working agreements with the European Space Agency (ESA) and the German Space Agency (DLR), as well as associations with Japan\u2019s Space Agency (JAXA).<\/p>\n<p>\u201cWe are aggressively pursuing commercial and international paths for our program, as announced throughout the program, we will to continue to pursue these efforts,\u201d added SNC.<\/p>\n<p>(Images: L2 Content, NASA, SpaceX, SNC, Boeing. NSF and L2 are providing full transition level coverage, available no where else on the internet, from Orion and SLS to ISS and CRS\/CCP, to European and Russian vehicles.<\/p>\n<p>(Click here:&nbsp;http:\/\/www.nasaspaceflight.com\/l2\/&nbsp;\u2013 to view how you can access the best space flight content on the entire internet and directly support NASASpaceflight.com.)<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Sierra Nevada Corporation (SNC) has confirmed it will protest NASA\u2019s Commercial Crew Transportation Capability (CCtCap) contract award decision. While the protest is ongoing, the spaceplane will continue her pursuit of international partners, while a bid on the next round of commercial cargo contacts will provide additional near-term focus. Dream Chaser: SNC\u2019s talented workforce have made [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":30003,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":"","_links_to":"","_links_to_target":""},"categories":[2],"tags":[8996,4055,7893,3985,5608,970,233,8894],"class_list":["post-39497","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","tag-ccdev","tag-ccicap","tag-ccp","tag-cctcap","tag-crs2","tag-dream-chaser","tag-iss","tag-snc"],"acf":[],"_links":{"self":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/39497"}],"collection":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/comments?post=39497"}],"version-history":[{"count":0,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/39497\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/media\/30003"}],"wp:attachment":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/media?parent=39497"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/categories?post=39497"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/tags?post=39497"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}