{"id":39665,"date":"2014-01-16T22:14:55","date_gmt":"2014-01-16T14:14:55","guid":{"rendered":"https:\/\/wp-productionenv-bjg9h2g2bgg5b8aa.southeastasia-01.azurewebsites.net\/news\/dream-chaser-flies-through-another-ccicap-milestone\/"},"modified":"2014-01-16T22:14:55","modified_gmt":"2014-01-16T14:14:55","slug":"dream-chaser-flies-through-another-ccicap-milestone","status":"publish","type":"post","link":"https:\/\/starpath.global\/news\/dream-chaser-flies-through-another-ccicap-milestone\/","title":{"rendered":"Dream Chaser flies through another CCiCAP milestone"},"content":{"rendered":"<p>Sierra Nevada Corporation (SNC) successfully completed another key milestone for their Commercial Crew Integrated Capability (CCiCap) contract with NASA this week. Known as Milestone 7, the Certification Plan Review for the entire Dream Chaser Space System (DCSS) covered the vehicle\u2019s full design certification and outlined how SNC would operate its first crewed flight to the International Space Station (ISS).<\/p>\n<p>Dream Chaser Progress:<\/p>\n<p>SNC have been buoyed by a number of recent announcements, not least relating to their commercial crew efforts. Last week\u2019s announcement of a \u201ccooperative understanding\u201d with ESA and the German Space Agency (DLR) also boosted the vehicle\u2019s future potential as a multi-purpose, multi-mission spacecraft.<\/p>\n<p>The Dream Chaser Engineering Test Article (ETA) has since arrived back in her home port in Colorado, following her eventful exploits in California.<\/p>\n<p><img fetchpriority=\"high\" decoding=\"async\" class=\"alignleft\" alt=\"Z7\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2013\/10\/Z76.jpg\" width=\"348\" height=\"222\">Despite a red-faced landing for the baby orbiter, she earned her wings during an automated free flight over the famous Edwards Air Force Base, a flight that was perfectly executed, per the objectives of the Commercial Crew check list.<\/p>\n<p>The vehicle will now enjoy a period of outfitting and upgrading, preparing her for one or two more flights \u2013 listed as ALT-1 and ALT-2 \u2013 beginning later this year. Both will once again be conducted at the Dryden Flight Research Center in California.<\/p>\n<p>The ETA will never taste the coldness of space, with her role not unlike that of Shuttle Enterprise, a pathfinder vehicle used to safely refine the final part of the mission for the vehicles that will follow in her footsteps.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-32225\" alt=\"Z8\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2014\/01\/Z83.jpg\" width=\"349\" height=\"233\" srcset=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2014\/01\/Z83.jpg 349w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2014\/01\/Z83-263x175.jpg 263w\" sizes=\"(max-width: 349px) 100vw, 349px\">The Dream Chaser that will launch into orbit will be called the Orbital Test Vehicle (OTV), which is currently undergoing construction at the Michoud Assembly Facility (MAF).<\/p>\n<p>     (adsbygoogle = window.adsbygoogle || []).push({});<\/p>\n<p>Debuting atop of the United Launch Alliance (ULA) Atlas V, the&nbsp;OFT-1 (Orbital Test Flight -1) is scheduled to take place in late 2016. This flight will be automated, testing the entire Dream Chaser system, prior to the crewed OFT-2 mission in early 2017.<\/p>\n<p>The recently completed Milestone 7 in the CCiCAP requirements covers Dream Chaser\u2019s missions through to what will be a historic arrival at the orbital outpost.<\/p>\n<p>\u201cIn passing Milestone 7, the DCSS has successfully completed one of the most critical milestones on the road to Dream Chaser full design certification and outlined how SNC would operate its first crewed flight to the International Space Station (ISS),\u201d noted SNC in an announcement on Thursday.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft\" alt=\"\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2012\/10\/Z13.jpg\" width=\"350\" height=\"213\">SNC, joined by NASA, reviewed the overall certification strategy, and verification and validation activities for the DCSS. Notably, the DCSS is not just the spacecraft, but also the Atlas V launch vehicle, along with the associated ground and mission systems.<\/p>\n<p>The company added the review resulted in nearly 6,000 pages of technical support documentation, successfully meeting the exit criteria in its agreement for Milestone 7.<\/p>\n<h4 class=\"widget-title penci-border-arrow\">See Also<\/h4>\n<ul>\n<li>Commercial Crew Forum<\/li>\n<li>L2 Future&nbsp;Vehicles&nbsp;Section<\/li>\n<li>L2&nbsp;Dream Chaser&nbsp;Special<\/li>\n<li>Click here to Join L2<\/li>\n<\/ul>\n<p>\u201cThe passage of this milestone confirmed SNC\u2019s integrated certification strategy, process and plans are now complete, further documenting that the DCSS design is maturing toward compliance with the functional, performance and interface requirements to operate in its intended environments,\u201d SNC added.<\/p>\n<p>Dream Chaser is currently competing against two other main CCP contenders \u2013 SpaceX\u2019s Dragon and Boeing\u2019s CST-100 \u2013 for the honor of regaining American independence for the transportation of NASA astronauts to the International Space Station (ISS).&nbsp;NASA is currently paying hundreds of millions of dollars to Russia for seats on the Soyuz spacecraft.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft\" alt=\"Long Term Schedule, via L2\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2013\/04\/Z422.jpg\" width=\"352\" height=\"233\">That opening Commercial Crew Program (CCP) mission is called USCV-1 (US Crew Vehicle -1), currently manifested for a November 30, 2017 launch, followed by a docking on December 2, 2017 \u2013 per L2 long-range scheduling documentation.<\/p>\n<p>The USCV-2 through to USCV-6 are shown to launch at intervals of six months, with a Russian Soyuz penciled in to provide a back up role \u201cin the event the US Crewed Vehicle is unavailable\u201d through to the USCV-4 mission in 2019.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-32224\" alt=\"Z5\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2014\/01\/Z52.jpg\" width=\"350\" height=\"228\">Mark Sirangelo, corporate vice president and head of SNC\u2019s Space Systems, recently told the media he was confident his vehicle would receive the call sign of USCV-1, although Dream Chaser will have to avoid losing out in the upcoming CCP downselect process.<\/p>\n<p>Details of the downselect are sketchy, although it is understood one or two companies are likely to lose out on NASA funding. A potential scenario that has been put forward by sources claims two providers may survive, one at full funding, another with half funding \u2013 the \u201c1.5\u201d scenario. It has also been suggested that SpaceX and SNC are classed as the front runners.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft\" alt=\"Dream Chaser docking\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2013\/07\/Z714.jpg\" width=\"348\" height=\"223\">Per Thursday\u2019s announcement, Mr.&nbsp;Sirangelo remains confident Dream Chaser will continue to gain NASA support and eventually return the domestic capability lost when Atlantis closed out the Space Shuttle Program (SSP) when she landed at the Kennedy Space Center at the conclusion to STS-135.<\/p>\n<p>\u201cThe completion and validation by NASA of Milestone 7 is a major step in leading us to our first crewed, orbital flight of the Dream Chaser Space System,\u201d noted the head of SNC Space Systems. \u201cWe have now completed 70 percent of our CCiCap contract.<\/p>\n<p>\u201cWith each day, each test, and each successful milestone passing, we are moving one step closer to restoring America\u2019s place as a leader in human spaceflight building the nation\u2019s next generation crew transportation system.\u201d<\/p>\n<p>(Images via&nbsp;SNC, NASA and L2)<\/p>\n<p>(Click here:&nbsp;http:\/\/www.nasaspaceflight.com\/l2\/&nbsp;\u2013 to view how you can access the best space flight content on the entire internet and directly support NSF\u2019s running costs)<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Sierra Nevada Corporation (SNC) successfully completed another key milestone for their Commercial Crew Integrated Capability (CCiCap) contract with NASA this week. Known as Milestone 7, the Certification Plan Review for the entire Dream Chaser Space System (DCSS) covered the vehicle\u2019s full design certification and outlined how SNC would operate its first crewed flight to the [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":30297,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":"","_links_to":"","_links_to_target":""},"categories":[2],"tags":[8996,4055,7893,970,233,8894],"class_list":["post-39665","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","tag-ccdev","tag-ccicap","tag-ccp","tag-dream-chaser","tag-iss","tag-snc"],"acf":[],"_links":{"self":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/39665"}],"collection":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/comments?post=39665"}],"version-history":[{"count":0,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/39665\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/media\/30297"}],"wp:attachment":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/media?parent=39665"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/categories?post=39665"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/tags?post=39665"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}