{"id":39719,"date":"2013-11-04T17:47:55","date_gmt":"2013-11-04T09:47:55","guid":{"rendered":"https:\/\/wp-productionenv-bjg9h2g2bgg5b8aa.southeastasia-01.azurewebsites.net\/news\/morpheus-set-for-ksc-return-ahead-of-december-tests\/"},"modified":"2013-11-04T17:47:55","modified_gmt":"2013-11-04T09:47:55","slug":"morpheus-set-for-ksc-return-ahead-of-december-tests","status":"publish","type":"post","link":"https:\/\/starpath.global\/news\/morpheus-set-for-ksc-return-ahead-of-december-tests\/","title":{"rendered":"Morpheus set for KSC return ahead of December tests"},"content":{"rendered":"<p>Morpheus \u2013 an&nbsp;experimental lander project \u2013 is set to make its return to the Kennedy Space Center (KSC), ahead of the resumption of testing in December.&nbsp;Morpheus \u2013 which has conducted numerous tether tests at the Johnson Space Center (JSC) \u2013 will be hoping for a happier Florida stay, after it dramatically exploded during a previous KSC test in August, 2012.<\/p>\n<p>Project Morpheus:<\/p>\n<p>Manufactured and assembled at JSC and Armadillo Aerospace, the Morpheus system is large enough to carry 1,100 pounds of cargo to the moon \u2013 ranging from a humanoid robot, a small rover, or a small laboratory to convert moon dust into oxygen \u2013 performing all propellant burns after the trans lunar injection.<\/p>\n<p><img fetchpriority=\"high\" decoding=\"async\" class=\"alignleft\" title=\"A64\" alt=\"\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2012\/08\/A64.jpg\" width=\"321\" height=\"198\">It was heavily associated with a project to send a version of the&nbsp;Robonaut \u2013 like the one currently on the International Space Station (ISS)&nbsp;\u2013&nbsp; to the Moon.&nbsp;This was known as Project M&nbsp;(documentation available in L2).<\/p>\n<p>This notional mission would see the robot and lander launched from KSC on a commercial expendable launch vehicle and inserted into a trans-lunar trajectory.<\/p>\n<p>Once at the moon, the spacecraft would be inserted into a low lunar orbit where it would orbit until ready to perform the entry, descent, and landing (EDL).<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft\" alt=\"\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2012\/08\/Z35.jpg\" width=\"353\" height=\"269\">The focus of the project is now aimed more at&nbsp;Morpheus being a vertical test bed demonstrating green propellant propulsion systems and autonomous landing and hazard detection technology.<\/p>\n<p>The system is a prototype lander engineers can use to integrate technologies for future spacecraft that could land on a variety of destinations in our solar system.<\/p>\n<p>NASA mission updates<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>NASA educational resources<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>Spaceflight<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>\n<p>     (adsbygoogle = window.adsbygoogle || []).push({});<\/p>\n<p>Working on the fine-tuning of the vehicle\u2019s&nbsp;control and stability, 19 tethered tests were conducted on&nbsp;Morpheus through to 2012 at JSC.<\/p>\n<p>Morpheus then made its way to the Shuttle Landing Facility (SLF) at KSC, ahead of attempting its&nbsp;first free flight over a specially constructed hazard field of craters and rocks at the end of the runway.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft\" alt=\"Z3\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2013\/11\/Z31.jpg\" width=\"350\" height=\"214\">However, the test \u2013 conducted in August of last year \u2013 did not go to plan, as the vehicle\u2019s&nbsp;Thrust Vector Control (TVC) system suffer a major malfunction, sending it into a roll, prior to crashing into the ground.<\/p>\n<p>Although SLF fire crews were on hand, the pressurized system could not be approached as it laid crippled on the site. Eventually, the fire breached the pressurized fuel tanks, resulting in it exploding.<\/p>\n<p>The Morpheus team, now combined with the&nbsp;Autonomous Landing Hazard Avoidance Technology&nbsp;(ALHAT) team members, were then directed to build the&nbsp;Morpheus 1.5B and 1.5C vehicles, ahead of a return to&nbsp;static hot fire and dynamic tethered flight tests at JSC in early 2013.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-31366\" alt=\"Z4\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2013\/11\/Z41.jpg\" width=\"350\" height=\"235\">At the end of October, the lander\u2019s engine was successfully ignited six times in a row, with each burn lasted 600 milliseconds. This period of testing has been challenging, resulting in the test schedule at KSC to be delayed several times.<\/p>\n<p>Per L2 information, the latest schedule calls for the Morpheus to arrive at KSC for offload at the T-Shelter on November 12.<\/p>\n<p>Should this schedule hold, a Dry Run will be conducted on December 3, followed by a Wet Run the following day.<\/p>\n<h4 class=\"widget-title penci-border-arrow\">See Also<\/h4>\n<ul>\n<li>Morpheus Test Coverage<\/li>\n<li>L2 Future Vehicles Section<\/li>\n<li>Click here to Join L2<\/li>\n<\/ul>\n<p>A Test Readiness Review will then precede the first tether test at the SLF on December 6, allowing for a series of three&nbsp;Free Flight Operations during the middle of December, ahead of a potential first flight campaign on December 18.<\/p>\n<p>Should the testing all go to plan,&nbsp;Morpheus can then directly contribute to numerous technology goals. After all,&nbsp;Morpheus is designed as a full spacecraft system, with all the associated subsystems: avionics; software; guidance, navigation and control; power; power distribution; structures; propulsion; and instrumentation.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft\" alt=\"\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2012\/08\/A103.jpg\" width=\"350\" height=\"311\">The system is also associated with the efforts relating to in-space propellant transfer, not least because Morpheus utilizes the propellant of choice for future missions that would&nbsp;utilize in-space refueling and\/or depots.<\/p>\n<p>In addition, the lander has all the systems required for automated rendezvous and docking.<\/p>\n<p>With modification of the propellant and pressurization system for transfer plumbing and a docking mechanism that meets the international docking standard, two landers could rendezvous in low Earth orbit and demonstrate all the key technologies required for in-space propellant transfer and storage of mid-temperature range cryogenic propellants.<\/p>\n<p>Specific missions for a matured Morpheus project are as yet unknown, although the team recently noted they hope to scale the 500&nbsp;kg payload lander up to produce one able to land a habitat with a crew on places such as the Moon \u2013 as much as that would likely be in support of a commercial mission, now NASA\u2019s leadership have completely ruled out a crewed return to the Moon.<\/p>\n<p>(Images:&nbsp;Via L2 content. Other images via NASA)<\/p>\n<p>(L2 is \u2013 as it has been for the past several years \u2013 providing full exclusive SLS and Exploration Planning coverage. &nbsp;To join L2, click here:&nbsp;http:\/\/www.nasaspaceflight.com\/l2\/)<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Morpheus \u2013 an&nbsp;experimental lander project \u2013 is set to make its return to the Kennedy Space Center (KSC), ahead of the resumption of testing in December.&nbsp;Morpheus \u2013 which has conducted numerous tether tests at the Johnson Space Center (JSC) \u2013 will be hoping for a happier Florida stay, after it dramatically exploded during a previous [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":30293,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":"","_links_to":"","_links_to_target":""},"categories":[2],"tags":[7766,1452,9004],"class_list":["post-39719","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","tag-ksc","tag-morpheus","tag-slf"],"acf":[],"_links":{"self":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/39719"}],"collection":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/comments?post=39719"}],"version-history":[{"count":0,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/39719\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/media\/30293"}],"wp:attachment":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/media?parent=39719"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/categories?post=39719"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/tags?post=39719"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}