{"id":39741,"date":"2013-10-08T19:34:20","date_gmt":"2013-10-08T11:34:20","guid":{"rendered":"https:\/\/wp-productionenv-bjg9h2g2bgg5b8aa.southeastasia-01.azurewebsites.net\/news\/industry-leaders-claim-sls-capability-could-create-new-missions\/"},"modified":"2013-10-08T19:34:20","modified_gmt":"2013-10-08T11:34:20","slug":"industry-leaders-claim-sls-capability-could-create-new-missions","status":"publish","type":"post","link":"https:\/\/starpath.global\/news\/industry-leaders-claim-sls-capability-could-create-new-missions\/","title":{"rendered":"Industry leaders claim SLS capability could create new missions"},"content":{"rendered":"<p>Leaders of several major space industry companies have claimed that the unrivalled capability of the Space Launch System (SLS) may create a demand for additional missions, that will in turn increase the flight rate. Speaking at the 6th Wernher von Braun Memorial Symposium, a heavyweight panel of experts spoke of their optimism that SLS may launch up to twice per year.<\/p>\n<\/p>\n<p>SLS Flight Rate:<\/p>\n<p>SLS will debut in 2017 \u2013 a date created due to political language to support a potential switch to a contingency crew resupply mission to the International Space Station (ISS) \u2013 on what is known as Exploration Mission -1 (EM-1), a flight that originally tasked SLS with a validation mission to loft Orion on a trip around the Moon.<\/p>\n<p><img fetchpriority=\"high\" decoding=\"async\" class=\"alignleft size-full wp-image-31088\" alt=\"Z10\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2013\/10\/Z101.jpg\" width=\"351\" height=\"241\">This mission has since been placed under a \u201cChange Request\u201d \u2013 calling for the replacement of the original Uncrewed \u201cLunar Flyby Tactical DRM (Design Reference Mission)\u201d with a \u201cDistant Retrograde Orbit (DRO) Tactical DRM\u201d, citing the mission would directly aid the new EM-2 asteroid objectives.<\/p>\n<p>EM-2 was changed from a crewed version of the original EM-1 flight \u2013 to become part of the Asteroid Redirect Crewed Mission (ARCM) \u2013 earlier this year, all part of President Obama\u2019s vision of getting hands on with an asteroid prior to the middle of the next decade.<\/p>\n<p>However, that is where the officially manifested missions end, leaving SLS \u2013 at least in the eyes of the public \u2013 as a huge monster rocket, costing billions of dollars and only flying twice in four years.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-31078\" alt=\"Z53\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2013\/10\/Z53.jpg\" width=\"351\" height=\"261\">Additional missions are being planned, with L2 sources noting EM-3 is set to become a long-duration mission to an asteroid located in deep space.<\/p>\n<p>Space Shuttle<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>Space tourism guides<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>Spaceflight news subscription<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>\n<p>     (adsbygoogle = window.adsbygoogle || []).push({});<\/p>\n<p>Such a mission would stretch NASA\u2019s understanding on how to complete a long-duration crewed mission ahead of potential missions to Mars in the 2030s.<\/p>\n<p>Also, EM-3 is being planned as the fourth, or fifth \u2013 pending the requirement of additional supporting hardware having to be launched first \u2013 SLS mission, along with the first use of the upgraded 105mT SLS Block 1A or B.<\/p>\n<p>While the gap between EM-1 and EM-2 is \u2013 by nature of the law to support the ISS \u2013 a gap that is unlikely to change, the current drive is to fill out the manifest in the 2020s.<\/p>\n<p>The question about how the manifest could be beefed up was raised at the Wernher von Braun Memorial Symposium on Tuesday, aimed at a panel of space industry leaders, most of whom are directly involved in the SLS Program.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-31082\" alt=\"Z4\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2013\/10\/Z45.jpg\" width=\"350\" height=\"227\">\u201cWe do need a higher flight rate when the vehicle is ready to go,\u201d noted Charlie Precourt, Vice President &amp; General Manager, Space Launch Division, Aerospace Group, ATK.<\/p>\n<p>\u201cYou see these evolving missions that people are asking about and I think we\u2019re going to be able to fly one or two (SLS missions) per year.<\/p>\n<p>\u201cThat would see the benefits of a lower fixed cost on one end and more interesting, deep reaching and inspiring missions on the other end, that would motivate us to fly more often.\u201d<\/p>\n<h4 class=\"widget-title penci-border-arrow\">See Also<\/h4>\n<ul>\n<li>SLS Forum Section<\/li>\n<li>L2 SLS Section<\/li>\n<li>Click here to Join L2<\/li>\n<\/ul>\n<p>One of the main criticisms of the SLS plan relates to the vehicle being developed without its range of missions, or payloads, already in place. However, that was countered by Mark Kinnersley, Director, MPCV ESM Resident Liaison, Astrium North America Inc.<\/p>\n<p>\u201cI\u2019ve been involved in introducing a new launch vehicle and there weren\u2019t any missions for it. But because the vehicle became available we suddenly enabled a multitude of missions. I think these ideas (new missions) will come about as SLS matures.\u201d<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-31083\" alt=\"Z45\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2013\/10\/Z451.jpg\" width=\"350\" height=\"262\">Another concern is based on the cost of the launch vehicle placing a stranglehold on funding for the payloads it could launch. However, panel members believe that the capability of SLS may prove to be attractive to science organizations by vastly reducing the mission timescales for scientific exploration.<\/p>\n<p>\u201cOne of the things that we forget about is that when you have a capability, people say the payloads are going to be so expensive, where are we going to get the money?\u201d Jim Crocker, Vice President and General Manager, Civil Space, Lockheed Martin Space Systems Company noted.<\/p>\n<p>\u201cWhen you have that capability, you can substitute that capability for expense, or you can get some other advantage. Think about outer planet exploration, (such as) with today\u2019s launch vehicles it can take a decade to get out to the outer planets.<\/p>\n<p>\u201cImagine the science return with SLS, where we can get there within a few years and how that can accelerate scientific discovery.\u201d<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-31084\" alt=\"Z84\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2013\/10\/Z84.jpg\" width=\"350\" height=\"265\">SLS managers have already made attempts to court potential science missions, with L2 notes showing they have been working alongside the Jet Propulsion Laboratory (JPL) on a notional science mission to the Jupiter moon, Europa. However, this was an exercise, as opposed to the opening plans for an action mission.<\/p>\n<p>SLS managers have also touted missions involving the return of samples from Mars. This too is classed as highly notional.<\/p>\n<p>However, the panel members believe there are a number of possibilities, with claims the payloads could be less expensive if launched on the multi-billion dollar HLV.<\/p>\n<p>\u201cWe don\u2019t know what we\u2019re going to find in science, but we do know that if you find it sooner, you get a much higher science return for your investment,\u201d added Mr. Crocker. \u201cWe\u2019ve looked at other low cost innovative ways for science payloads that could be much less expensive than if you had them on a smaller rocket.\u201d<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-31085\" alt=\"Z45\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2013\/10\/Z452.jpg\" width=\"349\" height=\"256\">Citing how the previous monster rocket in NASA\u2019s stable, the Saturn V, was capable of lofting Skylab into orbit in one launch, Mr. Crocker believes the huge capability of SLS will open up new possibilities.<\/p>\n<p>\u201cSomeone reminded me that up until the last two modules were put up on the ISS (via Shuttle), Skylab had more crew volume. Skylab was done with one Saturn V. Sometimes it requires re-thinking of what you\u2019re doing.\u201d<\/p>\n<p>The panel also touched upon how they are streamlining their processing and manufacturing capabilities for SLS, in order to drive down the costs and increase the value of their responsibilities (or contracts) with the Heavy Lift Launch Vehicle (HLV).<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-31086\" alt=\"A3171\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2013\/10\/A3171.jpg\" width=\"350\" height=\"234\" srcset=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2013\/10\/A3171.jpg 350w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2013\/10\/A3171-263x175.jpg 263w\" sizes=\"(max-width: 350px) 100vw, 350px\">\u201cFor SLS, we\u2019re doing the entire booster. not just the motors,\u201d noted former Shuttle commander, Mr. Precourt.<\/p>\n<p>\u201cIf you recall from Shuttle, the United Space Alliance (USA) did the Aft Skirt, Trust Vector Control (TVC), Frustum and Avionics. We\u2019re doing all of that now, for less than one third of the workforce that we used for the motors in the past.\u201d<\/p>\n<p>The streamlining also relates to SLS\u2019 primary payload, the Orion spacecraft, with contractor Lockheed Martin adding they have already practised processing flows via simulation work inside the Collaborative Human Immersive Lab (CHIL) in Denver, ahead of implementing them at the Kennedy Space Center (KSC).<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-31081\" alt=\"Z312\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2013\/10\/Z312.jpg\" width=\"351\" height=\"235\" srcset=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2013\/10\/Z312.jpg 351w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2013\/10\/Z312-263x175.jpg 263w\" sizes=\"(max-width: 351px) 100vw, 351px\">\u201cWith the Orion vehicle, it\u2019s designed to re-fly, to be refurbished,\u201d added Mr. Crocker. \u201cA lot of attention was paid to processing, so that we could do that quickly and efficiently in the O&amp;C.\u201d<\/p>\n<p>The O&amp;C (otherwise known as the Operations &amp; Checkout Building) will be the equivalent of the Orbiter Processing Facility (OPF) for Orion, with the spacecraft set to be processed inside the refurbished building before and after its missions.<\/p>\n<p>The first Orion, set to fly in one year\u2019s time, is currently being prepared for its Exploration Flight Test -1 (EFT-1) mission. SLS remains on track for its 2017 debut, with around five months of margin.<\/p>\n<p>(Images:&nbsp;Via L2 content from&nbsp;L2\u2019s SLS specific L2 section, which includes, presentations, videos, graphics and internal \u2013 interactive with actual SLS engineers \u2013 updates&nbsp;on the SLS and HLV, available on no other site. Other images via NASA, Boeing and ATK)<\/p>\n<p>(L2 is \u2013 as it has been for the past several years \u2013 providing full exclusive SLS and Exploration Planning coverage. &nbsp;To join L2, click here:&nbsp;http:\/\/www.nasaspaceflight.com\/l2\/)<\/p>\n<p>*Don\u2019t forget to tweet and share this article by using the options below*<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Leaders of several major space industry companies have claimed that the unrivalled capability of the Space Launch System (SLS) may create a demand for additional missions, that will in turn increase the flight rate. Speaking at the 6th Wernher von Braun Memorial Symposium, a heavyweight panel of experts spoke of their optimism that SLS may [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":30311,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":"","_links_to":"","_links_to_target":""},"categories":[2],"tags":[9034,624],"class_list":["post-39741","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","tag-hlv","tag-sls"],"acf":[],"_links":{"self":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/39741"}],"collection":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/comments?post=39741"}],"version-history":[{"count":0,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/39741\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/media\/30311"}],"wp:attachment":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/media?parent=39741"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/categories?post=39741"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/tags?post=39741"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}