{"id":39827,"date":"2013-06-20T01:40:34","date_gmt":"2013-06-19T17:40:34","guid":{"rendered":"https:\/\/wp-productionenv-bjg9h2g2bgg5b8aa.southeastasia-01.azurewebsites.net\/news\/nasa-authorization-act-pushes-for-moon-and-mars-priority\/"},"modified":"2013-06-20T01:40:34","modified_gmt":"2013-06-19T17:40:34","slug":"nasa-authorization-act-pushes-for-moon-and-mars-priority","status":"publish","type":"post","link":"https:\/\/starpath.global\/news\/nasa-authorization-act-pushes-for-moon-and-mars-priority\/","title":{"rendered":"NASA Authorization Act pushes for Moon and Mars priority"},"content":{"rendered":"<p>The House Science space subcommittee\u2019s 2013 Authorization Act intends to refocus NASA\u2019s exploration path towards prioritizing the goal of landing humans on both the Moon and Mars, according to draft document. Ahead of a hearing on Wednesday, the political direction also pours cold water on the realigned Exploration Mission -2 (EM-2) to explore a captured asteroid.<\/p>\n<p>\nNASA Exploration Path:<\/p>\n<p>In 2004, President Bush announced the Vision For Space Exploration (VSE). The plan revolved around a \u201cMoon, Mars and Beyond\u201d roadmap, before it eventually fell by the wayside as the Constellation Program (CxP) failed.<\/p>\n<p>Rising out of the CxP\u2019s ashes, the current plan continues to have an end goal of reaching Mars, albeit much later than the VSE\u2019s proposed schedule. In fact, very little by way of specifics have been revealed into the schedule, other than the aim is to land humans on the Red Planet by the \u201cmid 2030s\u201d.<\/p>\n<h4 class=\"widget-title penci-border-arrow\">See Also<\/h4>\n<ul>\n<li>Space Policy Forum<\/li>\n<li>L2 SLS Section<\/li>\n<li>L2 Orion Section<\/li>\n<li>Click here to Join L2<\/li>\n<\/ul>\n<p>With the Space Launch System (SLS) and Orion as the centerpiece of NASA\u2019s Beyond Earth Orbit (BEO) ambitions, a 2017 test flight will validate the launch vehicle and spacecraft during Exploration Mission -1 (EM-1) \u2013 an uncrewed mission to send&nbsp;Orion&nbsp;on a test flight around the Moon, ahead of Exploration Mission -2 (EM-2). which involves sending a crewed Orion on a mission to meet up with a captured asteroid in the vicinity of the Moon.<\/p>\n<p>An undefined manifest follows, although the aim would be to venture further out into deep space for a \u201cfull up\u201d Near Earth Asteroid (NEA) mission(s), before taking the big step towards Mars itself.<\/p>\n<p>From NASA\u2019s standpoint, a return to the surface of the Moon was cancelled when the Constellation Program (CxP) ended. However, notional plans continued to be evaluated over recent years, with Lunar Surface Sortie missions cited in the Exploration Roadmap via Design Reference Mission (DRM) documentation.<\/p>\n<p><img fetchpriority=\"high\" decoding=\"async\" class=\"alignleft\" title=\"NASA Lunar Lander\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2012\/03\/Z621.jpg\" alt=\"NASA Lunar Lander\" width=\"348\" height=\"241\">Documentation placed the potential for such NASA missions to the moon within the ESD Concept Of Operations (Con Ops) presentations (L2) \u2013 listing it alongside the main NEA (Eear Earth Asteroid) missions under the Architectural Timeframe DRMs.<\/p>\n<p>SpaceX launch tickets<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>Space Shuttle<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>Aerospace industry analysis<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>\n<p>     (adsbygoogle = window.adsbygoogle || []).push({});<\/p>\n<p>\u201cLunar Surface Sortie (LSS):&nbsp; Lands four crew members on the surface of the Moon in the equatorial or Polar Regions and returns them to Earth,\u201d noted the presentation.<\/p>\n<p>\u201cExpected drivers include: MPCV operations in LLO environment, MPCV uncrewed ops phase, MPCV delta V requirements, RPOD (Rendezvous, Proximity Operations and Docking), MPCV number of habitable days.\u201d<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft\" title=\"Atlair from the Constellation Program with Ares V Fairing\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2012\/03\/Z511.jpg\" alt=\"Atlair from the Constellation Program with Ares V Fairing\" width=\"349\" height=\"220\">As with any Moon return plan, the Lunar Lander \u2013 either a&nbsp;resurrection of the Altair lander or another option \u2013 would be a key element of the viability&nbsp;for returning to the Moon \u2013 although NASA\u2019s lander would be far larger and would require the Space Launch System (SLS) to launch it into space. It would also be massively expensive.<\/p>\n<p>\u201cLunar Lander: Transports crew to\/from the Lunar surface and supports crew for short duration surface stays. Sortie two-module configuration has Descent Module (DM) and Ascent Module (AM). AM includes Suit Ports and a side hatch opening to the lander deck. Crew equipment, supplies, and consumables stowed in the AM,\u201d added ESD\u2019s Con Ops presentation.<\/p>\n<p>\u201cA three-module vehicle configuration for extended stays consists of the DM, the AM, and a Suit Lock\/ Suit Port (SL) module.\u201d<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft\" title=\"Altair Lander via L2 Documentation\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2012\/03\/Z413.jpg\" alt=\"Altair Lander via L2 Documentation\" width=\"326\" height=\"222\">As listed in the Con Ops, Lunar Surface missions \u2013 based on just SLS related hardware \u2013 would involve two Block 1A SLS vehicles, launching 121 days apart. The first SLS would launch the Lunar Lander, with a Block 1 CPS, followed by the second SLS launching a crew of four on Orion for a 19 day mission, with seven days on the Moon.<\/p>\n<p>However, any hope of the Lunar Surface option making a confirmed return to the exploration roadmap\u2019s baseline was dismissed by&nbsp;NASA Administrator Charlie Bolden, who strongly ruled out missions to land on the Moon, claiming any future political re-direction to return humans to the lunar surface would send the Agency \u201cback to square one\u201d.<\/p>\n<p>That re-direction now appears to be on the cards, per the House Science space subcommittee\u2019s 2013 Authorization Act, with a proposed draft for discussion outlining direction to focus on landing on the Moon as a precursor for landing on Mars. It also appears to remove \u2013 or at least show no funding for \u2013 the EM-2 Asteroid Retrieval Mission elements from the roadmap.<\/p>\n<p>Although politically worded, a clear signal is sent throughout the draft, that the NASA Administrator \u201cshall establish a program to develop a sustained human presence on the Moon and the surface of Mars.\u201d<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-29651\" title=\"General Bolden\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2013\/06\/Z82.jpg\" alt=\"General Bolden\" width=\"346\" height=\"361\" srcset=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2013\/06\/Z82.jpg 346w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2013\/06\/Z82-335x350.jpg 335w\" sizes=\"(max-width: 346px) 100vw, 346px\">This is unlikely to be well received by General Bolden, who added to his concerns relating to a political re-direction to return to the Moon, claiming such a move would all-but end any chance of being able to go to Mars by the 2030s.<\/p>\n<p>\u201cWe need to try and get all of us on to the same sheet of music in terms of the roadmap,\u201d noted the NASA head in May of this year. \u201c(If we) have someone in the next administration who could take us back to a human lunar mission, it\u2019s all over, we will go back to square one.<\/p>\n<p>\u201cI believe (that would mean we) would have missed the second greatest opportunity for humanity to go on to deep space and do what humans have wanted to do for hundreds of years.\u201d<\/p>\n<p>According to the House version of the 2013 Authorization Act draft, a request would be made for the creation of a Mars Human Exploration Roadmap.<\/p>\n<p>\u201cThe Administrator shall direct the Human Exploration and Operations Mission Directorate to develop a Mars Human Exploration Roadmap to define the specific capabilities and technologies necessary to extend human presence to the surface of Mars and the mission sets required to demonstrate these capabilities and technologies.\u201d<\/p>\n<p>The draft language also states the Administrator should present the Roadmap within one year of the Act\u2019s enactment.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-29652\" title=\"VASIMR Mars Vehicle\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2013\/06\/Z94.jpg\" alt=\"VASIMR Mars Vehicle\" width=\"347\" height=\"245\">The roadmap should \u201cinclude the specific set of capabilities and technologies required to extend human presence to the surface of Mars and the mission sets necessary to demonstrate the proficiency of these capabilities and technologies.<\/p>\n<p>\u201c(This should include) an emphasis on using the International Space Station, lunar landings, cis-lunar space, trans-lunar space, Lagrangian points and the natural satellites of Mars, Phobos and Deimos, as testbeds, as necessary, and shall include the most appropriate process for developing such capabilities and technologies.\u201d<\/p>\n<p>The draft also requests details on international cooperation and the potential for utilizing&nbsp;non-governmental entities. It also requests the Administrator should update the Roadmap at least every four years and include it in the budget for that fiscal year transmitted to Congress.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft\" title=\"Mars Missions per DRM, via L2\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2012\/01\/Z151.jpg\" alt=\"Mars Missions per DRM, via L2\" width=\"351\" height=\"116\">Per the DRM process at NASA, Mars missions are only listed under \u201cForward Work\u201d \u2013 with the DRM tags of MAR_PHD_1A and MAR_SFC_1A.<\/p>\n<p>Notably, the Flexible Path approach remains the most recent and comprehensive outline into achieving a crewed mission to Mars, built out of the recommendations from the Augustine Committee into Human Space Flight.<\/p>\n<p>\u201cA human Mars Orbit\/Phobos Mission represents an intermediate step between human exploration missions in near-Earth space and human missions to explore the surface of Mars,\u201d opened the expansive section on the manned missions to Mars\/Phobos in the 65 page NASA internal \u201cFlexible Path\u201d presentation (available to download&nbsp;in L2 \u2013 Link).<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft\" title=\"Phobos\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2012\/01\/Z412.jpg\" alt=\"Phobos\" width=\"351\" height=\"247\">A Phobos mission \u2013 used as a precursor to a crewed mission to Mars \u2013 may be the main initial focus by proxy, primarily from two standpoints; a learning curve for a future mission to Mars, and the Mars science that can be gained from Phobos.<\/p>\n<p>Phobos also presents a number of Mars-like challenges to a manned mission, allowing NASA engineers and astronauts to learn how to approach a subsequent Mars mission.<\/p>\n<p>\u201cOne of the significant advantages a Phobos mission would be to demonstrate many of the technical and operational approaches needed for Mars missions without yet having all the required systems, or committing the crew to a full-duration surface stay,\u201d added the presentation.<\/p>\n<p>\u201cA Phobos mission could drive and demonstrate solutions of these items.\u201d<\/p>\n<p>Per documentation, a fleet of SLS\u2019 would be required for a single crewed mission to Mars mission, including other numerous vehicles, most of which are very much at the conceptual stage of design.<\/p>\n<p>NASA Glenn teams are understood to be&nbsp;reworking a baseline video into a Mars mission (Nine minute CGI video available on L2 \u2013 Link), in order to provide a general baseline using SLS \u2013 a video which already shows the challenges of an actual crewed mission to Mars.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft\" title=\"SLS Block II configuration\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2012\/01\/Z58.jpg\" alt=\"SLS Block II configuration\" width=\"350\" height=\"235\">Currently, there isn\u2019t an agreed baseline approach for setting up a mission to Mars, with the Flexible Path noting the requirement of 10-15 HLV launches \u2013 via the use of chemical (LH2\/LOX)&nbsp;rockets, while the video shows a launch campaign using seven HLVs,&nbsp;sporting nuclear propulsion stages.<\/p>\n<p>\u201cDue to the wide variability of the short stay class trajectories the number of propulsive stages varies with opportunity, as will the number of HLV launches. Assuming hydrogen-oxygen in-space propulsion, the number of HLV launches varies between 10 and 15,\u201d noted the Flexible Path approach.<\/p>\n<p>The Mars campaign video shows seven HLVs launching the major elements of three vehicles using NTR (Nuclear Thermal Rocket) propulsion, namely the MLV Cargo Vehicle \u2013 created from two HLV launches, the MLV Habitat Vehicle \u2013 created from two HLV launches, and the MTV Crew Transfer Vehicle \u2013 created from three HLV launches. All three vehicles are assembled in Low Earth Orbit ahead of setting sail for Mars.<\/p>\n<p>Another Mars exploration plan was created by Boeing, citing a combination of the SLS rocket\u2019s lift capability, the bourgeoning Solar Electric Propulsion (SEP) technology field, and Bigelow\u2019s soon-to-be-tested inflatable habitat modules.<\/p>\n<p>Additional details in the proposed political direction from the House are expected at Wednesday\u2019s Hearing. You can follow updates on the hearing, by clicking this link.<\/p>\n<p>(Images: Via L2 content, NASA and Boeing)<\/p>\n<p>(To join L2, support NSF and access 5,000+ gbs of exclusive content&nbsp;\u2013&nbsp;added to on a daily basis \u2013&nbsp;click here: http:\/\/www.nasaspaceflight.com\/l2\/)<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The House Science space subcommittee\u2019s 2013 Authorization Act intends to refocus NASA\u2019s exploration path towards prioritizing the goal of landing humans on both the Moon and Mars, according to draft document. Ahead of a hearing on Wednesday, the political direction also pours cold water on the realigned Exploration Mission -2 (EM-2) to explore a captured [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":30315,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":"","_links_to":"","_links_to_target":""},"categories":[2],"tags":[9034,367,625,8969,640,624],"class_list":["post-39827","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","tag-hlv","tag-mars","tag-moon","tag-nea","tag-orion","tag-sls"],"acf":[],"_links":{"self":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/39827"}],"collection":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/comments?post=39827"}],"version-history":[{"count":0,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/39827\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/media\/30315"}],"wp:attachment":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/media?parent=39827"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/categories?post=39827"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/tags?post=39827"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}