{"id":39842,"date":"2013-05-27T20:47:52","date_gmt":"2013-05-27T12:47:52","guid":{"rendered":"https:\/\/wp-productionenv-bjg9h2g2bgg5b8aa.southeastasia-01.azurewebsites.net\/news\/eft-1-delta-iv-h-set-for-shipping-to-florida-next-march\/"},"modified":"2013-05-27T20:47:52","modified_gmt":"2013-05-27T12:47:52","slug":"eft-1-delta-iv-h-set-for-shipping-to-florida-next-march","status":"publish","type":"post","link":"https:\/\/starpath.global\/news\/eft-1-delta-iv-h-set-for-shipping-to-florida-next-march\/","title":{"rendered":"EFT-1: Delta IV-H set for shipping to Florida next March"},"content":{"rendered":"<p>The United Launch Alliance (ULA) Delta IV Heavy \u2013 that is set to launch the Exploration Flight Test -1 (EFT-1) Orion into space next year \u2013 has passed the 50 percent mark in its fabrication process in Alabama. The vehicle will be shipped to the Florida Space Coast next March, ahead of its September, 2014 launch date.<\/p>\n<\/p>\n<p>EFT-1:<\/p>\n<p>The ULA rocket will be tasked with lofting the first space-bound Orion on a several hour flight to an altitude of more than 3,600 miles, prior to a return to Earth on a high-speed re-entry at more than 20,000 mph.<\/p>\n<p><img fetchpriority=\"high\" decoding=\"async\" class=\"alignleft size-full wp-image-29413\" title=\"EFT-1 Orion with DCSS\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2013\/05\/Z317.jpg\" alt=\"EFT-1 Orion with DCSS\" width=\"350\" height=\"234\" srcset=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2013\/05\/Z317.jpg 350w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2013\/05\/Z317-263x175.jpg 263w\" sizes=\"(max-width: 350px) 100vw, 350px\">The most intense loads on this flight will occur during ascent, first stage separation, launch abort system jettison, parachute deployment and landing, with the test allowing NASA to evaluate Orion\u2019s performance and integrity in preparation for the spacecraft\u2019s future deep-space expeditions.<\/p>\n<p>The EFT-1 data will also be a key driver during Orion\u2019s key Critical Design Review (CDR) that will follow the test flight in the middle of 2015.<\/p>\n<p>Following the completion of the CDR, the next Orion will be prepared for the Exploration Mission -1 (EM-1) flight, conducted via the debut launch of the Space Launch System (SLS).<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-29416\" title=\"SLS Launch\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2013\/05\/Z618.jpg\" alt=\"SLS Launch\" width=\"351\" height=\"222\">This mission is currently set for December, 2017 \u2013 although L2 information notes recent estimations currently place the launch window opportunities in a night launch stance, which would be undesirable for what is a test flight. As such, the mission may be moved to day launch opportunities the following Spring.<\/p>\n<p>Space Shuttle<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>Company News<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>SpaceX<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>\n<p>     (adsbygoogle = window.adsbygoogle || []).push({});<\/p>\n<p>The first crewed mission with Orion and SLS will be Exploration Mission -2 (EM-2) in either 2020 or 2021. This mission was set to be a slightly extended version of EM-1\u2019s trip around the Moon, prior to its realignment into an ambitious asteroid rendezvous and sample mission.<\/p>\n<p>Following several slips over the past few years, EFT-1\u2019s September, 2014 launch date is now holding firm, with all the hardware associated with the mission in various stages of production and processing.<\/p>\n<h4 class=\"widget-title penci-border-arrow\">See Also<\/h4>\n<ul>\n<li>Orion Forum Section<\/li>\n<li>L2 Orion Section<\/li>\n<li>Click here to Join L2<\/li>\n<\/ul>\n<p>A level of confusion surrounded last year\u2019s slip to September, 2014, with a NASA Aerospace Safety Advisory Panel (ASAP) meeting claiming the \u201cpacing element\u201d was the Delta IV-H.<\/p>\n<p>\u201cEFT-1 is scheduled for September 2014. The pacing element for this flight is the surrogate launch vehicle; the capsule itself is well on the path to testing,\u201d noted minutes from their discussions at the Johnson Space Center last year.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-29417\" title=\"EFT-1 Orion with Delta IV-H\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2013\/05\/Z451.jpg\" alt=\"EFT-1 Orion with Delta IV-H\" width=\"350\" height=\"265\">At the time, the comments appeared to match notes acquired a few months previous, which also pointed a finger at the Delta IV-H \u2013 as opposed to the EFT-1 Orion \u2013 as the main scheduling item. However, ULA claimed they were on track for the previous spring launch date for EFT-1.<\/p>\n<p>\u201cThe LV for EFT-1 is in our production and launch queue and production is underway. The projected launch date has been agreed to between ULA, LM (Lockheed Martin) and NASA and ULA (and) is on track,\u201d noted noted Dr George Sowers, ULA VP for Human Launch Services, during a Q&amp;A session with NASASpaceFlight.com members.<\/p>\n<p>\u201cIf Orion is planning to a (different) date, that is prudent since it\u2019s the first flight for the spacecraft and there\u2019s more risk. The Delta IV rocket, on the other hand, is a mature product.\u201d<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-29414\" title=\"EFT-1 Delta IV-H under construction, Spring, 2013 - via L2\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2013\/05\/Z418.jpg\" alt=\"EFT-1 Delta IV-H under construction, Spring, 2013 - via L2\" width=\"349\" height=\"227\">Interestingly, information acquired via L2 confirms the Delta IV-H only recently passed the 50 percent point in its fabrication process, pacing it for a shipping from the Decatur plant in Alabama next March.<\/p>\n<p>\u201cIn addition to significant progress on the powerful rocket\u2019s assembly and production, Launch, Mission Integration and Support activities are well underway at Kennedy Space Center (KSC) in Florida,\u201d the update noted.<\/p>\n<p>\u201cThe EFT-1 launch vehicle major assemblies will be delivered to KSC in March 2014, with stacking on the launch pad beginning in July.\u201d<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-29415\" title=\"EFT-1 Delta IV-H Under Construction, Spring, 2013 - via L2\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2013\/05\/Z515.jpg\" alt=\"EFT-1 Delta IV-H Under Construction, Spring, 2013 - via L2\" width=\"350\" height=\"243\">Photos (L2) of the EFT-1 Delta IV-H show the vehicle undergoing its fabrication effort on the propulsion tankage for the rocket\u2019s four major components: Center Common Booster Core (CBC), Port CBC, Starboard CBC, and the DCSS (Upper Stage).<\/p>\n<p>The major work on the vehicle involves the friction stir welding process for the tank longitudinal welds and plasma arc welding for the circumferential welds. Similar processes were employed for the External Tanks during their production at the Michoud Assembly Facility (MAF), along with other vehicles.<\/p>\n<p>This process ensures optimal structural integrity for the intense loading that the vehicles endure during their ride uphill.<\/p>\n<p>After the EFT-1 tank skins are friction stir welded, the tanks will then undergo insulation installation, receive their coat of paint, prior to final assembly and shipping to Florida.<\/p>\n<p>(NSF and&nbsp;L2 are providing full future vehicle coverage, available no where else on the internet, from Orion and SLS to ISS and COTS\/CRS\/CCDEV, to European and Russian vehicles.)<\/p>\n<p>(Click here to join L2: http:\/\/www.nasaspaceflight.com\/l2\/&nbsp;)<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The United Launch Alliance (ULA) Delta IV Heavy \u2013 that is set to launch the Exploration Flight Test -1 (EFT-1) Orion into space next year \u2013 has passed the 50 percent mark in its fabrication process in Alabama. The vehicle will be shipped to the Florida Space Coast next March, ahead of its September, 2014 [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":29994,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":"","_links_to":"","_links_to_target":""},"categories":[2],"tags":[8535,3688,640,624,363],"class_list":["post-39842","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","tag-delta-iv-h","tag-eft-1","tag-orion","tag-sls","tag-ula"],"acf":[],"_links":{"self":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/39842"}],"collection":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/comments?post=39842"}],"version-history":[{"count":0,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/39842\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/media\/29994"}],"wp:attachment":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/media?parent=39842"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/categories?post=39842"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/tags?post=39842"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}