{"id":39863,"date":"2013-04-30T21:30:17","date_gmt":"2013-04-30T13:30:17","guid":{"rendered":"https:\/\/wp-productionenv-bjg9h2g2bgg5b8aa.southeastasia-01.azurewebsites.net\/news\/nasas-commercial-crew-catch-22-as-another-424m-heads-to-russia\/"},"modified":"2013-04-30T21:30:17","modified_gmt":"2013-04-30T13:30:17","slug":"nasas-commercial-crew-catch-22-as-another-424m-heads-to-russia","status":"publish","type":"post","link":"https:\/\/starpath.global\/news\/nasas-commercial-crew-catch-22-as-another-424m-heads-to-russia\/","title":{"rendered":"NASA\u2019s Commercial Crew Catch 22 as another $424m heads to Russia"},"content":{"rendered":"<p>NASA administrator Charlie Bolden emphasized the need for Congress to fully support funding for the Agency\u2019s Commercial Crew Program, after signing a $424m extension for the use of Russian Soyuz vehicles to transport NASA astronauts to the International Space Station. The deal, which reaches through to June 2017, is likely to receive further extensions.<\/p>\n<\/p>\n<p>\nDomestic Crew Capability:<\/p>\n<p>Since the retirement of the Space Shuttle fleet, NASA astronauts have been launched to the ISS on Russian Soyuz vehicles, a requirement that ensures the continuation of a US presence on a Station that was mainly funded and constructed by the United States.<\/p>\n<p>While some argue the end of Shuttle was premature, the three orbiters successfully completed their unique role of hauling huge amounts of hardware and supplies to the orbital outpost, marking the start of a major transitional period for the US space agency.<\/p>\n<p><img fetchpriority=\"high\" decoding=\"async\" class=\"alignleft size-full wp-image-29074\" title=\"The &quot;21st Century&quot; fleet\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2013\/04\/Z320.jpg\" alt=\"The &quot;21st Century&quot; fleet\" width=\"353\" height=\"165\" srcset=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2013\/04\/Z320.jpg 353w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2013\/04\/Z320-350x164.jpg 350w\" sizes=\"(max-width: 353px) 100vw, 353px\">With the ISS moving from assembly to utilization, and the orbiters receiving an honorable retirement, NASA looked forward to refocusing Shuttle\u2019s yearly cost of around $4.5 billion into a new fleet of commercial vehicles that would take over some of the Agency\u2019s Low Earth Orbit (LEO) obligations, freeing the US to plan for a return to Beyond Earth Orbit (BEO) exploration.<\/p>\n<p>On paper the plan appears to be a perfect mix of propelling commercial space into the Premier League of space missions \u2013 initially supplying cargo to the ISS, prior to launching NASA astronauts to the giant laboratory in the heavens \u2013 followed by NASA\u2019s flagship missions to explore deep space as far as Mars, enabled by the world\u2019s biggest launch vehicle, the Space Launch System (SLS).<\/p>\n<p>In reality, NASA\u2019s $17-18 billion budget is spread over many projects, each of which tend to come with their own political backers, who then fight over how the NASA pie will be sliced up.<\/p>\n<p>SpaceX launch tickets<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>NASA educational resources<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>Spaceflight<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>\n<p>     (adsbygoogle = window.adsbygoogle || []).push({});<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-29075\" title=\"Antares launch via L2 engineering video\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2013\/04\/Z417.jpg\" alt=\"Antares launch via L2 engineering video\" width=\"350\" height=\"212\" srcset=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2013\/04\/Z417.jpg 350w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2013\/04\/Z417-180x110.jpg 180w\" sizes=\"(max-width: 350px) 100vw, 350px\">While NASA\u2019s Commercial Resupply Services (CRS) drive is up and running \u2013 with Orbital recently enjoying the successful debut launch of the Antares, ahead of Cygnus supply runs, and SpaceX already completing two CRS missions \u2013 the path towards the Commercial Crew missions to the ISS is suffering from funding concerns.<\/p>\n<p>The initial plan aimed at regaining US domestic launch capability for NASA astronauts by around 2015.<\/p>\n<p>Although the three main competitors involved in the Commercial Crew Program \u2013 SpaceX, Boeing and Sierra Nevada Corporation (SNC) \u2013 are currently making good progress on their respective vehicles, the lower-than-requested levels of funding in the NASA budget over the past three years has resulted in the 2015 target slipping by at least two years.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-29079\" title=\"Soyuz\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2013\/04\/Z714.jpg\" alt=\"Soyuz\" width=\"350\" height=\"248\">The shortfall is \u201conly\u201d in the hundreds of millions of dollars per year, which is ironically about the same amount of money that is being sent to Roscosmos for the purchase of seats on the Soyuz \u2013 a scenario that has been once again extended, to June, 2017 \u2013 in order to cover the slip in the Commercial Crew Program\u2019s Full Operational Capability (FOC) date.<\/p>\n<p>\u201cNASA has signed a $424 million modification to its contract with the Russian Federal Space Agency (Roscosmos) for full crew transportation services to the International Space Station in 2016 with return and rescue services extending through June 2017,\u201d noted a NASA release on Tuesday, confirming a deal that had been known for several months.<\/p>\n<p>\u201cThis firm-fixed price modification covers comprehensive Soyuz support, including all necessary training and preparation for launch, flight operations, landing and rescue of six space station crew members on long-duration missions. It also includes additional launch site support, which was provided previously under a separate contract.<\/p>\n<h4 class=\"widget-title penci-border-arrow\">See Also<\/h4>\n<ul>\n<li>Commercial Crew Forum<\/li>\n<li>L2 Commercial Crew Section<\/li>\n<li>L2 ISS Section<\/li>\n<li>Click here to Join L2<\/li>\n<\/ul>\n<p>\u201cThe modification will allow for a lead time of about three years Roscosmos needs to build additional Soyuz vehicles.\u201d<\/p>\n<p>This Catch 22 situation leaves General Bolden fighting to ensure funding for Commercial Crew isn\u2019t once again starved during the FY13 Budget Proposal discussions, with the release relaying comments the NASA head has made many times previous.<\/p>\n<p>\u201cFull funding of the administration\u2019s Fiscal Year 2014 budget request is critical to making these domestic capabilities possible by 2017.\u201d<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-29073\" title=\"Long Term Schedule, via L2\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2013\/04\/Z422.jpg\" alt=\"Long Term Schedule, via L2\" width=\"352\" height=\"233\" srcset=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2013\/04\/Z422.jpg 352w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2013\/04\/Z422-350x232.jpg 350w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2013\/04\/Z422-263x175.jpg 263w\" sizes=\"(max-width: 352px) 100vw, 352px\">However, NASA planners appear to be resigned to the fact they will require Soyuz support through to the end of 2017, after a full one year slip was observed on the Flight Planning Integration Panel (FPIP) document, available in L2.<\/p>\n<p>This first Commercial Crew mission to the ISS is known as US Crew Vehicle -1 (USCV-1), with a launch date now penciled in for November 30, 2017, followed by a docking on December 2, 2017.<\/p>\n<p>The USCV-2 through to USCV-6 are shown to launch at intervals of six months, with a Russian Soyuz penciled in to provide a back up role \u201cin the event the US Crewed Vehicle is unavailable\u201d through to the USCV-4 mission in 2019.<\/p>\n<p>Partly responsible for the funding constraints has been the large political support for SLS and Orion, which may also play a part of the bigger picture.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-29076\" title=\"SLS with Orion on EM-1\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2013\/04\/Z516.jpg\" alt=\"SLS with Orion on EM-1\" width=\"351\" height=\"245\">Per the 2010 Authorization Act, the language guided NASA to bringing SLS on line by 2017 \u2013 much earlier than the required per its primary role of lofting large upmass for deep space missions.<\/p>\n<p>The reason 2017 was selected was partly related to the \u201cback up\u201d role of using Orion for NASA crew transportation to the ISS, in the event Commercial Crew suffered a major schedule delay.<\/p>\n<p>The language was written at the time Commercial Crew was scheduled to begin in 2015, but with the ongoing slips, there is a slight possibility lawmakers may gaze towards what would be an overpowered 70mt SLS for an Orion mission to the ISS.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-29077\" title=\"Orion at the ISS\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2013\/04\/Z614.jpg\" alt=\"Orion at the ISS\" width=\"350\" height=\"230\">Although the ISS wasn\u2019t mentioned, intimations towards Orion being initially used in LEO were recently made during the NASA\u2019s Aerospace Safety Advisory Panel (ASAP) meeting at the Goddard Space Flight Center, with panel member John Frost noting the \u201cconservative\u201d process would be to fly a crewed Orion mission in LEO before flying crewed Exploration Mission -2 (EM-2).<\/p>\n<p>\u201cHowever, this would require one more flight than is currently budgeted,\u201d he added, before requesting he would \u201clike to see the rationale for flying first-time crewed to BEO rather than LEO (and) the rationale for not flying flight-configuration before flying crew.\u201d<\/p>\n<p>Click here for Commercial Space Articles:&nbsp;http:\/\/www.nasaspaceflight.com\/news\/commercial\/<\/p>\n<p>Flying the BEO-tasked Orion on an ISS mission would be last resort, with extending the Soyuz agreement likely to be the route NASA would take in the event of further delays to Commercial Crew. However, General Bolden states he is focused on avoiding further slips by stressing the need for stable funding, starting with FY13.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-29078\" title=\"Crew boarding Dream Chaser\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2013\/04\/Z1031.jpg\" alt=\"Crew boarding Dream Chaser\" width=\"348\" height=\"239\">\u201cThree years ago, the Administration put forward a public-private partnership plan, the Commercial Crew Program (CCP), to ensure that American companies would be launching our astronauts from U.S. soil by 2015,\u201d he wrote on Tuesday. \u201cIf NASA had received the President\u2019s requested funding for this plan, we would not have been forced to recently sign a new contract with Roscosmos for Soyuz transportation flights.\u201d<\/p>\n<p>\u201cBecause the funding for the President\u2019s plan has been significantly reduced, we now won\u2019t be able to support American launches until 2017. Even this delayed availability will be in question if Congress does not fully support the President\u2019s fiscal year 2014 request for our Commercial Crew Program, forcing us once again to extend our contract with the Russians.<\/p>\n<p>\u201cFurther delays in our Commercial Crew Program and its impact on our human spaceflight program are unacceptable. That\u2019s why we need the full $821 million the President has requested in next year\u2019s budget to keep us on track to meet our 2017 deadline and bring these launches back to the United States.\u201d<\/p>\n<p>(Images: L2 Content and NASA)<\/p>\n<p>(NSF and L2 are providing full transition level coverage, available no where else on the internet, from Orion and SLS to ISS and CRS\/CCP, to European and Russian vehicles.<\/p>\n<p>(Click here: http:\/\/www.nasaspaceflight.com\/l2\/ \u2013 to view how you can access the best space flight content on the entire internet.)<\/p>\n","protected":false},"excerpt":{"rendered":"<p>NASA administrator Charlie Bolden emphasized the need for Congress to fully support funding for the Agency\u2019s Commercial Crew Program, after signing a $424m extension for the use of Russian Soyuz vehicles to transport NASA astronauts to the International Space Station. The deal, which reaches through to June 2017, is likely to receive further extensions. Domestic [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":30398,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":"","_links_to":"","_links_to_target":""},"categories":[2],"tags":[8996,524,2304,233,640],"class_list":["post-39863","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","tag-ccdev","tag-commercial-crew","tag-crs","tag-iss","tag-orion"],"acf":[],"_links":{"self":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/39863"}],"collection":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/comments?post=39863"}],"version-history":[{"count":0,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/39863\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/media\/30398"}],"wp:attachment":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/media?parent=39863"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/categories?post=39863"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/tags?post=39863"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}