{"id":39894,"date":"2013-03-10T19:49:34","date_gmt":"2013-03-10T11:49:34","guid":{"rendered":"https:\/\/wp-productionenv-bjg9h2g2bgg5b8aa.southeastasia-01.azurewebsites.net\/news\/facilitating-the-commercial-crew-era-for-kennedys-opfs\/"},"modified":"2013-03-10T19:49:34","modified_gmt":"2013-03-10T11:49:34","slug":"facilitating-the-commercial-crew-era-for-kennedys-opfs","status":"publish","type":"post","link":"https:\/\/starpath.global\/news\/facilitating-the-commercial-crew-era-for-kennedys-opfs\/","title":{"rendered":"Facilitating the commercial crew era for Kennedy\u2019s OPFs"},"content":{"rendered":"<p>As the Kennedy Space Center (KSC) continues its transformation into a multi-user spaceport, the three buildings dedicated to processing the since-retired Space Shuttle orbiters are aiming to once again host engineers busily tending to their spacecraft. However, only one of the buildings has confirmed a tenant for the new era at this time.<\/p>\n<\/p>\n<p>\nOPF Transition:<\/p>\n<p>Technically, the three buildings are collectively known as the Orbiter Processing Facility \u2013 consisting of three \u201chigh bays\u201d and support rooms.<\/p>\n<p><img fetchpriority=\"high\" decoding=\"async\" class=\"alignleft size-full wp-image-28462\" title=\"OPF-3 under construction\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2013\/03\/Z47.jpg\" alt=\"OPF-3 under construction\" width=\"350\" height=\"233\" srcset=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2013\/03\/Z47.jpg 350w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2013\/03\/Z47-263x175.jpg 263w\" sizes=\"(max-width: 350px) 100vw, 350px\">OPF High Bay 1 and 2 were constructed in the late 1970s, connected by a 233-foot-long low bay. They were joined by OPF High Bay 3, which has a single story-office building attached. OPF-3 initially started life as the NASA Orbiter Modification and Refurbishment Facility (OMRF), before its own transition as the orbiter fleet grew in numbers.<\/p>\n<p>On the occasions where all four orbiters were at KSC, but outside of a mating or pad flow, one vehicle was hosted inside the Vehicle Assembly Building (VAB).<\/p>\n<p>Unlike a lot of KSC\u2019s facilities \u2013 that were constructed for the Apollo Program before being repurposed \u2013 the OPF buildings were constructed specifically for the orbiters.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-28463\" title=\"An Orbiter Inside her OPF\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2013\/03\/Z58.jpg\" alt=\"An Orbiter Inside her OPF\" width=\"348\" height=\"236\">The open bay space inside an OPF High Bay consists of 30,000 square feet of clear floor area with a clear height of nearly 100 feet.<\/p>\n<p>Rocket launch schedules<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>NASA mission updates<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>Space Shuttle<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>\n<p>     (adsbygoogle = window.adsbygoogle || []).push({});<\/p>\n<p>The buildings are made from pre-insulated metal siding on a structural steel frame and features specialized heavy electrical and environmental control systems that protected the orbiters during processing.<\/p>\n<p>The buildings had everything an orbiter needed for her processing flow, ranging from 30-ton bridge cranes, two rolling bridges, communications rooms, offices and supervisory control rooms and a huge array of platforms surrounding the vehicle to allow engineers and technicians to access all areas of the orbiter.<\/p>\n<p>OPF High Bay 3 is already deep into its transition, following the October, 2011 deal for a 15 year lease, agreed between NASA and Space Florida \u2013 the State\u2019s aerospace economic development agency.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-28460\" title=\"C3PF\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2013\/03\/Z35.jpg\" alt=\"C3PF\" width=\"349\" height=\"222\">The deal between NASA and Space Florida includes the use and modification of OPF-3, the Space Shuttle Main Engine (SSME) Processing Facility and Processing Control Center (PCC).<\/p>\n<p>This agreement allowed Space Florida to lease OPF-3 to the Boeing Company to manufacture and test the company\u2019s Crew Space Transportation (CST-100) spacecraft, creating up to 550 jobs along the Space Coast. In addition to the October announcement, Boeing announced it would be locating its Commercial Crew Program headquarters at the world famous spaceport.<\/p>\n<h4 class=\"widget-title penci-border-arrow\">See Also<\/h4>\n<ul>\n<li>Commercial Crew Section<\/li>\n<li>L2 Commercial Crew Section<\/li>\n<li>Click here to Join L2<\/li>\n<\/ul>\n<p>Transitioning the facility has resulted in the removal of the platforms and orbiter-dedicated hardware, creating what is known as a \u201cclean floor\u201d workspace.<\/p>\n<p>It also changed call signs, from OPF-3 to the Commercial Crew and Cargo Processing Facility (C3PF), with work officially started in September, 2011 \u2013 for completion in the summer of this year.<\/p>\n<p>The fate of OPF-1 and OPF-2 remains unknown, although a KSC status report (L2), has shown the spaceport is starting to prepare both high bays for new tenants: \u201cOPF 1\/2 and the Annex will begin transition for future operations (this month).\u201d<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-28461\" title=\"Dream Chaser Fleet in OPF, via L2\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2013\/03\/Z341.jpg\" alt=\"Dream Chaser Fleet in OPF, via L2\" width=\"351\" height=\"260\">There is hope Sierra Nevada Corporation (SNC) will be the next company to move into KSC, as they continue to evaluate facilities at the spaceport for their Dream Chaser vehicle.<\/p>\n<p>\u201cWe\u2019ve been in discussions with the Kennedy Space Center and Space Florida about facilities (at the spaceport),\u201d noted Jim Voss, SNC director of advanced programs and program executive for Dream Chaser to NASASpaceFlight.com last year.<\/p>\n<p>\u201c(However,) an OPF may not be the ideal facility for our vehicle, because they have all the structures that were specific to the shuttle that would have to be removed.<\/p>\n<p>\u201cWe need a large open area, because our vehicle is much more accessible than the Shuttle was, and we don\u2019t need hazardous operations because of our non toxic propellants we have on-board. But we are looking at using a facility at KSC for our processing.\u201d<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-28464\" title=\"Inside an OPF\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2013\/03\/Z3141.jpg\" alt=\"Inside an OPF\" width=\"350\" height=\"240\">A potential solution for Dream Chaser to take up residency in an OPF could mirror the Space Florida work for CST-100, the creation of a clean floor processing facility, again by removing all the structures that were designed to care for a Shuttle orbiter. The KSC team are more than aware they will need to cater to the needs of a new tenant.<\/p>\n<p>\u201cWe\u2019d come up with a baseline configuration of how we\u2019re planning to turn (the OPFs) over, and there could be some negotiations where we say we\u2019re going to remove the hypergolic hardware and (the customer) could say no we want to use some of that,\u201d noted Stephanie Stilson, NASA Flow Director for Orbiter Transition and Retirement to NASASpaceFlight.com\u2019s Philip Sloss last year.<\/p>\n<p>\u201cSo we\u2019ll work up a baseline and anything they want to change after that will be their responsibility.\u201d<\/p>\n<p>SNC have understandably not released any updated information on their negotiations for a KSC-based facility, likely due to talks with NASA and potentially Space Florida.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-28466\" title=\"A naked Dream Chaser, via L2\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2013\/03\/Z71.jpg\" alt=\"A naked Dream Chaser, via L2\" width=\"353\" height=\"182\" srcset=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2013\/03\/Z71.jpg 353w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2013\/03\/Z71-350x180.jpg 350w\" sizes=\"(max-width: 353px) 100vw, 353px\">However, their recent deal with Lockheed Martin \u2013 which will see the \u201cbirth\u201d of Dream Chaser composite airframes at the Michoud Assembly Facility (MAF) could enable the shipping of the vehicles into the KSC turn basin for the short role to an OPF for outfitting and flight processing.<\/p>\n<p>As previously reported, documentation has also shown that KSC management have cited preferred roles for all three OPFs to house new vehicles, namely CST-100, as already agreed, Dream Chaser in OPF-2 and the US Air Force\u2019s X-37B in OPF-1.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-28467\" title=\"OPF Locations\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2013\/03\/A31.jpg\" alt=\"OPF Locations\" width=\"346\" height=\"259\">One of the obstacles for housing a military vehicle such as the X-37B in a former OPF is security. However, Ms Stilson recently claimed an OPF could provide such a role.<\/p>\n<p>\u201cThat could happen (military vehicle, next door to a commercial vehicle), sure. It depends on the nature of the different customers that are there.<\/p>\n<p>\u201cBut we could come up with ways to keep them separated, so if we needed to have a secure location in OPF-1 versus OPF-2, we could set that up so that if you are badged to go into OPF-1, you can\u2019t go into OPF-2.<\/p>\n<p>\u201cSo that\u2019s something we could work, and we have considered that given it\u2019s most likely we\u2019ll have two separate customers for those two bays.\u201d<\/p>\n<p>While it is expected all three OPF High Bays will have confirmed tenants by this summer, none of the vehicles will be using Launch Pads 39B or 39A. Only the Space Launch System (SLS) is scheduled to launch from Complex 39, although it may soon be joined by a newly refocused commercial launch vehicle, Liberty II.<\/p>\n<p>(Images: via L2\u2019s Commercial Crew Section \u2013 containing presentations, videos, images, interactive high level updates and more, with additional image via Brian Papke, MaxQ Entertainment\/NASASpaceflight.com and NASA).<\/p>\n<p>(Click here: http:\/\/www.nasaspaceflight.com\/l2\/ \u2013 to view how you can support NSF and access the best space flight content on the entire internet).<\/p>\n","protected":false},"excerpt":{"rendered":"<p>As the Kennedy Space Center (KSC) continues its transformation into a multi-user spaceport, the three buildings dedicated to processing the since-retired Space Shuttle orbiters are aiming to once again host engineers busily tending to their spacecraft. However, only one of the buildings has confirmed a tenant for the new era at this time. OPF Transition: [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":30315,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":"","_links_to":"","_links_to_target":""},"categories":[2],"tags":[1565,970,7766,9032,8894,1011],"class_list":["post-39894","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","tag-cst-100","tag-dream-chaser","tag-ksc","tag-opf","tag-snc","tag-x-37b"],"acf":[],"_links":{"self":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/39894"}],"collection":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/comments?post=39894"}],"version-history":[{"count":0,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/39894\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/media\/30315"}],"wp:attachment":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/media?parent=39894"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/categories?post=39894"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/tags?post=39894"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}