{"id":39980,"date":"2012-11-08T20:12:49","date_gmt":"2012-11-08T12:12:49","guid":{"rendered":"https:\/\/wp-productionenv-bjg9h2g2bgg5b8aa.southeastasia-01.azurewebsites.net\/news\/modifications-planned-for-atlas-v-slc-41-pad-and-sls-mobile-launcher\/"},"modified":"2012-11-08T20:12:49","modified_gmt":"2012-11-08T12:12:49","slug":"modifications-planned-for-atlas-v-slc-41-pad-and-sls-mobile-launcher","status":"publish","type":"post","link":"https:\/\/starpath.global\/news\/modifications-planned-for-atlas-v-slc-41-pad-and-sls-mobile-launcher\/","title":{"rendered":"Modifications planned for Atlas V SLC-41 Pad and SLS Mobile Launcher"},"content":{"rendered":"<p>United Launch Alliance (ULA) have recruited Hensel Phelps to design the modifications to their Atlas V pad at Space Launch Complete 41 (SLC-41) at Cape Canaveral ahead of hosting human rated vehicles. The Orlando company previously constructed the Ares Mobile Launcher (ML), which is also set to be modified to host the Space Launch System (SLS).<\/p>\n<p>Atlas V Pad Modifications:<\/p>\n<p>The United Launch Alliance (ULA) are currently planning to launch two commercial spacecraft to destinations such as the International Space Station via their reliable Atlas V rocket \u2013 namely Boeing\u2019s CST-100 and SNC\u2019s Dream Chaser, both of which are currently under development within NASA\u2019s Commercial Crew Integrated Capability (CCiCap) program.<\/p>\n<p>The challenge with the pad at SLC-41 mainly relates to crew access and the Emergency Egress System (EES) for both the astronauts and the pad workers.<\/p>\n<h4 class=\"widget-title penci-border-arrow\">See Also<\/h4>\n<ul>\n<li>ULA&nbsp;Forum Section<\/li>\n<li>L2&nbsp;Commercial Crew<\/li>\n<li>L2&nbsp;SLS\/HLV Section<\/li>\n<li>Click here to Join L2<\/li>\n<\/ul>\n<p>To meet these challenges, ULA have selected Hensel Phelps Construction Co. of Orlando to provide program management contractor support to the efforts, resulting in a 21-month effort to work on the the management of the design, requirements development, cost and schedule projections, and risk mitigation for modifications to the launch facilities for commercial crew operations.<\/p>\n<p>\u201cHensel Phelps brings significant experience working major construction projects including the original construction for Atlas V at SLC-41, as well as Atlas modifications at SLC-3 in California,\u201d said Dr. George Sowers, ULA vice president of Human Launch Services.<\/p>\n<p>\u201cWe look forward to working with Hensel Phelps to take the next steps in launching crew from SLC-41 and providing safe and reliable crew launch services as early as 2015.\u201d<\/p>\n<p><img fetchpriority=\"high\" decoding=\"async\" class=\"alignleft size-full wp-image-26743\" title=\"Z4\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2012\/11\/Z44.jpg\" alt=\"\" width=\"349\" height=\"235\">Hensel Phelps will assist with the design and development of the crew access tower and the crew access arm which will provide access to the commercial crew space vehicle for cargo and crew loading.<\/p>\n<p>Space Shuttle models<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>Company News<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>NASA mission patches<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>\n<p>     (adsbygoogle = window.adsbygoogle || []).push({});<\/p>\n<p>\u201cHensel Phelps is excited about teaming with ULA and their partners on the modifications of SLC-41,\u201d said Kirk Hazen, vice president of Hensel Phelps. \u201cIt is an honor and privilege to be a part of the next generation of human space flight.\u201d<\/p>\n<p>The project \u2013 which could ultimately create 250-300 much-needed skilled aerospace and construction jobs in Brevard County \u2013 already has a number of notional views into what the pad modifications may eventually look like, such as the access tower elevator to a platform deck, allowing the astronauts to walk to the hatch of the spacecraft prior to ingress.<\/p>\n<p>Click here for recent Commercial Crew Articles: http:\/\/www.nasaspaceflight.com\/tag\/ccdev\/<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-26744\" title=\"Z5\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2012\/11\/Z53.jpg\" alt=\"\" width=\"350\" height=\"239\">The announcement, not least on the new jobs, was welcomed by NASA Commercial Crew Program Manager Ed Mango.<\/p>\n<p>\u201cOne year after the Space Shuttle Program, American companies are making critical progress on modern spacecraft and rockets that will enable the next generation of human spaceflight,\u201d Mango said.<\/p>\n<p>\u201cNASA\u2019s Commercial Crew Program is fostering new national capabilities for spacecraft, launch vehicles, flight operations and ground operations to achieve safe, reliable and cost-effective access to and from the International Space Station and low-Earth orbit. These advances will enable a launch of astronauts from U.S. soil in the next five years.&nbsp;<\/p>\n<p>\u201cCompanies like ULA and their subcontractors in the Space Coast and around the nation are creating the high-skill, good-paying jobs that will ensure continued American leadership in space and the growth of the greatest aerospace industry in the world.\u201d<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-26742\" title=\"Z103\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2012\/11\/Z103.jpg\" alt=\"\" width=\"348\" height=\"239\">The company will also work on the Emergency Egress System (EES) that will provide the flight crew and support personnel with a method to quickly evacuate in the unlikely event of a contingency event and a safe haven which will provide a safe environment for the crew and support personnel until they can be evacuated to another location.<\/p>\n<p>No notional imagery has been created for the EES \u2013 although numerous options are already under evaluation, including a system similar to that used on the Space Shuttle pads at 39A and 39B.<\/p>\n<p>\u201cWe are still looking at different options for emergency egress. Detailed hazard analysis of the launch operations is a key determinant and is being refined,\u201d added Dr George Sowers, during a Q&amp;A session with NASASpaceFlight.com members.<\/p>\n<p>\u201cWe have the option of implementing a shuttle-like slide wire system, if required.\u201d<\/p>\n<p>Ares ML to SLS ML:<\/p>\n<p>The ML \u2013 designed by RS&amp;H (base and structure), along with ASRC Aerospace Corporation (prop systems etc.) \u2013 consists of the main support structure that comprises the base, tower and facility ground support systems, which include power, communications, conditioned air, water for cooling, wash-down, and was designed with ignition over-pressure protection in mind.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-26745\" title=\"A417\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2012\/11\/A417.jpg\" alt=\"\" width=\"339\" height=\"232\">Hensel Phelps engineers worked on the structure at the mobile launcher park site area just north of the VAB, with trestles and girders arriving by barge in February of 2009, beginning the opening phase of work to create a base platform \u2013 one which is lighter than the current Mobile Launch Platforms (MLPs) that used to host the Space Shuttle.<\/p>\n<p>With the giant Launch Umbilical Tower (LUT), the total weight of the structure is around 9.5 million pounds, compared to the 8.2 million pounds for just the Shuttle\u2019s MLP.<\/p>\n<p>Fabrication of the 345-foot LUT begin in May of 2009, in preparation for being placed on top of the ML\u2019s platform as the LUT\u2019s base, prior to the addition of nine additional sections via a giant crane at the build site.<\/p>\n<p>Click here for recent ML Articles: http:\/\/www.nasaspaceflight.com\/tag\/ml\/<\/p>\n<p>The Installation of the first section was conducted on September 24, followed by a second section on October 15, a third on October 27, a fourth and fifth section in November, a sixth and seventh in December, followed by the final three sections, resulting all 10 sections being installed by January 28, 2010<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-26746\" title=\"A610\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2012\/11\/A610.jpg\" alt=\"\" width=\"331\" height=\"231\">This was followed by the installation of the launch mounts \u2013 highly specific for only the since-cancelled Ares I vehicle \u2013 on the platform in the Spring of 2010.<\/p>\n<p>Although the ML is highly suited to the SLS vehicle, modifications \u2013 mainly to the Ares-specific elements of the structure \u2013 will be required, ahead of the Heavy Lift Launch Vehicle\u2019s debut in 2017. This would will be in addition to the umbilical set up required for SLS.<\/p>\n<p>As such KSC managers have now sent out a request for information about potential sources for the labor, equipment, and materials to deconstruct and modify the existing Mobile Launcher for SLS \u2013 work that will be carried out at the ML Park Site 3 near the Vehicle Assembly Building (VAB).<\/p>\n<p>\u201cThe work consists of removal and storage of existing system components, equipment, and materials for reuse\/reinstallation; demolition of system components and structure not to be reused; modification of structural elements and installation of new structural elements; reinstallation of salvaged equipment and materials, and installation of new systems, equipment, and materials,\u201d noted the information.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-26747\" title=\"A59\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2012\/11\/A59.jpg\" alt=\"\" width=\"341\" height=\"250\">\u201cHeavy structural demolition and construction is to be performed on approximately half of the existing ML base (MLB). Temporary foundations and shoring will be required to support the remaining MLB and ML tower (MLT) structure during deconstruction\/demolition and reconstruction.<\/p>\n<p>The information added that modifications to the MLT Electrical Equipment Rooms include removal and modification of Air Conditioning ductwork, and electrical and communication cable trays, and relocation of lighting fixtures.<\/p>\n<p>The ML was taken for a test trip to Pad 39B this year, marking its full transition to the SLS program.<\/p>\n<p>The ML was also suited to the Liberty launch vehicle, which lost out on NASA funding via the CCiCAP process. ATK\u2019s in-line vehicle may still launch, and from KSC, but is now focused on cargo services. Such launches would take place from a modified Mobile Launch Platform (MLP), previously employed with the Space Shuttle Program (SSP).<\/p>\n<p>(Images via L2\u2019s Commercial Crew and SLS sections, with additional images via SNC and NASA.)<\/p>\n<p>(With the shuttle fleet retired, NSF and&nbsp;L2 are providing full transition level coverage, available no where else on the internet, from Orion and SLS to ISS and COTS\/CRS\/CCDEV, to European and Russian vehicles.&nbsp;<\/p>\n<p>(Click here: http:\/\/www.nasaspaceflight.com\/l2\/&nbsp;\u2013 to view how you can access the best space flight content on the entire internet and directly support NSF\u2019s running costs)<\/p>\n","protected":false},"excerpt":{"rendered":"<p>United Launch Alliance (ULA) have recruited Hensel Phelps to design the modifications to their Atlas V pad at Space Launch Complete 41 (SLC-41) at Cape Canaveral ahead of hosting human rated vehicles. The Orlando company previously constructed the Ares Mobile Launcher (ML), which is also set to be modified to host the Space Launch System [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":30338,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":"","_links_to":"","_links_to_target":""},"categories":[2],"tags":[7758,1565,970,9034,8892,624,363],"class_list":["post-39980","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","tag-atlas-v","tag-cst-100","tag-dream-chaser","tag-hlv","tag-ml","tag-sls","tag-ula"],"acf":[],"_links":{"self":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/39980"}],"collection":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/comments?post=39980"}],"version-history":[{"count":0,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/39980\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/media\/30338"}],"wp:attachment":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/media?parent=39980"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/categories?post=39980"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/tags?post=39980"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}