{"id":39986,"date":"2012-10-30T20:19:12","date_gmt":"2012-10-30T12:19:12","guid":{"rendered":"https:\/\/wp-productionenv-bjg9h2g2bgg5b8aa.southeastasia-01.azurewebsites.net\/news\/em-2-orion-crew-to-spend-up-to-four-days-in-lunar-orbit\/"},"modified":"2012-10-30T20:19:12","modified_gmt":"2012-10-30T12:19:12","slug":"em-2-orion-crew-to-spend-up-to-four-days-in-lunar-orbit","status":"publish","type":"post","link":"https:\/\/starpath.global\/news\/em-2-orion-crew-to-spend-up-to-four-days-in-lunar-orbit\/","title":{"rendered":"EM-2: Orion crew to spend up to four days in Lunar Orbit"},"content":{"rendered":"<p>The first crewed mission of NASA\u2019s Beyond Earth Orbit (BEO) exploration era will send a crew of four on a short vacation into Lunar orbit in 2021. Exploration Mission -2 (EM-2) will be a key test of Orion\u2019s life support systems, following a baseline path laid out by EM-1, the uncrewed debut of the Space Launch System (SLS) and Orion duo.<\/p>\n<p>SLS\/Orion:<\/p>\n<p>With NASA\u2019s exploration plan still being worked \u2013 and likely to remain as such due to the uncertainty relating to the Presidential election process \u2013 even these two opening missions of the new Heavy Lift Launch Vehicle (HLV) are subject to change.<\/p>\n<p>However, that may be a blessing in disguise, with the current opening salvo of NASA\u2019s return to BEO exploration providing an uninspiring, highly expensive and near-unworkable approach of launching an uncrewed Lunar mission in 2017, prior to employing the entire SLS\/Orion ground support workforce to be removed from a launch processing stance for several years, ahead of repeating the initial mission, this time with a crew.<\/p>\n<h4 class=\"widget-title penci-border-arrow\">See Also<\/h4>\n<ul>\n<li>Moon Mission Forum Section<\/li>\n<li>L2 SLS Section<\/li>\n<li>L2 Orion Section<\/li>\n<li>Click here to Join L2<\/li>\n<\/ul>\n<p>That unattractive approach is partly to do with budget-restrictions, but also because NASA\u2019s leadership continues to be pushed and pulled between opposing political forces that both saved the HLV plan from being mothballed under the FY11 budget proposal, then heavily delayed the actual go-ahead for SLS via additional trade studies.<\/p>\n<p>This leaves a scenario where NASA\u2019s official line continues to lack any real expansion on the goals of a Near Earth Asteroid (NEA) mission in the 2025 time-frame, followed by a crewed mission to Mars in the 2030s.<\/p>\n<p>However, behind the scenes, more interesting information is available, via what is known as the Design Reference Mission (DRM) work, showing a large amount of evaluation into missions that include a return to the surface of the Moon, in tandem with the continued rise in stock for constructing an Exploration Gateway at the ISS, ahead of its placement at EML-2.<\/p>\n<p>EM-1 to EM-2:<\/p>\n<p>Company News<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>NASA mission patches<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>Space Shuttle<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>\n<p>     (adsbygoogle = window.adsbygoogle || []).push({});<\/p>\n<p>Regardless of how the future exploration plan is constructed, SLS will require a validation flight, via what is known as Exploration Mission -1 (EM-1), currently targeting December, 2017.<\/p>\n<p><img fetchpriority=\"high\" decoding=\"async\" class=\"alignleft size-full wp-image-26626\" title=\"Z419\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2012\/10\/Z419.jpg\" alt=\"\" width=\"350\" height=\"209\">This mission will feature the 318 feet, 70mt Block 1 SLS, utilizing two of ATK\u2019s five segment Solid Rocket Boosters (SRBs), four RS-25Ds donated from the Space Shuttle Program (SSP), a core built by Boeing at the Michoud Assembly Facility (MAF), an avionics suite\/instrument unit, a kick stage \u2013 or Interim Cryogenic Propulsion System (ICPS) mated to the Orion, with the Spacecraft and Payload Adapter and Fairing being topped off by a Launch Abort System (LAS).<\/p>\n<p>The first EM-1 overview was overviewed in the SLS Master Presentation (E.5) \u2013 available on L2 (Link to Presentation) \u2013 provided a good insight into the basic mission plan \u2013 one that involves SLS lofting Orion en route to a high-apogee orbit of 975 nmi at the insertion point, followed by a Delta Cryogenic Second Stage (DCSS) conducting the Trans Lunar Injection (TLI) burn(s).<\/p>\n<p>For previous SLS Articles, click here: http:\/\/www.nasaspaceflight.com\/tag\/hlv\/<\/p>\n<p>According to the updated information in the recent Orion Concept Of Operations (CONOPS) presentation \u2013 available on L2 (Link to Presentation) \u2013 this flight of the Lunar Return Class Orion will \u201ctest critical mission elements as well as demonstrate performance in relevant environments prior to the first manned launch of the system.\u201d<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-26627\" title=\"Z4\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2012\/10\/Z418.jpg\" alt=\"\" width=\"349\" height=\"255\">The ICPS will perform the burns to both raise the perigee to 100x975nmi and to depart towards the Moon. Orion will perform the Trajectory Correction Maneuvers (TCMs) on both the inbound and outbound legs.<\/p>\n<p>The 6-10 day mission, utilizing a gross lift-off mass of 33.4 tons, will end when Orion re-enters Earth\u2019s atmosphere at 36,750 feet per second.<\/p>\n<p>\u201cThe flight test objectives are geared towards human rating of a BEO spacecraft. The mission will be designed to demonstrate integrated spacecraft systems performance prior to crewed flight. The trajectory is designed to achieve and demonstrate high speed atmospheric entry 36750 ft\/s (~11.2 km\/s) and to further demonstrate the MPCV prior to crewed flight,\u201d added the CONOPS presentation.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-26628\" title=\"Z5\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2012\/10\/Z516.jpg\" alt=\"\" width=\"348\" height=\"232\" srcset=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2012\/10\/Z516.jpg 348w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2012\/10\/Z516-263x175.jpg 263w\" sizes=\"(max-width: 348px) 100vw, 348px\">\u201cThe objectives of EM-1 will validate ascent environments (aerodynamic, aerothermal, acoustics, shock, loads, thermal and radiation) on an SLS flight and BEO environments. Critical mission events (jettison, fairing separation, LV sep, CM\/SM sep, FBC sep, chute deploy, CM uprighting and recovery) demonstrations will also be objectives of EM-1.<\/p>\n<p>\u201cThe test objectives will also include deep space tracking and communications, attitude control and in-space maneuvering and integrated power and thermal.\u201d<\/p>\n<p>Technically a mirror image of the EM-1 mission \u2013 from the standpoint of the hardware used \u2013 EM-2 will not only add a human crew into the mix, it will also involve a longer stay in the vicinity of the Moon, via numerous orbits.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-26629\" title=\"Z6\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2012\/10\/Z67.jpg\" alt=\"\" width=\"351\" height=\"239\">Classed a mission for \u201cup to\u201d four crewmembers, the Design Reference Mission (DRM) is classed as CLO (Crewed Lunar Orbit), given the astronauts will spend three to four days orbiting our nearest neighbor.<\/p>\n<p>\u201cA high lunar orbit 540-1620 nmi (1000-3000 km) is used because the Orion is performing both the Lunar Orbit Insertion (LOI) burn and the Trans-Earth Injection (TEI) burn and MPCV does not have sufficient propellant to enter into a low lunar orbit,\u201d the presentation noted.<\/p>\n<p>\u201cThe Orion will remain in lunar orbit for several days, after which the Orion will perform a TEI burn and begin the return to Earth.\u201d<\/p>\n<p>This mission\u2019s main objectives include one of the more challenging aspects of BEO missions, the life support system. It will also validate crew operations on the Orion.<\/p>\n<p>Currently, the launch is scheduled for 2021, although Orion managers have noted they are aiming to improve on that date.<\/p>\n<p>SLS-3 in 2022 is also undefined, but could become the first Exploration Gateway related mission, with the HLV\u2019s main role for the construction of the platform understood to be centered around the launch of the Solar Electric Propulsion (SEP) hardware that will send the constructed set of modules out to EML-2.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-26630\" title=\"Z38\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2012\/10\/Z38.jpg\" alt=\"\" width=\"350\" height=\"220\">The construction of the Exploration Gateway \u2013 if approved \u2013 would become the main enabler not only for NEA missions, but also for a potential inclusion of Lunar surface missions. Its construction at the ISS could also include both existing and international launch vehicles and hardware.<\/p>\n<p>Several other changes to the overall plan have also been touted, including using the Block 1 SLS in its cargo configuration for a launch inbetween EM-1 and EM-2 \u2013 although no reference to the potential payload has been made at this time.<\/p>\n<p>The lack of defined payloads is one of the main criticisms opponents cite in reference to the SLS.<\/p>\n<p>(Images:&nbsp;Via L2 content from&nbsp;L2\u2019s SLS specific L2 section, which includes, presentations, videos, graphics and internal \u2013 interactive with actual SLS engineers \u2013 updates&nbsp;on the SLS and HLV, available on no other site. Other image via NASA)<\/p>\n<p>(L2 is \u2013 as it has been for the past several years \u2013 providing full exclusive SLS&nbsp; and Exploration Planning coverage. &nbsp;To join L2, click here: http:\/\/www.nasaspaceflight.com\/l2\/)<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The first crewed mission of NASA\u2019s Beyond Earth Orbit (BEO) exploration era will send a crew of four on a short vacation into Lunar orbit in 2021. Exploration Mission -2 (EM-2) will be a key test of Orion\u2019s life support systems, following a baseline path laid out by EM-1, the uncrewed debut of the Space [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":30435,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":"","_links_to":"","_links_to_target":""},"categories":[2],"tags":[9034,625,640,624],"class_list":["post-39986","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","tag-hlv","tag-moon","tag-orion","tag-sls"],"acf":[],"_links":{"self":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/39986"}],"collection":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/comments?post=39986"}],"version-history":[{"count":0,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/39986\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/media\/30435"}],"wp:attachment":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/media?parent=39986"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/categories?post=39986"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/tags?post=39986"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}