{"id":40030,"date":"2012-09-06T19:19:22","date_gmt":"2012-09-06T11:19:22","guid":{"rendered":"https:\/\/wp-productionenv-bjg9h2g2bgg5b8aa.southeastasia-01.azurewebsites.net\/news\/opf-3s-conversion-into-boeings-c3pf-to-begin-on-september-10\/"},"modified":"2012-09-06T19:19:22","modified_gmt":"2012-09-06T11:19:22","slug":"opf-3s-conversion-into-boeings-c3pf-to-begin-on-september-10","status":"publish","type":"post","link":"https:\/\/starpath.global\/news\/opf-3s-conversion-into-boeings-c3pf-to-begin-on-september-10\/","title":{"rendered":"OPF-3\u2019s conversion into Boeing\u2019s C3PF to begin on September 10"},"content":{"rendered":"<p>The removal of work stands in Orbiter Processing Facility -3 (OPF-3) will begin next week, as the former home to Shuttle orbiters is converted into the new processing facility for Boeing\u2019s future crewed spacecraft, CST-100. The conversion is expected to take a year, as the OPF changes call signs to the Commercial Crew and Cargo Processing Facility (C3PF).<\/p>\n<p>OPF-3 For CST-100:<\/p>\n<p>The start date for the conversion of OPF-3 follows the announcement last October of a 15 year lease deal, agreed between NASA and Space Florida \u2013 the State\u2019s aerospace economic development agency.<\/p>\n<p>The deal between NASA and Space Florida included the use and modification of OPF-3, the Space Shuttle Main Engine (SSME) Processing Facility and Processing Control Center (PCC).<\/p>\n<h4 class=\"widget-title penci-border-arrow\">See Also<\/h4>\n<ul>\n<li>Commercial Crew Forum<\/li>\n<li>L2&nbsp;Commercial Crew<\/li>\n<li>Click here to Join L2<\/li>\n<\/ul>\n<p>This agreement then allowed Space Florida to lease OPF-3 to the Boeing Company to manufacture and test the company\u2019s Crew Space Transportation (CST-100) spacecraft, creating up to 550 jobs along the Space Coast.<\/p>\n<p>In addition to the October announcement, Boeing announced it would be locating its Commercial Crew Program headquarters at the world famous spaceport.<\/p>\n<p>Boeing have made good progress through their CCDev-2 (Commercial Crew) contract milestones \u2013 worth over $92m \u2013 centered around their CST-100 capsule, a vehicle configurable to carry up to seven crew\/passengers or an equivalent combination of passengers and pressurized cargo to LEO destinations, including the International Space Station.<\/p>\n<p><img fetchpriority=\"high\" decoding=\"async\" class=\"alignleft size-full wp-image-25964\" title=\"Z5\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2012\/09\/Z54.jpg\" alt=\"\" width=\"350\" height=\"231\" srcset=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2012\/09\/Z54.jpg 350w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2012\/09\/Z54-263x175.jpg 263w\" sizes=\"(max-width: 350px) 100vw, 350px\">Based on their early progress via CCDev-2, NASA opted to select the spacecraft as one of their three Commercial Crew integrated Capability (CCiCap) award winners last month, tasking Boeing with 19 milestones for their $460m funding, culminating in an integrated critical design review milestone, along with significant propulsion system, avionics, and wind tunnel development and testing.<\/p>\n<p>NASA mission updates<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>Company News<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>SpaceX<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>\n<p>     (adsbygoogle = window.adsbygoogle || []).push({});<\/p>\n<p>This vehicle will be using a human rated Atlas V launch vehicle, currently set to launch from SLC-41 at Cape Canaveral. NASA estimate that a crewed demonstration flight could occur as early as mid 2016, based on long term funding expectations.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-25966\" title=\"Z7\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2012\/09\/Z7.jpg\" alt=\"\" width=\"349\" height=\"227\">With Discovery now retired away from KSC, soon to be followed by Endeavour, only one OPF is in use for the orbiters \u2013 OPF-2 with Atlantis, as she prepares for a trip down the road to a new facility at the Visitor Center in the not too distant future.<\/p>\n<p>A large amount of work will be required to convert OPF-3 from its role with the Shuttle, with the facility still sporting the giant platforms which were used to surround an orbiter during her processing flow. That removal work will begin on September 10, as OPF-3 transitions to to C3PF.<\/p>\n<p>\u201cSpace Florida has initiated work to modernize Orbiter Processing Facility-3 (OPF-3 or K6-0696) for commercial spacecraft assembly and production operations,\u201d noted a Transition and Retirement (T&amp;R) note on L2. \u201cThrough this effort, OPF-3 will become the Commercial Crew and Cargo Processing Facility (C3PF).\u201d<\/p>\n<p>Click here for T&amp;R Articles: http:\/\/www.nasaspaceflight.com\/tag\/tr\/<\/p>\n<p>\u201cWork begins on Monday, Sept. 10. Removal of the high bay orbiter work stands is expected to be complete in late 2012, with full facility modernization complete in summer 2013. The Processing Control Center (PCC or K6-1094) also will be renovated under the effort.\u201d<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-25963\" title=\"A411\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2012\/09\/A411.jpg\" alt=\"\" width=\"350\" height=\"238\">The transition of OPF-3 is the latest step KSC is making to transition from a historically government-only launch complex to a multi-user spaceport.<\/p>\n<p>\u201cThis exciting project is the result of a first-of-its-kind partnership between NASA, Space Florida, and the commercial space industry and represents a major concrete step towards transforming KSC for the future by enabling commercial space operations,\u201d the notes added.<\/p>\n<p>However, two of the OPFs remain without a future customer and only the Space Launch System (SLS) is confirmed as a future user of the pad facilities at Complex 39 \u2013 and not until 2017.<\/p>\n<p>There is hope Sierra Nevada Corporation (SNC) will be the next company to move into KSC, as they continue to evaluate facilities at the spaceport for their Dream Chaser vehicle, another CCiCAP award winner.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-25962\" title=\"Z3\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2012\/09\/Z35.jpg\" alt=\"\" width=\"350\" height=\"228\">\u201cWe\u2019ve been in discussions with the Kennedy Space Center and Space Florida about facilities (at the spaceport),\u201d noted Jim Voss, SNC director of advanced programs and program executive for Dream Chaser to NASASpaceFlight.com.<\/p>\n<p>\u201c(However,) an OPF may not be the ideal facility for our vehicle, because they have all the structures that were specific to the shuttle that would have to be removed.<\/p>\n<p>\u201cWe need a large open area, because our vehicle is much more accessible than the Shuttle was, and we don\u2019t need hazardous operations because of our non toxic propellants we have on-board. But we are looking at using a facility at KSC for our processing.\u201d<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-25961\" title=\"Z34\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2012\/09\/Z34.jpg\" alt=\"\" width=\"351\" height=\"260\">A potential solution for Dream Chaser to take up residency in an OPF could mirror the Space Florida work for CST-100, where the building is converted into a clean floor processing facility, again by removing all the structures that were designed to care for a Shuttle orbiter.<\/p>\n<p>As previously reported, documentation has also shown that KSC\u2019s \u201cwish list\u201d is for all three OPFs to house new vehicles, namely CST-100, as already agreed, Dream Chaser in OPF-2 and the US Air Force\u2019s X-37B in OPF-1. All of these vehicles are currently expected to launch from Cape Canaveral, as opposed to Complex 39 at KSC \u2013 with the X-37B already with two missions under its belt.<\/p>\n<p>However, official discussions have taken place to potentially open up Complex 39 \u2013 and indeed the Vehicle Assembly Building (VAB) \u2013 to crewed Atlas V launches.<\/p>\n<p>Graphics \u2013 available in L2 LINK&nbsp;\u2013 show VAB integration and plans to modify one of the Shuttle Mobile Launch Platforms (MLPs) for Atlas V, while ULA noted the main area of discussion relates to the business model for using KSC\u2019s facilities. An article on Atlas V at KSC will follow next week.<\/p>\n<p>(Images via L2\u2019s SNC and CST-100 Sections, ULA, SNC, Boeing and Philip Sloss\/NASASpaceFlight.com)<\/p>\n<p>(With the shuttle fleet retired, NSF and&nbsp;L2 are providing full transition level coverage, available no where else on the internet, from Orion and SLS to ISS and COTS\/CRS\/CCDEV, to European and Russian vehicles.&nbsp;<\/p>\n<p>(Click here: http:\/\/www.nasaspaceflight.com\/l2\/&nbsp;\u2013 to view how you can access the best space flight content on the entire internet and directly support NSF\u2019s running costs)<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The removal of work stands in Orbiter Processing Facility -3 (OPF-3) will begin next week, as the former home to Shuttle orbiters is converted into the new processing facility for Boeing\u2019s future crewed spacecraft, CST-100. The conversion is expected to take a year, as the OPF changes call signs to the Commercial Crew and Cargo [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":30347,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":"","_links_to":"","_links_to_target":""},"categories":[2],"tags":[7758,8996,1565,9032],"class_list":["post-40030","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","tag-atlas-v","tag-ccdev","tag-cst-100","tag-opf"],"acf":[],"_links":{"self":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/40030"}],"collection":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/comments?post=40030"}],"version-history":[{"count":0,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/40030\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/media\/30347"}],"wp:attachment":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/media?parent=40030"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/categories?post=40030"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/tags?post=40030"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}