{"id":40148,"date":"2012-04-23T21:27:05","date_gmt":"2012-04-23T13:27:05","guid":{"rendered":"https:\/\/wp-productionenv-bjg9h2g2bgg5b8aa.southeastasia-01.azurewebsites.net\/news\/spacex-nasa-managers-decide-on-may-7-launch-date-following-slip\/"},"modified":"2012-04-23T21:27:05","modified_gmt":"2012-04-23T13:27:05","slug":"spacex-nasa-managers-decide-on-may-7-launch-date-following-slip","status":"publish","type":"post","link":"https:\/\/starpath.global\/news\/spacex-nasa-managers-decide-on-may-7-launch-date-following-slip\/","title":{"rendered":"SpaceX, NASA managers decide on May 7 launch date following slip"},"content":{"rendered":"<p>Following SpaceX\u2019s announcement that their Falcon 9 launch date will be slipping from its April 30 target, evaluations have been taking place \u2013 in cooperation with NASA \u2013 to ascertain when the Dragon spacecraft can make its debut attempt to berth with the International Space Station (ISS). With the NET date of May 7 now official, Dragon will have two opportunities before potential conflicts&nbsp;with an upcoming Soyuz mission.<\/p>\n<p>Falcon 9 Slippage:<\/p>\n<p>Being ready to launch is always a challenge, regardless if one is launching sounding rockets out of Wallops or Space Shuttles out of KSC. As such, any slip prior to launch should not be seen as a negative, but as a necessity of ensuring no stone is left unturned ahead of a launch and its subsequent mission.<\/p>\n<p>Although SpaceX\u2019s growing fan base sometimes treat the Californian company as an invincible force of nature in the spaceflight arena, their need to work within the decades of mission experience \u2013 provided by the likes of the Space Shuttle \u2013 has at least been proven by their own decision to slip the launch of their key Falcon 9\/Dragon mission, not only past the April 30 target, but also the May 3 reserve date, despite some confidence they could have made the latter.<\/p>\n<h4 class=\"widget-title penci-border-arrow\">See Also<\/h4>\n<ul>\n<li>SpaceX Forum Section<\/li>\n<li>L2 Dragon C2\/C3 Mission Special<\/li>\n<li>L2&nbsp;ISS Section<\/li>\n<li>Click here to Join L2<\/li>\n<\/ul>\n<p>\u201cAfter reviewing our recent progress, it was clear that we needed more time to finish hardware-in-the-loop testing and properly review and follow up on all data. While it is still possible that we could launch on May 3rd, it would be wise to add a few more days of margin in case things take longer than expected,\u201d noted SpaceX in a short release to the media on Monday.<\/p>\n<p>\u201cAs a result, our launch is likely to be pushed back by one week, pending coordination with NASA.\u201d<\/p>\n<p>The background to the slip began with last week\u2019s SpaceX Flight Readiness Review (FRR) and its subsequent overview to NASA managers assembled at the Johnson Space Center (JSC). Although the review was unlike the FRR\u2019s held for the Space Shuttle, NASA\u2019s involvement was required from a ISS standpoint, ensuring they were ready to receive the Dragon at the orbital outpost, in the event the spacecraft achieved its required flight milestones.<\/p>\n<p><img fetchpriority=\"high\" decoding=\"async\" class=\"alignleft size-full wp-image-24109\" title=\"Z317\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2012\/04\/Z3171.jpg\" alt=\"\" width=\"351\" height=\"277\">With this mission being a combined C2\/C3 demonstration \u2013 renamed to C2+ as a result \u2013 Dragon will have the opportunity to prove its Commercial Resupply Services (CRS) ambitions, after what will be only its second ride into space via its Falcon 9 launch vehicle.<\/p>\n<p>Space Technology<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>NASA mission patches<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>SpaceX launch tickets<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>\n<p>     (adsbygoogle = window.adsbygoogle || []).push({});<\/p>\n<p>Once on orbit, during what is know as far field phasing, Dragon will then head into proximity operations, riding on a racetrack around the ISS, communicating with Space Station, prior to rendezvous operations and hopefully berthing operations via the Space Station Remote Manipulator System (SSRMS).<\/p>\n<p>This latter \u2013 and historic \u2013 milestone requires the software on the Dragon to perform flawlessly. However, by the time of the NASA overview, SpaceX still had one additional simulation to run on its software, via an avionics package SpaceX CEO Elon Musk described as a \u201cbrain in a tub\u201d on a bench at their headquarters.<\/p>\n<p>This \u201chardware in the loop\u201d system is understood to have the name \u201cDragon Force\u201d, a system that allows multiple hardware and software test scenarios to be run in parallel. It is the challenges of fine tuning this programming \u2013 such as avoiding aborts being called by the software when an abort was not required, in addition to its data being seen as acceptable and in compliance with the ISS\u2019 operations \u2013 that requires additional time.<\/p>\n<p>Click here for other Dragon News Articles: http:\/\/www.nasaspaceflight.com\/tag\/dragon\/<\/p>\n<p>Mr Musk, in tweeting confirmation of the slip, described delay as related to requiring more time to test the docking code, pointing towards the software\u2019s role ahead of berthing with the ISS.<\/p>\n<p>New Launch Date:<\/p>\n<p>In the run up to the April 30 target, SpaceX engineers were tasked with several milestones on the processing flow, including the loading of hypergolics on the Dragon. That operation had been rescheduled for Monday, per L2 processing information (L2 Link), although it has yet to be confirmed if the hyper-loading was completed, other than sources note the area had been closed earlier in the day \u2013 per the hazardous nature of such an operation.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-24110\" title=\"Z3\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2012\/04\/Z319.jpg\" alt=\"\" width=\"349\" height=\"238\">The most important pre-launch day objective is the Static Fire of the Falcon 9\u2019s engines. This had been set for April 25, prior to slipping to April 26 after the flow was interrupted by poor weather last week, prior to slipping once again to April 27 after it had been revealed the next Delta IV due to launch out of Cape Canaveral wanted to conduct some unspecified tests, and thus required ownership of the range (L2 Link to information).<\/p>\n<p>With Falcon 9 receiving a rollout review on Sunday and Dragon\u2019s status requiring its own review meeting on Monday \u2013 with NASA being informed of their wish to slip mid-way through Monday \u2013 the next FRR style meeting for SpaceX is understood to be taking place on Friday, thus the April 27 Static Fire is likely to be delayed until next week.<\/p>\n<p>As far as the launch date, L2 sources within the industry have noted several potential dates, although most appear to be centering around a NET (No Earlier Than) target of May 7, with a back up date of May 10. That date was confirmed as the official target on Tuesday.<\/p>\n<p>\u201cNASA and the Cape Canaveral Air Force Station have approved SpaceX\u2019s request to set May 7th as the target launch date for the upcoming COTS 2 mission,\u201d noted SpaceX.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-24111\" title=\"linktoarticleplease21\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2012\/04\/linktoarticleplease211.gif\" alt=\"\" width=\"350\" height=\"230\">As always, the key player in deciding the actual target date is&nbsp;the International Space Station, specifically its forever busy Visiting Vehicle (VV) status.<\/p>\n<p>(Animation created from 70 hi res ATV-3 docking images acquired by L2 \u2013 LINK).<\/p>\n<p>In noting the unique nature of this demonstration mission \u2013 one of the key elements related to why there are no 24 hour scrub turnarounds for the Falcon 9 \u2013 Flight Director Holly Ridings expanded on the additional challenges of finding a launch slot for the Dragon.<\/p>\n<p>\u201cWe\u2019ve got Soyuz flights coming and going, we\u2019ve got Progress flights coming and going, we\u2019ve got ATV activities, so the ISS trajectory is in flux,\u201d noted Ms Ridings in answer to a question from NASASpaceflight.com\u2019s Philip Sloss during the post review media briefing late last week. \u201cWhen you add up all of the different components, you end up with a splattering of launch dates in the early May timeframe.\u201d<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-24112\" title=\"Z4\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2012\/04\/Z420.jpg\" alt=\"\" width=\"344\" height=\"226\">Once this demonstration flight is completed, the data gained will allow for refined calculations that \u2013 as confirmed by Mr Musk \u2013 should allow for back-to-back launch date opportunities, with additional help from the propellant usage ratio by the Dragon, as the demo flight looks to reserve as much contingency as possible for the C2+ mission, allowing for the expansion of options on orbit.<\/p>\n<p>Even the usual launch date challenges come into play in regard to the availability of May launch dates, all of which add to the need for careful planning ahead of a new target being announced.<\/p>\n<p>\u201cThere\u2019s certainly range conflicts, there\u2019s always range conflicts. There are some beta cut outs for the Space Station, there are some ground rules constraint cut outs where we don\u2019t want a Soyuz vehicle and a Dragon vehicle exactly on top of each other \u2013 we\u2019ve got to get one activity completed before we start the next one,\u201d added Ms Ridings.<\/p>\n<p>\u201cThe Dragon has some constraints for its recovery, where for this demonstration flight they\u2019d like to land in daylight for the recovery operations. So there are multiple constraints on the table that we need to line up to optimize a launch window for this demonstration mission.\u201d<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-24113\" title=\"Z5\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2012\/04\/Z513.jpg\" alt=\"\" width=\"349\" height=\"223\">Based on the above, the largest challenge may come from Russia, as they prepare to launch their next Soyuz on May 15 (3am GMT) to the ISS. With proximity between Dragon\u2019s launch date and Soyuz closing as SpaceX slip, the need to avoid the two vehicles \u201cbeing on top of each other\u201d \u2013 as Ms Ridings put it \u2013 may result in NASA managers advising Dragon moves to the other side of the Soyuz launch date, to around May 19 in the event of issues causing further delays past the May 7 and May 10 launch opportunities.<\/p>\n<p>Such a decision would also result in Falcon 9 being a night launch based on the T-0 time.<\/p>\n<p>It was likely a new launch date wouldn\u2019t be revealed by NASA until the end of the week, based on updated status into the Dragon software testing at SpaceX. However, SpaceX confirmed the May 7 launch date on Tuesday to the media, meaning this is a NET (No Earlier Than) target, pending the conclusion of software evaluations.<\/p>\n<p>(Images: L2\u2019s SpaceX Dragon C2\/C3 Mission Special Section \u2013 Containing presentations, videos, images,&nbsp;interactive high level updates and more,&nbsp;with additional images via NASA, SpaceX and Roscosmos).&nbsp;<\/p>\n<p>(Click here: http:\/\/www.nasaspaceflight.com\/l2\/&nbsp;\u2013 to view how you can access the best space flight content on the entire internet).<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Following SpaceX\u2019s announcement that their Falcon 9 launch date will be slipping from its April 30 target, evaluations have been taking place \u2013 in cooperation with NASA \u2013 to ascertain when the Dragon spacecraft can make its debut attempt to berth with the International Space Station (ISS). With the NET date of May 7 now [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":30479,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":"","_links_to":"","_links_to_target":""},"categories":[2],"tags":[1395,479,233,316],"class_list":["post-40148","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","tag-dragon","tag-falcon-9","tag-iss","tag-spacex"],"acf":[],"_links":{"self":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/40148"}],"collection":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/comments?post=40148"}],"version-history":[{"count":0,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/40148\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/media\/30479"}],"wp:attachment":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/media?parent=40148"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/categories?post=40148"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/tags?post=40148"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}