{"id":40271,"date":"2011-11-25T18:27:13","date_gmt":"2011-11-25T10:27:13","guid":{"rendered":"https:\/\/wp-productionenv-bjg9h2g2bgg5b8aa.southeastasia-01.azurewebsites.net\/news\/the-respected-rocket-atlas-v-making-the-early-strides-of-the-transition\/"},"modified":"2011-11-25T18:27:13","modified_gmt":"2011-11-25T10:27:13","slug":"the-respected-rocket-atlas-v-making-the-early-strides-of-the-transition","status":"publish","type":"post","link":"https:\/\/starpath.global\/news\/the-respected-rocket-atlas-v-making-the-early-strides-of-the-transition\/","title":{"rendered":"The Respected Rocket \u2013 Atlas V making the early strides of the transition"},"content":{"rendered":"<p>While fancy youtube videos and twitter-based cheer-leading continues to be the weapon of&nbsp;choice&nbsp;against the post-Shuttle era&nbsp;depression, one vehicle is quietly going about its business with tangible results, as opposed to backslapping tweets. The Atlas V launch vehicle \u2013 about to launch a mission to Mars \u2013 is on a winning streak, which includes strides towards its future crewed ambitions.<\/p>\n<p>Atlas V&nbsp;\u2013 \u201cWinning!\u201d:<\/p>\n<p>With rollout complete for Saturday\u2019s launch of Mars Science Laboratory (MSL) from Cape Canaveral, the United Launch Alliance (ULA) vehicle is aiming for its 28th success in a row, a 100 percent record since its maiden launch in 2002.<\/p>\n<p>The two stage rocket is driven by the Russian-built RD AMROSS RD-180 engine \u2013 a kerosene\/liquid oxygen derivative of the RD-170 engine developed for the Zenit boosters of the Energia rocket \u2013 with a Centaur Upper Stage powered by Pratt &amp; Whitney\u2019s RL10 engine burning liquid hydrogen and liquid oxygen. Atlas V configurations can include Aerojet strap-on boosters.<\/p>\n<h4 class=\"widget-title penci-border-arrow\">See Also<\/h4>\n<ul>\n<li>Commercial Crew Forum<\/li>\n<li>L2 Future&nbsp;Vehicles&nbsp;Section<\/li>\n<li>L2 ISS&nbsp;Section<\/li>\n<li>Click here to Join L2<\/li>\n<\/ul>\n<p>The Atlas V is a flight-proven expendable launch vehicle and is currently used by NASA and the Department of Defense (DOD) for critical space missions to launch highly expensive payloads into orbit. Now, Atlas V is&nbsp;walking down the path of proving it can be entrusted with launching humans into orbit.<\/p>\n<p>The MSL launch will be the second flagship mission of the year, following the successful launch of NASA\u2019s Juno probe, which is currently on its way to Jupiter.<\/p>\n<p>With numerous spacecraft successfully lofted uphill, Atlas V\u2019s reliability continues to be an attractive proposition in the launch services industry, despite the continued rise of Arianespace\u2019s industry-leading Ariane 5, and the new kids on the block, such as SpaceX\u2019s Falcon 9 range.<\/p>\n<p>However, the major challenge \u2013 one which reaches back into the heritage of the Atlas launch vehicle family \u2013 is yet to come, centered around NASA\u2019s Commercial Crew Development (CCDev-2) contracts.<\/p>\n<p>Aerospace industry analysis<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>Rocket launch schedules<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>NASA mission updates<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>\n<p>     (adsbygoogle = window.adsbygoogle || []).push({});<\/p>\n<p>Click here for recent Atlas V specific articles:&nbsp;http:\/\/www.nasaspaceflight.com\/tag\/atlas-v\/<\/p>\n<p>Humans On Atlas V:<\/p>\n<p>Ridiculed by previous NASA evaluations during the a period of what sources claim was \u201cprotection\u201d for the now-defunct Ares I, Atlas V was shunned from crewed mission viability via the notion of \u201cblack zones\u201d \u2013 a claim that the vehicle\u2019s trajectory was unable to safely abort a crewed mission in the event of a serious failure.<\/p>\n<p>It was documented that NASA considered \u2013 and rejected \u2013 the use of Atlas V as a Space Shuttle replacement for human space flight during their Exploration Systems Architecture Study (ESAS) in 2005. However, this was mainly based on the heavy Orion crew vehicle of the time.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-22010\" title=\"F8\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2011\/11\/F8.jpg\" alt=\"\" width=\"140\" height=\"280\">Just one year later, in 2006, Lockheed Martin noted that for a 20mt crew vehicle, there was enough margin in the Atlas V 401\u2032s flight envelope to allow the crew to safely abort at any time during launch, closing all unsafe \u2018black-zones\u2019. Also, for such a mass requirement, structural loads on the vehicle would be decreased to the point all primary structures meet NASA 1.4 Factor of Safety margins.<\/p>\n<p>Analysis also showed the Russian-built RD-180 engine in this regime revealed only one component that \u201cfell a hair below\u201d the 1.4 margin, at a 1.38 Factor of Safety. This led to the 2006\/2007 agreements with Bigelow Aerospace for crew transportation requirements to the planned commercial space hotel complex.<\/p>\n<p>Little more was heard for a few years, as Atlas V continued to loft payload after payload successfully into orbit, that was until the Commercial Crew drive by NASA, as the Agency scrambled to close the gap between the retirement of the Shuttle\u2019s NASA role and the handover of Low Earth Orbit (LEO) to commercial companies.<\/p>\n<p>The breakthrough for Atlas V came in July of this year, as ULA signed an agreement with NASA for an unfunded Space Act Agreement (SAA) to work on human rating the launch vehicle, with the goal of certifying Atlas V to launch NASA astronauts riding in vehicles such as the Dream Chaser, Boeing CST-100 and Blue Origin\u2019s spacecraft.<\/p>\n<p><img fetchpriority=\"high\" decoding=\"async\" class=\"alignleft size-full wp-image-22011\" title=\"A613\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2011\/11\/A613.jpg\" alt=\"\" width=\"350\" height=\"240\">The process \u2013 which includes NASA managers providing oversight into the evaluations \u2013 is proceeding to plan, as ULA successfully completed the second required major performance milestone, known as the Design Equivalency Review (DER), which completes a rigorous assessment of the flight-proven Atlas V launch vehicle\u2019s compliance with NASA human spaceflight requirements.<\/p>\n<p>To successfully complete the DER, NASA human spaceflight experts and ULA engineers worked over a span of several months to perform a detailed review of all NASA requirements and processes, and identified the extent to which the Atlas V meets those requirements.<\/p>\n<p>With a hat-tip to how Atlas V is already entrusted with the safe flight of billion dollar spacecraft, the need for any lengthy and inherently risky launch vehicle development program is expected to be avoided.<\/p>\n<p>\u201cThe Design Equivalency Review allowed the NASA team to compare their stringent human spaceflight requirements against the Atlas V design and demonstrated performance,\u201d noted George Sowers, vice president of business development and advanced programs.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-22013\" title=\"A3151\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2011\/11\/A31511.jpg\" alt=\"\" width=\"234\" height=\"391\" srcset=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2011\/11\/A31511.jpg 234w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2011\/11\/A31511-209x350.jpg 209w\" sizes=\"(max-width: 234px) 100vw, 234px\">\u201cThe ULA team benefited greatly from NASA\u2019s insight and expertise. The completion of the DER is one more step towards confirming that Atlas V is the best choice for providing near-term, safe and affordable launch services for NASA human spaceflight.<\/p>\n<p>\u201cWith 27 consecutive successes \u2013 98 for the Atlas program as a whole \u2013 Atlas V provides the highest confidence, lowest risk solution for human spaceflight.\u201d<\/p>\n<p>ULA \u2013 announcing the news this week \u2013 also noted that as NASA moves forward into the first phase of the Commercial Crew Integrated Design Contract (CCIDC), ULA are confident they will be the launch provider of choice to offer human-certified Atlas launch services to meet the needs for the crew transportation system providers.<\/p>\n<p>\u201cThe CCIDC is the critical first step towards creating a robust commercial crew transportation capability to low-Earth orbit (LEO).&nbsp; ULA looks forward to continued work with our customers and NASA to develop a U.S. crew space transportation capability providing safe, reliable and cost-effective access to LEO and the International Space Station.\u201d added Dr Sowers.<\/p>\n<p>Other milestones in work include the Development of Hazard Analyses unique for human spaceflight, the Development of a Probabilistic Risk Assessment (PRA), the Documenting of Atlas V CTS (Crew Transportation System) certification baseline, and to Conduct Systems Requirements Review (SRR).<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-22012\" title=\"A417\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2011\/11\/A4171.jpg\" alt=\"\" width=\"349\" height=\"231\" srcset=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2011\/11\/A4171.jpg 349w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2011\/11\/A4171-263x175.jpg 263w\" sizes=\"(max-width: 349px) 100vw, 349px\">The majority of this process is expected to be completed by the end of this year (2011), with the SAA allowing ULA to work with NASA to gain invaluable insight into their unparalleled expertise in Human Spaceflight. Through this SAA, NASA\u2019s Commercial Crew Program and ULA will establish an Atlas V system baseline compliance with NASA CTS requirements and processes.<\/p>\n<p>A large part of the effort is focused on the continued development of an Emergency Detection System prototype test bed. The EDS will monitor critical launch vehicle and spacecraft systems and issue status, warning and abort commands to crew during their mission to low Earth orbit.<\/p>\n<p>EDS is the sole significant element necessary for flight safety to meet the requirements to certify ULA\u2019s launch vehicles for human spaceflight, a certification ULA are confident of acquiring.<\/p>\n<p>Atlas V\u2019s Commercial Crew Passengers:<\/p>\n<p>While Atlas V makes progress towards becoming a Commercial Crew provider, the transports which have already opted to fly with the ULA vehicle are also pushing forward with their CCDev-2 goals \u2013 with varying levels of success.<\/p>\n<p>Boeing and their CST-100 spacecraft \u2013 recently signed a 15 year lease to utilize Orbiter Processing Facility (OPF-3) at the Kennedy Space Center (KSC). The deal was announced following a NASA agreement with Space Florida \u2013 the State\u0092s aerospace economic development agency.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-22014\" title=\"C71\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2011\/11\/C71.jpg\" alt=\"\" width=\"324\" height=\"324\">Boeing are currently working through their CCDev-2 contract milestones \u2013 worth over $92m \u2013 which is centered around their CST-100 capsule, a vehicle which is configurable to carry up to seven crew\/passengers or an equivalent combination of passengers and pressurized cargo to LEO destinations, including the ISS and the BA-330 space complex.<\/p>\n<p>While their CST-100 capsule is compatible with multiple launch vehicles, the Atlas V was confirmed as the initial LV of choice, following their August, 2011 deal.<\/p>\n<p>According to an expansive CCDev-2 presentation \u2013 acquired by L2 \u2013 development kicked off with a Delta Systems Definition Review, followed by a Phase 0 Safety review, both of which were completed in May. A Landing Air Bag drop demo was completed in August, followed by Phase 1 Wind Tunnel Tests.<\/p>\n<p>October was on the schedule for the Interim Design Review (IDR) take place \u2013 although its completion is yet to be confirmed \u2013 with a Parachute Drop Test demo on the books for next April, part of a total of 25 CCDev2 milestones.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-22015\" title=\"F3\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2011\/11\/F32.jpg\" alt=\"\" width=\"344\" height=\"254\">Boeing plans to use wind tunnel testing of the Atlas V and the CST-100 this year to complete a Preliminary Design Review (PDR) of the integrated system in 2012 under the second round of its Commercial Crew Development Space Act Agreement with NASA.<\/p>\n<p>The run up to the PDR will include Service Module Propellant Tank Development Tests and the Launch Vehicle Emergency Detection System (EDS)\/Avionics System Integration Facility Interface Simulation testing taking place.<\/p>\n<p>Boeing claim they will be ready to provide services by 2015, a target date which is being used by most of the CCDev-2 award winners, as much as recent concerns over NASA funding is threatening slips in the schedule by one to two years.<\/p>\n<p>Blue Origin\u2019s $22m award was for their their biconic-shape capsule, which will initially launch with the Atlas V launch vehicle, prior to hitching a lift uphill via its own Reusable Booster System (RBS).<\/p>\n<p>The vehicle is capable of carrying seven passengers \u2013 with an ability for cargo runs \u2013 to the ISS, and will be available for independent commercial flights for science, adventure and trips to other orbital destinations.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-22009\" title=\"C7\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2011\/11\/C7.jpg\" alt=\"\" width=\"348\" height=\"257\">It is also capable of a 210 day ISS lifeboat role, something Orion (MPCV) was going to be tasked with during its dark days surrounding the cancellation of the Constellation Program&nbsp;(CxP), prior to being re-promoted as a Beyond Earth Object (BEO) vehicle by NASA.<\/p>\n<p>The Blue Origin vehicle has mostly shunned the public limelight, although the aforementioned CCDev-2 presentation provided some details on the key development milestones.<\/p>\n<p>\u201cDuring CCDev-2, Blue Origin with mature their Space Vehicle design through System Requirements Review (SRR), mature the Pusher Escape System, and accelerate engine development for the Reusable Booster System (RBS),\u201d noted the presentation.<\/p>\n<p>While all of the aforementioned events have received their \u201ckick off\u201d meetings, the listed milestones include the Space Vehicle Mission Concept Review in September, ahead of key Pusher Escape Test Vehicle shipment and ground firing either side of the new year.<\/p>\n<p>However, Blue Origin did receive a set-back on August 24 in Texas, when an in-flight failure of their second test vehicle \u2013 known as the Vertical-Takeoff, Vertical-Landing (VTVL) test vehicle was suffered at 45,000 feet\/Mach 1.2, caused by flight instability triggering the range safety system and shut down the vehicle\u2019s engines.<\/p>\n<p>A Pusher Escape Pad Escape Test is scheduled for April, 2012, followed by the SRR in May \u2013 the month which will result in the opening RBS Engine Thrust Chamber Assembly (TCA) test.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-22016\" title=\"F4\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2011\/11\/F43.jpg\" alt=\"\" width=\"344\" height=\"214\">Sierra Nevada Corporation (SNC) and their Dream Chaser (DC) Space System (DCSS)&nbsp;provides the poster child of the Atlas V options, given it is the only \u201cspace plane\u201d option, as seen via its \u201cbaby orbiter\u201d appearance.<\/p>\n<p>Dream Chaser is a Reusable, Piloted Lifting Body, Derived from NASA HL\u00ad\u201020 launching on an Atlas V, with SNC currently working through 19 milestones via its $80m CCDev-2 effort \u2013 the latter of which is listed as the Free Flight Test, which will be a piloted Flight test from carrier aircraft to characterize handling qualities and approach and landing.<\/p>\n<p>Milestones, which are listed alongside a schedule document \u2013 include a Systems Requirements Review (SRR), Canted Airfoil Fin Selection, and work on their Cockpit Based Flight Simulator \u2013 all completed in June and July.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-22008\" title=\"F2\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2011\/11\/F24.jpg\" alt=\"\" width=\"349\" height=\"226\">SNC officially announced the confirmation of the Cockpit Based Flight Simulator milestone \u2013 albeit only this month \u2013&nbsp; a milestone which assists Dream Chaser engineers in evaluating the vehicle\u2019s characteristics during the piloted phases of flight.<\/p>\n<p>Also noted was the activation of the Dream Chaser Program\u2019s Vehicle Avionics Integration Laboratory (VAIL), completed in September. VAIL is a platform for Dream Chaser avionics development, engineering testing, and integration, and will also be used for verification and validation of avionics and software. The lab is linked to the Cockpit Based Simulator hardware and software for integrated system testing.<\/p>\n<p>\u201cThe Dream Chaser team, which includes SNC as well as our industry teammates and our NASA partners, has made tremendous progress over the last four months,\u201d noted Jim Voss, Vice President of SNC\u2019s Space Exploration Systems. \u201cOur simulator and avionics lab give us the ability to do engineering evaluations of our complex systems.&nbsp;<\/p>\n<p>\u201cThese successful Milestones, completed on time and within budget, reflect the rapid progress possible in the NASA Commercial Crew Program.\u201d<\/p>\n<p>Other listed notables include the delivery of the Engineering Test Article (ETA) in December, prior to the Preliminary Design Review (PDR) \u2013 scheduled for the end of May, 2012.<\/p>\n<p>(Images: L2 Content, NASA CCDev, SNC, ULA, Boeing)<\/p>\n<p>(As the shuttle fleet retire, NSF and&nbsp;L2 are providing full transition level coverage, available no where else on the internet, from Orion and SLS to ISS and COTS\/CRS\/CCDEV, to European and Russian vehicles.&nbsp;<\/p>\n<p>(Click here: http:\/\/www.nasaspaceflight.com\/l2\/&nbsp;\u2013 to view how you can access the best space flight content on the entire internet)<\/p>\n","protected":false},"excerpt":{"rendered":"<p>While fancy youtube videos and twitter-based cheer-leading continues to be the weapon of&nbsp;choice&nbsp;against the post-Shuttle era&nbsp;depression, one vehicle is quietly going about its business with tangible results, as opposed to backslapping tweets. The Atlas V launch vehicle \u2013 about to launch a mission to Mars \u2013 is on a winning streak, which includes strides towards [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":"","_links_to":"","_links_to_target":""},"categories":[2],"tags":[7758,509,670,7796,1565,970,363],"class_list":["post-40271","post","type-post","status-publish","format-standard","hentry","category-news","tag-atlas-v","tag-blue-origin","tag-boeing","tag-commercial","tag-cst-100","tag-dream-chaser","tag-ula"],"acf":[],"_links":{"self":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/40271"}],"collection":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/comments?post=40271"}],"version-history":[{"count":0,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/40271\/revisions"}],"wp:attachment":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/media?parent=40271"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/categories?post=40271"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/tags?post=40271"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}