{"id":40295,"date":"2011-10-24T19:51:51","date_gmt":"2011-10-24T11:51:51","guid":{"rendered":"https:\/\/wp-productionenv-bjg9h2g2bgg5b8aa.southeastasia-01.azurewebsites.net\/news\/iss-community-reviews-station-progress-anomalies-and-upcoming-flights\/"},"modified":"2011-10-24T19:51:51","modified_gmt":"2011-10-24T11:51:51","slug":"iss-community-reviews-station-progress-anomalies-and-upcoming-flights","status":"publish","type":"post","link":"https:\/\/starpath.global\/news\/iss-community-reviews-station-progress-anomalies-and-upcoming-flights\/","title":{"rendered":"ISS Community reviews Station Progress, Anomalies, and Upcoming Flights"},"content":{"rendered":"<p>As part of standard operating procedure, the ISS community has completed a review of the International Space Station\u2019s systems \u2013 noting both progress and anomalies on the orbiting laboratory as well as reviewing preparations for the upcoming Dragon, Cygnus, and HTV-3 flights.<\/p>\n<p>Robotics and EVA activities:<\/p>\n<p>Opening the ISS systems status review was an update on the robotics and EVA systems on the International Space Station. Specifically, the robotics and EVA division noted an amazingly clean performance of all related systems in the preceding months, with no issues being reported.<\/p>\n<p>This, coupled with no upcoming robotics activities on the ISS until December, will make for a relatively quiet period of time for the three-person ISS crew through the remainder of October and the month of November.<\/p>\n<p><img fetchpriority=\"high\" decoding=\"async\" class=\"alignleft size-full wp-image-21598\" title=\"B4\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2011\/10\/B44.jpg\" alt=\"\" width=\"351\" height=\"261\">The next scheduled robotics activity on the ISS, in fact, is set to be the walk-off of the SSRMS (Space Station Remote Manipulator System) arm to Node-2\/Harmony for \u201csupport of the Dragon mission and high-res LEE snare cable photography,\u201d notes the MOD Robotics operations presentation \u2013 available for download on L2.<\/p>\n<p>EVA systems and support structures also received little mention in the \u201cpreceding months\u201d category. However, internal NASA documentation indicated that GMT days 290-292 (Oct. 17-19) and 298 (Oct. 25) were\/will be spent by performing system and equipment maintenance in the EVA realm.<\/p>\n<p>Specifically, GMT days 290-292 were spent performing maintenance on the NiMH batteries, EMU (Extravehicular Mobility Unit \u2013 spacesuit) water maintenance, and crewlock cleanout.<\/p>\n<p>Airlock switch recongifuration verification will take place tomorrow, GMT day 298.<\/p>\n<p>Rocket launch schedules<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>Space Technology<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>Space tourism guides<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>\n<p>     (adsbygoogle = window.adsbygoogle || []).push({});<\/p>\n<p>Click here for ISS News Articles: http:\/\/www.nasaspaceflight.com\/tag\/iss\/<\/p>\n<p>EMU water maintenance specifically included \u201cextra iodination in preparation for possible de-crewing of ISS\u201d \u2013 an added precaution as Russian space agency officials continue to work recovery efforts from the failed Progress resupply craft launch in August of this year.<\/p>\n<p>Currently, ISS de-crew is not considered likely as Russian officials track a mid-November (~Nov. 14th) launch of the next ISS crew increment to the Station in a Soyuz spacecraft. The Nov. 14th launch of Soyuz will mark the 111th Soyuz flight since flight operations began in 1967 and the 22nd and final flight of the Soyuz TMA spacecraft \u2013 which is being replaced with the upgraded Soyuz TMA-M series.<\/p>\n<p>ISS Systems Status: Failures and completed\/upcoming work:<\/p>\n<p>While robotics and EVA operations have been light in recent and upcoming months, general upkeep and maintenance of the International Space Station has continued along with science and research objectives.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-21596\" title=\"B2\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2011\/10\/B25.jpg\" alt=\"\" width=\"347\" height=\"263\">Specifically, the ISS Systems Status presentation reviewed ISS systems failures and recovery\/investigation results from these failures.<\/p>\n<p>The first such failures mentioned were two EPS system anomalies.<\/p>\n<p>\u201cFailure: On September 23rd, AR 5543 \u2013 RPCM LA1A4A_C RPC 4 Trip. Impact: Loss of redundant power feed to Express Rack 2 (LAB1O1 Rack). Rack contains Ku-Band receiver.\u201d<\/p>\n<p>On October 17, crewmembers R&amp;Red (removed and replaced) the RPCM LA1A4A unit to recover redundant power to the Stations\u2019 Ku-band antenna receiver. Likewise, the RPCM LA1B-H was then R&amp;Red the following day to \u201crecover second of two smoke detectors in Lab\u201d (Destiny module),\u201d notes the ISS System overview presentation \u2013 also available for download on L2.<\/p>\n<p>This resulted in the recovery of all systems from the September 23rd failure.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-21597\" title=\"B3\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2011\/10\/B35.jpg\" alt=\"\" width=\"348\" height=\"246\">The second EPS failure was an Oct. 12th event in which six of the eight lights in the Permanent Multipurpose Module (PMM) Leonardo turned off because of a recurring software \u201covercurrent FDIR\u201d unique to the PMM General Luminaire Assembly.<\/p>\n<p>The problem was resolved by temporarily disabling the FDIR and repowering all the lights. However, this repowering failed to illuminate any of the six failed lights.<\/p>\n<p>A forward plan was developed to replace the failed Lamp Housing Assembly \u201cas crew desire\/timeline allows.\u201d<\/p>\n<p>The presentation further notes a failure of the Urine Processing Assembly, specifically the Fluids Control Pump Assembly (FCAP).<\/p>\n<p>\u201cFailure: UPA Fluids Control Pump Assembly (FCPA) failure. FCPA was able to be restarted several times, but eventually high current draw prevented subsequent re-starts. Impact: Loss of Urine processing function. The UPA cannot operate without the FCPA,\u201d notes the ISS systems presentation.<\/p>\n<h4 class=\"widget-title penci-border-arrow\">See Also<\/h4>\n<ul>\n<li>ISS Forum Section<\/li>\n<li>L2&nbsp;ISS Section<\/li>\n<li>Click here to Join L2<\/li>\n<\/ul>\n<p>The FCPA was subsequently replaced on September 23rd and the UPA regained full operational capabilities.<\/p>\n<p>The final failure mentioned in the ISS systems presentation was a September 30th failure of the Russian Contingency Telemetry asset.<\/p>\n<p>\u201cOn September 30th, MCC-H performed a command and telemetry test via the Russian assets. Following a successful test, MCC-M was unable to command Russian Contingency Telemetry (RCT) on or off.<\/p>\n<p>\u201cIt was determined that all commands originating from the Russian Segment sent to the US Segment were being rejected by the C&amp;C MDM (Command and Control Multiplexer\/Demultiplexer) due to a \u2018Time Authentication\u2019 bit set in commands from the SMCC.\u201d<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-21599\" title=\"B5\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2011\/10\/B54.jpg\" alt=\"\" width=\"350\" height=\"265\">This failure meant that Mission Control Moscow (MCC-M) could not command RCT enabled or inhibited and that the crew could not silence a caution and warning tone from the C&amp;W panel in the Russian Segment of the ISS.<\/p>\n<p>Station Mode transitions could also not be executed if sent from the SMCC to CCS.<\/p>\n<p>To counter this failure, Mission Control Houston commanded the RCT enabled and inhibited for Moscow and the crew was \u201cinformed to use the PCS laptops to silence tones in the RS segment.\u201d<\/p>\n<p>Preparations were also made to use the US operating segment of the ISS to send station mode transition commends if needed until the issue could be fully resolved.<\/p>\n<p>Mission Control Moscow developed and sent a command to \u201creverse the \u2018Time Authentication\u2019 bit in the SMCC to turn off time authentication for commands being sent from the RS segment to the US segment\u201d on Oct. 5 \u2013 which corrected the on-orbit problem.<\/p>\n<p>A root cause investigation is still ongoing at this time.<\/p>\n<p>To the end of the year: preparing for Dragon, Cygnus, and HTV-3:<\/p>\n<p>As ISS operations move into their final phase for calendar year 2011, preparations are also continuing for the first approach and rendezvous of SpaceX\u2019s Dragon resupply craft, the first test flight of Orbital\u2019s Cygnus resupply craft, and the third mission of JAXA\u2019s (Japan Aerospace Exploration Agency\u2019s) HTV resupply craft to the International Space Station.<\/p>\n<p>Dragon:<\/p>\n<p>In preparation for the upcoming Dragon flight, NASA is in the process of updating all procedural handbooks and procedures themselves to reflect the Dragon configuration that is scheduled to fly the ISS rendezvous mission in December. (45 proc handbooks from the ISS side of operations are available in L2).<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-21600\" title=\"A62\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2011\/10\/A622.jpg\" alt=\"\" width=\"351\" height=\"242\">\u201cDragon Demo will fly on CCS R9\/MSS 6.3\/PCS R13. Updating procedures to be consistent with this configuration,\u201d notes the presentation.<\/p>\n<p>Testing and certification are scheduled to be completed today, October 24, and work is ongoing to \u201cdetermine how newly-certified PCS and CDDT can be available for Dragon Demo mission.\u201d<\/p>\n<p>Additionally, teams are looking at synchronization issues between Dragon and RWS.<\/p>\n<p>\u201cIn Stage test risk mitigation\/dry-run, saw RWS data drop in and out on crew overlay displays. RWS looking for consecutive, incrementing values of Dragon time (1-2-3-4, not 1-3-4-6) to confirm good link (and therefore valid data) between Dragon and ISS.\u201d<\/p>\n<p>A short-term mitigation plan for this issue is to include a filter on RWS which will result in an informational hold until three invalid counts have been received before data drops begin.<\/p>\n<p>A more long-term solution is being worked to update the RWS software. This update was supposed to have already taken place; however, Expedition 29 crew prioritizations with only a three-person crew have delayed the software update until at least November 28.<\/p>\n<p>The requirement for the software update is for it to be in place No Later Than 30 days before the scheduled launch of Dragon. That launch is currently targeted for Dec. 19 \u2013 just 21 days after the software update is scheduled to be installed.<\/p>\n<p>Cygnus:<\/p>\n<p>While preparations for Dragon\u2019s flight continue, work is also progressing on readiness operations for the first test flight of Orbital\u2019s Cygnus spacecraft.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-21601\" title=\"A78\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2011\/10\/A782.jpg\" alt=\"\" width=\"350\" height=\"255\">\u201cCygnus Demo flying on new CCS R9\/MSS 7.1\/R11 Recon\/PCS R13 configuration,\u201d notes the Expedition Vehicle Division presentation to MOD \u2013 available for download on L2.<\/p>\n<p>Open work ahead of this flight, scheduled for January 2012, includes ICATT re-work to \u201censure CCS R9 vehicle data path cmds\/tlm available with R11 recon and updating procedures affected by data path configuration and PCS R13 navigation changes.<\/p>\n<p>\u201cOrbital\u2019s command\/telemetry ground system unable to send valid IPCL and Sendback data, which affects ability to verify displays, and eventually, to sim.\u201d<\/p>\n<p>End to end testing on these data paths is expected in November. Additional testing will take place in February 2012.<\/p>\n<p>HTV-3:<\/p>\n<p>Finally, preparations are also underway for the February 18, 2011 launch of the HTV-3 (H-II Transfer Vehicle 3) resupply craft from the Tanegashima Space Center in southern Japan.<\/p>\n<p>Only standard open work remains for this flight at this time: updating procedures from this year\u2019s HTV-2 mission to account for flight rule updates and vehicle design changes.<\/p>\n<p>The flight of HTV-3 will also mark the first time when FOR will not be required for HTV.<\/p>\n<p>(Images: NASA, Space X, Orbital and&nbsp;L2 Documentation) (As the shuttle fleet retire, NSF and&nbsp;L2 are providing full transition level coverage, available no where else on the internet, from Orion and SLS to ISS and COTS\/CRS\/CCDEV, to European and Russian vehicles.&nbsp;<\/p>\n<p>(Click here: http:\/\/www.nasaspaceflight.com\/l2\/&nbsp;\u2013 to view how you can access L2)<\/p>\n","protected":false},"excerpt":{"rendered":"<p>As part of standard operating procedure, the ISS community has completed a review of the International Space Station\u2019s systems \u2013 noting both progress and anomalies on the orbiting laboratory as well as reviewing preparations for the upcoming Dragon, Cygnus, and HTV-3 flights. Robotics and EVA activities: Opening the ISS systems status review was an update [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":29677,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":"","_links_to":"","_links_to_target":""},"categories":[2],"tags":[639,1395,1839,233],"class_list":["post-40295","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","tag-cygnus","tag-dragon","tag-htv","tag-iss"],"acf":[],"_links":{"self":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/40295"}],"collection":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/comments?post=40295"}],"version-history":[{"count":0,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/40295\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/media\/29677"}],"wp:attachment":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/media?parent=40295"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/categories?post=40295"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/tags?post=40295"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}