{"id":40322,"date":"2011-09-20T17:52:43","date_gmt":"2011-09-20T09:52:43","guid":{"rendered":"https:\/\/wp-productionenv-bjg9h2g2bgg5b8aa.southeastasia-01.azurewebsites.net\/news\/prcb-managers-recommend-atlantis-and-endeavour-become-sls-donors\/"},"modified":"2011-09-20T17:52:43","modified_gmt":"2011-09-20T09:52:43","slug":"prcb-managers-recommend-atlantis-and-endeavour-become-sls-donors","status":"publish","type":"post","link":"https:\/\/starpath.global\/news\/prcb-managers-recommend-atlantis-and-endeavour-become-sls-donors\/","title":{"rendered":"PRCB managers recommend Atlantis and Endeavour become SLS donors"},"content":{"rendered":"<p>NASA managers have further refined their plans to transfer Orbiter and Ground Support Equipment (GSE) Main Propulsion System (MPS) hardware to the Space Launch System (SLS). Known as hardware retention, the plan now calls for Discovery to remain untouched, while Atlantis and Endeavour would donate their \u201cinners\u201d to play a key role in the development of the SLS.<\/p>\n<p>SLS Development:<\/p>\n<p>With all related centers and contractors noting a significant ramp up in planning for SLS \u2013 now that it has finally been announced by NASA\u2019s top brass \u2013 the development phase will be key to ensuring the mistakes of the Constellation Program (CxP) are not repeated.<\/p>\n<p>CxP claim their problems were related to a lack of promised funding, although continual changes to the baseline design and integration between the Ares I first stage and the Orion capsule \u2013 from very early in the process \u2013 caused major impacts to the schedule milestones.<\/p>\n<h4 class=\"widget-title penci-border-arrow\">See Also<\/h4>\n<ul>\n<li>HLV Forum Section<\/li>\n<li>Space Policy Section<\/li>\n<li>L2 SLS Section (NEW)<\/li>\n<li>Click here to Join L2<\/li>\n<\/ul>\n<p>NASA managers know such a repeat would likely result in SLS being the last vehicle they\u2019d ever gain political support to build.<\/p>\n<p>Thankfully \u2013 from a design standpoint \u2013 the SLS is utilizing a lot of commonality with the esteemed Shuttle engineering arm, utilizing a workforce which is fully focused on vehicle engineering, as opposed to the CxP days, when Shuttle was still the priority and hosted the majority of the hardware skillset, leaving CxP noticeably short in that department.<\/p>\n<p><img fetchpriority=\"high\" decoding=\"async\" class=\"alignleft size-full wp-image-21194\" title=\"A4\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2011\/09\/A412.jpg\" alt=\"\" width=\"349\" height=\"244\">While the SLS\u2019 heritage from both CxP and Shuttle are obvious \u2013 via the likes of the \u201cExternal Tank\u201d core, J-2X driven Upper Stage, and initially the Solid Rocket Boosters (SRBs) \u2013 the aft of the SLS relies on the power which was very specific to the Shuttle orbiters.<\/p>\n<p>Initially three RS-25Ds will \u2013 along with the boosters \u2013 provide the thrust to launch the giant vehicle uphill, prior to five engines \u2013 by that time moving to the expendable RS-25Es \u2013 providing part of the evolvability of the SLS.<\/p>\n<p>Space tourism guides<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>Space Shuttle<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>SpaceX launch tickets<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>\n<p>     (adsbygoogle = window.adsbygoogle || []).push({});<\/p>\n<p>Given the commonality with the SSME\u2019s partner in crime, the orbiter MPS, engineers felt it would be a waste of valuable, flight proven, hardware to send it out on display (as much as it won\u2019t be visible) with the rest of the orbiters \u2013 when they head to their retirement homes.<\/p>\n<p>This led to a study into removing the orbiter\u2019s array of plumbing, allowing for it to be donated to the SLS development program.<\/p>\n<p>PRCB STS-MPS-SLS:<\/p>\n<p>Following a Program Requirements Control Board (PRCB) meeting this month, those plans have been refined, to the point of an overall approach and associated costs, along with the impacts such work would add to what is known as the Transition and Retirement (T&amp;R) phase for the orbiters.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-21193\" title=\"A3\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2011\/09\/A313.jpg\" alt=\"\" width=\"348\" height=\"263\">\u201cThe purpose of this (review) is to identify both specific and general guidelines to be followed in the preparation (work paper generation) and execution of the removal of Main Propulsion System hardware from the Space Shuttles in support of SLS,\u201d noted one of three PRCB presentations on the effort (all available in L2).<\/p>\n<p>\u201cPotential Cost and Schedule mitigation option for SLS. MPS component development can pace the overall core stage schedule. Retaining and utilizing SSP MPS hardware can have large initial cost savings.<\/p>\n<p>\u201cBeyond the existing Transition &amp; Retirement (T&amp;R) plan: Acquire high value items from the Orbiters, LRU (Line Replacement Unit) spares, GSE, Tooling and Documentation. SLS is needing hardware to support a test program and first two flights. Core Stage Option Utilizing Shuttle MPS. RS25 Engines. MPS. TVC (Thrust Vector Control) and Avionics.\u201d<\/p>\n<p>The initial plans involved all three orbiters. However, following an opening evaluation into the best path forward, Discovery won\u2019t be donating any hardware \u2013 other than the three SSMEs which flew on her final mission (STS-133).<\/p>\n<p>It is not documented as to why this decision was made \u2013 although it would match the shuttle extension studies, which concluded Discovery would be retired, allowing Atlantis and Endeavour to continue with additional flights.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-21195\" title=\"A1111\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2011\/09\/A1111.jpg\" alt=\"\" width=\"347\" height=\"238\">This was partly based on Discovery being due for her Orbiter Modification Down Period (OMDP), which would have likely involved work on \u2018areas of interest\u2019, such as the MPS feedline ball struts and VJ annulus on the LH2 side and all the MPS components. Previous engineering notes did reveal small cracks in the ball strut.<\/p>\n<p>Further checks \u2013 along with a high level of protection \u2013 will be provided on all MPS hardware to be removed, now specific to Atlantis and Endeavour, as the PRCB documentation outlined.<\/p>\n<p>\u201cAll SLS-hardware is to be maintained \u2018flight like\u2019. The term \u2018flight like\u2019 is defined as follows: Parts will be maintained visibly clean, appropriately handled\/transported, and maintained in good working condition. Part cleanliness shall be maintained using best shop practices: Cleanliness will be maintained via work in an environmentally controlled atmosphere.\u201d<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-21204\" title=\"A108\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2011\/09\/A108.jpg\" alt=\"\" width=\"351\" height=\"243\">This relates to the Orbiter Processing Facility (OPF) maintaining purges as appropriate, using double clean bags\/tape\/caps\/plugs to secure open ports\/lines, and undertaking a best effort to maintain an acceptable level of cleanliness using field expedient techniques if work is to be performed in an uncontrolled environment, such as the Vehicle Assembly Building (VAB), where the orbiters are taking it in turns to visit.<\/p>\n<p>\u201cField cleaning of MPS parts\/tooling using approved cleaning materials\/fluids is acceptable. Parts obstructing removal of MPS components such as pneumatic tubes, clamps, brackets etc., are not required to be re-installed but shall be recorded in a list of removed parts within the Work Authorization Document,\u201d added the presentation.<\/p>\n<p>For SLS\/HLV Articles, click here: http:\/\/www.nasaspaceflight.com\/tag\/hlv\/<\/p>\n<p>\u201cAll removed parts will be identified by part number, part description, and serial number (when readily identifiable). Cosmetic discrepancies (not affecting fit\/form\/function) of the part do not require Squawk (issue) initiation, but shall be noted\/documented during the part final inspection results.\u201d<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-21196\" title=\"A10\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2011\/09\/A107.jpg\" alt=\"\" width=\"349\" height=\"269\">All of the removed MPS hardware would then be placed into storage at the Assembly &amp; Refurbishment Facility (ARF), which also includes the large GSE equipment used on the orbiter MPS, which is currently located in the NSLD (NASA Shuttle Logistics Depot) at the Kennedy Space Center (KSC).<\/p>\n<p>\u201cPreserve Shuttle Heritage MPS Hardware for SLS Opportunities: Put a Hold on Retired Shuttle MPS, TVC and Avionics Assets. Remove &amp; Store Critical Orbiter MPS, TVC and Avionics Components at the ARF. MPS components are the most critical \u2013 saving cost and schedule,\u201d added another presentation.<\/p>\n<p>\u201cDevelop cost and schedule impacts to remove &amp; store existing orbiter hardware. Develop cost to retain all MPS, TVC and Avionics related LRU spares and sub-assemblies at the KSC logistics warehouse. Develop cost impacts to retain all MPS GSE, tooling and component documentation from NSLD.\u201d<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-21197\" title=\"A12\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2011\/09\/A124.jpg\" alt=\"\" width=\"350\" height=\"258\">The ARF is under the control of the Marshall Space Flight Center (MSFC), while some hardware will also take up residency at KSC\u2019s Logistics Warehouse.<\/p>\n<p>\u201cRemove high value MPS, TVC and Avionics hardware from the aft compartment of orbiters prior to sending them to museums. Package, transport and store the hardware in the Assembly Refurbishment Facility. Floorspace is available to store hardware in an environmentally controlled area,\u201d the overview continued.<\/p>\n<p>\u201cNSLD Bld 3 MPS Test equipment, special tooling and servicing documentation. Building needs to be restored to original configuration and GSE needs to be removed ASAP. Maintain Spare MPS, TVC and Avionics components, subassemblies and parts at the KSC Logistics Warehouse.\u201d<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-21200\" title=\"A22\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2011\/09\/A22.jpg\" alt=\"\" width=\"349\" height=\"219\">While long lists of specific hardware and costings are noted, two different schedules are shown, one showing no delay to the final departure of the orbiters to their exhibitions, while another shows a seven month impact for Endeavour\u2019s trip to the West Coast, and a 12 month slip to Atlantis\u2019 trip up the road to the KSC Visitor Center.<\/p>\n<p>Regardless, no official&nbsp;dates have been confirmed, even with Discovery, who\u2019s role with the SLS is now no longer required, ahead of the Shuttle Carrier Aircraft (SCA) ferry to the Smithsonian.<\/p>\n<p>\u201cThe Museum is working closely with NASA to determine the schedule for delivery of Discovery and removal of Enterprise from the Museum\u2019s Steven F. Udvar-Hazy Center. No date has been set,\u201d noted Isabel T. Lara, Media Relations at the Smithsonian National Air and Space Museum, adding their timeline closely involves Enterprise, as she would have to be moved to make way for Discovery.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-21199\" title=\"A671\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2011\/09\/A671.jpg\" alt=\"\" width=\"343\" height=\"255\">\u201cThe tentative plan calls both spacecraft to be moved over the course of a few days. Enterprise is expected to be on display until Discovery arrives to replace it.\u201d<\/p>\n<p>Enterprise will eventually be taking up residency in New York City.<\/p>\n<p>If the new plan can avoid impacts to the T&amp;R timeline \u2013 as may now be the case with only two orbiters involved \u2013 all associated facilities will also be released on a nominal timeline. However, if the additional T&amp;R impact becomes the reality, the slip is significant, per the documentation.<\/p>\n<p>\u201cOPF-1 remains occupied for an additional 17 months. OPF-2 remains occupied for an additional 7 months. Logistics remains occupied for an additional 17 months. Release of MDD (Mate Demate Device) delayed ~7 months. Overall completion of T&amp;R delayed 8.5 Months.\u201d<\/p>\n<p>In conclusion to the documentation, the PRCB noted they are in a position to green light the MPS donation, with the final approval likely to be forthcoming in the coming weeks \u2013 following the conclusion of the ongoing hardware inspections and planning.<\/p>\n<p>Click here for Shuttle T&amp;R Articles: http:\/\/www.nasaspaceflight.com\/tag\/T&amp;R\/<\/p>\n<p>\u201cRecommendation: Approve CR (Change Request) to remove MPS, TVC and Avionics hardware from orbiters and store at the ARF. Concur with Plan to remove transport MPS component GSE tooling and Documentation from NSLD and store at the ARF. Concur with plan to maintain orbiter MPS, TVC and Avionic spares at the KSC logistics Warehouse.\u201d<\/p>\n<p>(Images: Via L2 content, driven by L2\u2032s new SLS specific L2 section, which includes, presentations, videos, graphics and internal updates&nbsp;on the SLS and HLV. Other images via NASA and Larry Sullivan, Chris Gebhardt (MaxQ Entertainment\/NASASpaceflight.com) orbiter engineering tour video (1000mb) available on L2.)<\/p>\n<p>(L2 is \u2013 as it has been for the past several years \u2013 providing full exclusive SLS&nbsp;coverage, available no where else on the internet. To join L2, click here: http:\/\/www.nasaspaceflight.com\/l2\/)<\/p>\n","protected":false},"excerpt":{"rendered":"<p>NASA managers have further refined their plans to transfer Orbiter and Ground Support Equipment (GSE) Main Propulsion System (MPS) hardware to the Space Launch System (SLS). Known as hardware retention, the plan now calls for Discovery to remain untouched, while Atlantis and Endeavour would donate their \u201cinners\u201d to play a key role in the development [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":29590,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":"","_links_to":"","_links_to_target":""},"categories":[2],"tags":[9034,8959,7779,624],"class_list":["post-40322","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","tag-hlv","tag-mps","tag-shuttle","tag-sls"],"acf":[],"_links":{"self":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/40322"}],"collection":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/comments?post=40322"}],"version-history":[{"count":0,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/40322\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/media\/29590"}],"wp:attachment":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/media?parent=40322"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/categories?post=40322"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/tags?post=40322"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}