{"id":40406,"date":"2011-07-04T19:07:06","date_gmt":"2011-07-04T11:07:06","guid":{"rendered":"https:\/\/wp-productionenv-bjg9h2g2bgg5b8aa.southeastasia-01.azurewebsites.net\/news\/reaching-the-end-atlantis-and-the-fight-against-retirement\/"},"modified":"2011-07-04T19:07:06","modified_gmt":"2011-07-04T11:07:06","slug":"reaching-the-end-atlantis-and-the-fight-against-retirement","status":"publish","type":"post","link":"https:\/\/starpath.global\/news\/reaching-the-end-atlantis-and-the-fight-against-retirement\/","title":{"rendered":"Reaching the End: Atlantis and the Fight Against Retirement"},"content":{"rendered":"<p>For Atlantis, the last decade of her career would be marked with many more triumphs as she joined her sisters in the most ambitious project in space to date: construction of the International Space Station. This would mean dodging the order for retirement a whooping two times to become the only Space Shuttle orbiter with three penultimate flights and two \u201cfinal\u201d flights.<\/p>\n<p>Part 3: Atlantis\u2019 Final Flights: Pushing Forward Despite the Odds:<\/p>\n<p>CLICK HERE FOR PART 1:<br \/>\nhttp:\/\/www.nasaspaceflight.com\/2011\/07\/ov-104atlantis-international-vehicle-changing-world\/<\/p>\n<p>CLICK HERE FOR PART 2:<br \/>\nhttp:\/\/www.nasaspaceflight.com\/2011\/07\/shuttle-atlantis-mir-realization-program-goal\/<\/p>\n<p>After completing her seven straight trips to the MIR space station, Space Shuttle orbiter Atlantis (OV-104) entered what would be the final chapter of her career. Firstly, Atlantis was taken out of service for her second Orbiter Modification Down Period (OMDP).<\/p>\n<p>During this OMDP at her construction facility in Palmdale, CA, Atlantis received all the necessary upgrades to enable her to fly construction missions to the International Space Station (ISS).<\/p>\n<p><img fetchpriority=\"high\" decoding=\"async\" class=\"alignleft size-full wp-image-19974\" title=\"A8\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2011\/07\/A82.jpg\" alt=\"\" width=\"349\" height=\"253\">She also became the first orbiter in NASA\u2019s fleet of four orbiters to receive the new glass cockpit \u2013 a cockpit that features electronic instrument displays instead of mechanical gauges.<\/p>\n<p>After the OMDP, Atlantis was returned to the Kennedy Space Center in September 1998 and moved into OPF-2 for processing for her STS-101\/2A.2 resupply mission to the ISS.<\/p>\n<p>Spaceflight news subscription<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>Spaceflight<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>Rocket launch schedules<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>\n<p>     (adsbygoogle = window.adsbygoogle || []).push({});<\/p>\n<p>Originally targeting launch in August 1999, subsequent delays to the ISS assembly schedule caused by the need to inspect wiring across the Shuttle fleet after a launch event on Columbia in July 1999 delayed the launch of the STS-101 mission until April 2000.<\/p>\n<p>In August 1999, Atlantis was temporarily stored in the VAB to make room in an OPF for her sister Endeavour.<\/p>\n<p>Atlantis\u2019s STS-101 mission then slipped to March 16, April 17, and April 24. The last slip to April 24 was done to let the mission\u2019s Commander have more time to train for the mission following an ankle injury.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-19976\" title=\"A4\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2011\/07\/A42.jpg\" alt=\"\" width=\"350\" height=\"253\">In March, Atlantis was moved to the VAB and mated with her ET\/SRB flight stack and then moved out to Pad-A on March 25.<\/p>\n<p>On April 24, all proceeded well, but at 16:17 EDT, the launch team officially scrubbed the launch due to out-of-limit crosswinds at the Shuttle Landing Facility (SLF).<\/p>\n<p>The count was recycled for the following day. But on April 25, the launch was scrubbed at the T-38min and counting mark due to high winds at the SLF and launch pad.<\/p>\n<p>On April 26, the 3rd consecutive launch attempt, launch was scrubbed at T-9mins and holding due to unacceptable weather at all of the mission\u2019s three Transoceanic Abort Landing (TAL) sites.<\/p>\n<p>The launch was reset for May 18, but postponed on May 17 due to the 24-hr launch delay of an Atlas III rocket.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-19977\" title=\"A3\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2011\/07\/A310.jpg\" alt=\"\" width=\"346\" height=\"257\">On May 19, 2000, Atlantis successfully launched at 06:11 EDT. It was her 24th mission, the 69th space launch from Pad-A, the 98th Space Shuttle mission, and the 24th night launch of the program.<\/p>\n<p>It was also the 1st launch of a Space Shuttle orbiter with the new glass cockpit.<\/p>\n<p>Following docking at 00:30 EDT 20 May 2000, Atlantis began assembly of the Strela crane on ISS, the installation of additional handrails on the outside of the ISS (Unity and Zarya modules) via one EVA by two of her crewmembers, and the set-up of the center-line camera cable \u2013 a future vital part of ISS\/Shuttle docking operations.<\/p>\n<p>The mission also delivered numerous supplies to the ISS via the SPACEHAB double module and the SPACEHAB Integrated Cargo Carrier pallet located in Atlantis\u2019s Payload Bay. Some of these supplies included film and video equipment, office supplies, personal items for the upcoming crew of the Station, crew health maintenance items, and medical support supplies.<\/p>\n<p>Atlantis also boosted the Station\u2019s orbit from 230 miles to 250 miles. After 9 days 21 hours 10 minutes and 10 seconds, Atlantis landed safely at the Kennedy Space Center, FL at 02:20 EDT on May 29 on Runway 15.<\/p>\n<p>However, post-flight inspections of Atlantis revealed a very serious issue with the vehicle\u2019s Thermal Protection System.<\/p>\n<h4 class=\"widget-title penci-border-arrow\">See Also<\/h4>\n<ul>\n<li>STS-135 Updates<\/li>\n<li>L2&nbsp;STS-135&nbsp;&nbsp;Section<\/li>\n<li>L2 Historical Section<\/li>\n<li>Click here to Join L2<\/li>\n<\/ul>\n<p>Upon post-flight inspection of Atlantis after STS-101, it was discovered that a damaged tile seam had allowed superheated plasma from reentry to enter the vehicle\u2019s left wing. The gas did not penetrate deeply into the wing structure and all the damage was repaired before Atlantis\u2019s next flight.<\/p>\n<p>Nonetheless, the damaged tile seam and hot gas penetration into the orbiter \u2013 had it penetrated more deeply than it did \u2013 could have led to wide-spread internal damage and the potential for the loss of the vehicle and her flight crew during reentry.<\/p>\n<p>It would be a hot gas penetration into her sister Columbia\u2019s left wing on February 1, 2003 that would lead to the loss of Columbia and her flight crew.<\/p>\n<p>On August 7, 2000, Atlantis was moved to the VAB and then out to Pad-B on August 13 for final processing for the STS-106\/2A.2b mission. At the Flight Readiness Review, launch was set for September 8.<\/p>\n<p>On September 6, the lighting mast on Pad-B was hit by lightning, but an engineering review quickly cleared the vehicle for flight.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-19978\" title=\"A5\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2011\/07\/A52.jpg\" alt=\"\" width=\"351\" height=\"254\">Atlantis lifted off on her 22nd mission and the 99th for the Shuttle Program at 08:45.47 EDT on September 8, 2000.<\/p>\n<p>The mission marked the ONLY time in Program history that Atlantis flew on back-to-back missions for the Shuttle program. With this flight, all four of the original orbiters in NASA\u2019s Shuttle fleet completed back-to-back flights for the Program.<\/p>\n<p>Only Endeavour never flew back-to-back mission for the Shuttle Program.<\/p>\n<p>During STS-106, Atlantis delivered tons of supplies to the still un-crewed ISS and paved the way for the arrival of Expedition 1 to the ISS in the fall of 2000.<\/p>\n<p>Supplies for the ISS were brought up by Atlantis via the SPACEHAB double module and the SPACEHAB Integrated Cargo Carrier. Supplies were also unloaded from the Russian Progress M-1 spacecraft at the end of the Zvezda Service Module.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-19979\" title=\"A9\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2011\/07\/A92.jpg\" alt=\"\" width=\"348\" height=\"257\">During the mission, the 50th spacewalk in Space Shuttle Program history was conducted by Russian cosmonaut Yuri Malenchenko and U.S. astronaut Dr. Ed Lu in support of ISS construction operations.<\/p>\n<p>The goal of the STS-106 mission was to make final preparations for the arrival of the first crew on the International Space Station and the start of permanent human settlement on the outpost later that year.<\/p>\n<p>Atlantis undocked from the Station successfully and returned to Earth on September 19 with a 03:56 EDT landing at the Kennedy Space Center. It was the 23rd consecutive Shuttle landing at the Kennedy Space Center, the 30th Kennedy landing in the last 31 flights, and the 52nd overall landing at Kennedy.<\/p>\n<p>It was also the 15th night landing in Program history.<\/p>\n<p>Atlantis was moved into an OPF later that day and spent 2.5 months processing for her next mission: STS-98.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-19980\" title=\"A11\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2011\/07\/A114.jpg\" alt=\"\" width=\"349\" height=\"259\">On December 4, she was moved to the VAB, mated with her ET\/SRB stack, and then transported out to Pad-A on January 2, 2001.<\/p>\n<p>During rollout operations, the primary computer processor on the crawler malfunctioned and NASA decided to roll Atlantis back to the VAB after only an hour of rollout operations.<\/p>\n<p>The second crawler was brought in immediately and Atlantis was successfully rolled out to the pad the same day and launch remained set for January 19.<\/p>\n<p>However, questions over cables running throughout the Solid Rocket Boosters across the Shuttle fleet led to the inspection of the cables on Atlantis\u2019s SRBs while at the launch pad.<\/p>\n<p>The inspections were positive, but continued concerns prompted Program managers to air on the side of safety and ordered the rollback of Atlantis to the VAB for more thorough testing.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-19981\" title=\"A12\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2011\/07\/A122.jpg\" alt=\"\" width=\"347\" height=\"254\">The rollback decision was made on January 15 \u2013 just hours before the launch countdown was scheduled to begin. Atlantis payload was rolled back January 20. It was the 14th rollback in program history. Cable tests in the VAB provided excellent data and the cables were cleared for flight.<\/p>\n<p>On Jan. 25, Atlantis\u2019s launch was reset for February 7, and Atlantis was returned to Pad-A on Jan. 26.<\/p>\n<p>On launch day, the launch team briefly discussed an irregular voltage on one of Atlantis\u2019s Multiplexer-Demultiplexer units. It was determined to be a sensor issue and nothing more.<\/p>\n<p>At 18:13.02 EST on February 7, 2001 \u2013 2 mins after the planned liftoff time \u2013 Atlantis lifted off from Pad-A to begin her 23rd mission and the 102nd flight of the Space Shuttle Program.<\/p>\n<p>Liftoff of STS-98 marked the first Space Shuttle flight and the first world-wide manned spaceflight of the 21st century \u2013 with Atlantis holding the honor.<\/p>\n<p>This means, that coupled with the STS-97\/Endeavour mission of Nov.\/Dec. 2000, that the Space Shuttle fleet conducted both the last manned spaceflight of the 20th century and the first manned spaceflight of the 21st century.&nbsp;<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-19982\" title=\"A13\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2011\/07\/A132.jpg\" alt=\"\" width=\"347\" height=\"267\">STS-98 successfully docked with the International Space Station\u2019s PMA-3 docking port \u2013 marking the second and last time that a Space Shuttle docked to this PMA on the Station.<\/p>\n<p>Following docking, the Atlantis crew delivered and attached the premiere US science laboratory to the Station: the Destiny module.<\/p>\n<p>This marked the first of three times that Atlantis would deliver a permanent pressurized module to the International Space Station \u2013 tying her with sister Discovery for the most permanent pressurized elements delivered to the International Space Station.<\/p>\n<p>The mission also brought forth the 100th spacewalk in U.S. spaceflight history.<\/p>\n<p>After two days of weather wave offs at Kennedy, Atlantis landed safely at Edwards Air Force Base on February 20 at 15:33 EST for a total mission duration of 12 days 21 hours 21 minutes and 00 seconds.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-19983\" title=\"A14\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2011\/07\/A142.jpg\" alt=\"\" width=\"344\" height=\"326\">After being returned to the Kennedy Space Center, Atlantis was prepared for her next starring role on the STS-104\/7A assembly mission.<\/p>\n<p>Engineers moved Atlantis to the VAB on May 29 and mated her with her ET\/SRB flight stack. Shortly after her arrival in the VAB, the International Space Station experienced a problem with its new robotic arm.<\/p>\n<p>Launch of Atlantis was then delayed until No Earlier Than early-July to allow engineers on the ground time to fix the station\u2019s arm.<\/p>\n<p>Mating of Atlantis to her ET proceeded without delay, though, and the entire stack remained in the VAB until a new launch date was selected.<\/p>\n<p>On June 19, a July 12 launch date was selected for Atlantis and the vehicle began its rollout to Pad-B the following day. However, lightning soon moved into the area and the rollout was cancelled and Atlantis returned to the VAB.<\/p>\n<p>Atlantis was completely rolled out to Pad-B on July 21. During the pad flow, technicians replaced and retested one of Atlantis\u2019s Mass Memory Units.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-19984\" title=\"A15\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2011\/07\/A152.jpg\" alt=\"\" width=\"346\" height=\"280\">After a near-flawless pad flow, Atlantis lifted off right on time on her first attempt at 05:04 EDT on July 12, 2001.<\/p>\n<p>Liftoff marked the 24th flight of Atlantis and the 105th flight of the Shuttle program. It also marked the second and last time that a Space Shuttle orbiter flew a numerically designated mission that matched its airframe number: OV-104\/Atlantis on STS-104.&nbsp; Discovery, OV-103\/STS-103, was the other occurrence.<\/p>\n<p>The launch also debuted the use of the new Block II Space Shuttle Main Engine (SSME) in one engine location on this flight. During nominal Main Engine Cutoff, an anomaly was detected in the shutdown sequence of the new engine. A mitigation plan was worked an implemented on the STS-108\/Endeavour flight in December.<\/p>\n<p>During STS-104, Atlantis delivered the Quest Airlock to the ISS. Delivery, installation, and activation of the Quest Airlock marked the transfer to the ISS from the Space Shuttle of primary ISS EVA egress and ingress access.<\/p>\n<p>The mission also marked the first use of Quest for an ISS assembly EVA (spacewalk #3 of the mission).<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-19985\" title=\"A16\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2011\/07\/A161.jpg\" alt=\"\" width=\"347\" height=\"279\">Atlantis landed safely on July 24 at 23:38 EDT at the Kennedy Space Center \u2013 one day later than planned because of adverse weather at Kennedy the day before.<\/p>\n<p>Atlantis was moved into an OPF the following day and then out to the VAB on March 6, 2002 for ET\/SRB stack mating.<\/p>\n<p>STS-110\/Atlantis was moved out to Pad-B on March 12.<\/p>\n<p>Launch on April 4 was scrubbed after the start of ET tanking due to a hydrogen leak on the outside of the Mobile Launch Platform (MLP).<\/p>\n<p>The leak was repaired and launch rescheduled for April 8.<\/p>\n<p>On April 8, all stations were for \u201cgo\u201d for launch and the countdown picked up at the T-9min mark. At T-5min, the countdown was held due to a problem with Launch Processing System communication with the Front End Processor.<\/p>\n<p>The launch team quickly and safely worked the issue, and with only 11 seconds of hold time remaining, the issue was cleared.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-19987\" title=\"A18\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2011\/07\/A182.jpg\" alt=\"\" width=\"349\" height=\"254\">Atlantis lifted off on her 25th mission at 16:44.19 EDT with only 11 seconds remaining in the launch window. Until STS-133\/Discovery in February 2011, this would stand as the closest the Shuttle had ever come to the end of a ISS launch window while still launching successfully.<\/p>\n<p>STS-133\/Discovery would shatter Atlantis\u2019s record by launching with only 2secs of window and 1sec of LOX Drainback Hold Time remaining in its window.<\/p>\n<p>STS-110 marked the 50th space launch from Pad-B and the first Shuttle flight to use Block II SSMEs in all three engine locations.<\/p>\n<p>The flight also marked the 7th and final spaceflight for astronaut Jerry Ross \u2013 who flew 5 of his 7 missions on the Atlantis, a record for any astronaut on a single vehicle. It was the first time that one person flew to space 7 times \u2013 a record that would be tied on the very next Space Shuttle mission.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-19986\" title=\"A17\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2011\/07\/A172.jpg\" alt=\"\" width=\"348\" height=\"250\">STS-110\/Atlantis also marked the first flight of Rex Walheim \u2013 who will be Atlantis\u2019s and the Space Shuttle Program\u2019s final Flight Engineer on the upcoming launch of STS-135\/Atlantis.<\/p>\n<p>During STS-110, Atlantis was called upon to deliver the S0 truss to the ISS \u2013 the truss segment that forms the backbone of the Integrated Truss Structure on the ISS.<\/p>\n<p>The mission also delivered the Mobile Transporter to the ISS, paving the way for the delivery of the Mobile Base System on the next Shuttle mission.<\/p>\n<p>After 10 days and 19hours in space, Atlantis landed safely at the Kennedy Space Center at 12:27 EDT on Runway 33 on April 19.<\/p>\n<p>She was then moved into an OPF where she spent four months processing for STS-112. She was moved to the VAB on September 4 and out to Pad-B on September 10, 2002.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-19988\" title=\"A19\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2011\/07\/A192.jpg\" alt=\"\" width=\"346\" height=\"258\">On Oct. 7, 2002, Atlantis lifted off on STS-112 at 15:46 EDT on her 26th mission and 111th mission for the Program. On board Atlantis was astronaut Sandy Magnus, making her first trip to space. Magnus will be a member of Atlantis\u2019s final crew when the vehicle launches on STS-135 later this week.<\/p>\n<p>The flight also marked the first time that a camera was placed on the LOX Feedline of the External Tank (ET) looking down over the ET\u2019s Ice Frost Ramps and PAL (Protuberance Air Load) ramp \u2013 a safety feature that would become mandatory three flights later.<\/p>\n<p>During STS-112, Atlantis delivered the next segment of the Integrated Truss Structure: the S1 starboard truss which weighed 28,000 lbs. Atlantis also delivered the Crew Equipment Translation Aid to the Station and carried numerous science experiments to orbit.<\/p>\n<p>After 4.5 million miles, Atlantis returned safely to Earth on Oct 18. with an 11:44.35 EDT landing on Runway 33 at the Kennedy Space Center.<\/p>\n<p>She was towed into an OPF and prepared for her next role on the STS-114 mission in March 2003.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-19989\" title=\"A20\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2011\/07\/A202.jpg\" alt=\"\" width=\"349\" height=\"247\">Post-flight analysis of this mission, however, revealed that a piece of ET bipod foam had broken free from Atlantis\u2019s STS-112 external tank and impacted an SRB with such force that it bent the case metal of the booster.<\/p>\n<p>The standard FRR (Flight Readiness Review ) for STS-113\/Endeavour \u2013 the immediate following flight to STS-112\/Atlantis \u2013 indicated that NASA was aware of the foam liberation event.<\/p>\n<p>The ET FRR presentation for STS-113 noted that \u201cThe Orbiter has not experienced \u2018Safety of Flight\u2019 damage from loss of foam in 112 flights (including 3 known ET bipod ramp foam loss).\u201d<\/p>\n<p>STS-113\/Endeavour and STS-107\/Columbia were both cleared for launch on this rationale.<\/p>\n<p>On January 16, 2003, a large chuck of ET bipod foam broke free from Columbia\u2019s ET and impacted the orbiter on her left hand Wing Leading Edge RCC Thermal Protection System panels.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-19990\" title=\"A321\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2011\/07\/A321.jpg\" alt=\"\" width=\"329\" height=\"347\">On February 1, 2003, just one month before the scheduled launch of STS-114\/Atlantis, sister Columbia broke-up during atmospheric reentry over Texas.<\/p>\n<p>The resulting accident grounded the Space Shuttle fleet as a full investigation was made.<\/p>\n<p>The Columbia Accident Investigation Board (CAIB) revealed the cause of the Columbia accident to be the piece of ET bipod foam that broke off the tank and impacted Columbia\u2019s left wing, breaching the delicate Thermal Protection System RCC panels on Columbia\u2019s wing leading edge thus allowing superheated plasma to enter and melt the vehicle\u2019s aluminum airframe during reentry.<\/p>\n<p>The CAIB specifically pointed to the STS-112\/Atlantis foam loss event as a major indicator of compromised ET\/Shuttle orbiter flight safety.<\/p>\n<p>Following the CAIB\u2019s recommendations, Atlantis, along with her two surviving sisters, was upgraded with the suggested CAIB recommendations before being chosen as the Return to Flight orbiter for mission STS-114.<\/p>\n<p>However, a problem with Atlantis\u2019s landing gear forced NASA to remove Atlantis from the STS-114 flight and assign her to the Launch On Need rescue flight for STS-114 and the primary vehicle for the second Return to Flight mission: STS-121.<\/p>\n<p>Thus, Atlantis was the first Space Shuttle orbiter to service in the role of emergency rescue vehicle \u2013 an ironic twist given that her last mission (STS-135) will not have a rescue Shuttle standing by but will instead rely on the Russian Soyuz for emergency support.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-19991\" title=\"A21\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2011\/07\/A212.jpg\" alt=\"\" width=\"346\" height=\"240\">Nonetheless, after a large piece of foam liberated from the External Tank during STS-114\u2019s launch, the Shuttle fleet was again grounded, and because of the lengthy delay Atlantis was removed from assignment from the STS-121 mission.<\/p>\n<p>Again, Atlantis was given Launch On Need rescue duty for STS-121 while retaining her assignment to STS-115.<\/p>\n<p>Following the successful flight of STS-121\/Discovery in July 2006, Atlantis was stacked with her ET\/SRBs and moved to the launch pad in August 2006 for the STS-115 mission.<\/p>\n<p>After numerous weather and technical delays, Atlantis launched for the first time in four years on September 9, 2006 on a mission that delivered the P3\/P4 truss and a new set of solar arrays to the ISS.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-19992\" title=\"A22\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2011\/07\/A222.jpg\" alt=\"\" width=\"347\" height=\"225\">Launching on Atlantis\/STS-115 on his very first spaceflight was Pilot Chris Ferguson \u2013 who will be Atlantis\u2019s final Commander when she launches on STS-135 later this week.<\/p>\n<p>During STS-115, Atlantis\u2019s flight crew demonstrated the new safety equipment made mandatory after the Columbia accident when they scanned the underbelly of Atlantis with the Orbiter Boom Sensor System to ensure that all TPS (Thermal Protection System) tiles were intact after unidentifiable co-orbital debris was spotted near Atlantis after undocking from the ISS.<\/p>\n<p>Atlantis landed safely at the Kennedy Space Center on September 21, 2006 at 06:21.30 EDT.<\/p>\n<p>STS-115 marked Atlantis\u2019s final launch from Pad-B at the Kennedy Space Center.<\/p>\n<p>Five months later, Atlantis was back at LC-39A for the STS-117 mission.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-19993\" title=\"A23\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2011\/07\/A232.jpg\" alt=\"\" width=\"347\" height=\"270\">During the Space Shuttle Program FRR in late-February an intense hail storm at the pad imparted over 2,000 divots into Atlantis\u2019s ET that had to be repaired.<\/p>\n<p>Atlantis was rolled back from the pad to the VAB where ET repairs were conducted from March to May.<\/p>\n<p>Atlantis was returned to the launch pad in May and launched on the first attempt on June 8, 2007 at 19:38.04 EDT.<\/p>\n<p>Liftoff of Atlantis and STS-117 marked the 250th manned orbital spaceflight in history<\/p>\n<p>During STS-117, Atlantis delivered a mirrored truss to P3\/P4 \u2013 the S3\/S4 truss and solar arrays \u2013 to the ISS and retracted a second set of solar arrays on the P6 truss in preparation for its transfer to a new location on the Station on STS-120 later that year.<\/p>\n<p>STS-117 lasted 13-days, 20-hours, 12-minutes, and 44-seconds. It is Atlantis\u2019s longest flight to date and spanned 219 orbits of Earth and 5.8 million miles.<\/p>\n<p>Atlantis followed her longest flight with the STS-122 mission.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-19994\" title=\"A24\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2011\/07\/A242.jpg\" alt=\"\" width=\"347\" height=\"251\">Originally scheduled to launch on December 4, 2006, the mission was delayed two months so NASA could nail down and fix the vexing ECO (Engine Cutoff) sensor anomalies that had plagued the fleet since STS-114 in 2005.<\/p>\n<p>After fixing the ECO sensor issue, Atlantis was launched on the ST-122 flight exactly seven years to the day after STS-98.<\/p>\n<p>During STS-122, Atlantis delivered the first Laboratory to ISS since Destiny (STS-98).&nbsp; STS-122 on Atlantis marked the beginning of construction of the international partner laboratories with the delivery of the European Space Agency\u2019s Columbus research module to the ISS.<\/p>\n<p>STS-122 also marked the celebration of NASA\u2019s 50th anniversary and the 50th anniversary of the first US unmanned orbital flight.<\/p>\n<p>Atlantis undocking from the International Space Station for what many believed to be her final time on February 18, 2008.<\/p>\n<p>Following her return to earth on February 20, 2008 with a mid-morning landing at the Kennedy Space Center, Atlantis was prepared for what was at the time her final mission: STS-125 to the Hubble Space Telescope.<\/p>\n<p>Click here for STS-125 Articles: http:\/\/www.nasaspaceflight.com\/tag\/sts-125\/<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-19996\" title=\"A26\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2011\/07\/A262.jpg\" alt=\"\" width=\"346\" height=\"262\">Originally, targeting launch in October 2008, STS-125 was delayed to May 2009 due to the failure of a critical component on the Telescope and the desire to fly a replacement component up on Atlantis \u2013 the last upgrade mission to Hubble.<\/p>\n<p>Launch of Atlantis and the STS-125 mission represented a tremendous undertaking on the part of NASA and remains a shining example of the work and dedication to safety that NASA upholds on a daily basis.<\/p>\n<p>During the seven month delay to STS-125, Atlantis\u2019s retirement was put on hold and the vehicle officially handed two additional missions thanks to a review of the Shuttle Program\u2019s OMDP time\/life cycle requirements.<\/p>\n<p>With a renewed spirit and the knowledge that she would continue service to NASA through the projected end of the Space Shuttle Program, Atlantis was readied once again for STS-125 Hubble mission.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-19995\" title=\"A25\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2011\/07\/A252.jpg\" alt=\"\" width=\"348\" height=\"237\">And with Endeavour standing by on Pad-B in case Atlantis\u2019s crew required rescue, Atlantis and the STS-125 mission lifted off right on time on the first launch attempt at 14:01:56 EDT May 11, 2009.<\/p>\n<p>After rendezvousing with the Hubble Telescope, Atlantis\u2019s astronauts performed five back-to-back spacewalks completing EVERY SINGLE complex and delicate mission objective and returning the Hubble Telescope to full operating capability.<\/p>\n<p>STS-125 successfully landed at Edwards Air Force Base, CA on 24 May 2009 at 11:39.05 EDT after 12 days 21 hours 37 minutes and 9 seconds in space.<\/p>\n<p>Upon return to the Kennedy Space Center, Atlantis continued a series of mini-OMPD inspections that were part of the agreement to retain her for service past the STS-125 mission.<\/p>\n<p>These mini-OMDPs (or periods of inspection of critical components on Atlantis to ensure safety on her two added flights) enabled NASA to hand Atlantis two flights following STS-125: STS-129 and STS-132.<\/p>\n<p>Click here for STS-129 Articles: http:\/\/www.nasaspaceflight.com\/tag\/sts-129\/<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-19997\" title=\"A27\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2011\/07\/A272.jpg\" alt=\"\" width=\"349\" height=\"237\">However, during post-flight turnaround from STS-125, a knob from a light fixture was found to be wedge in between Atlantis\u2019s pilot\u2019s console and the inner pressure pane window of the pilot\u2019s window.<\/p>\n<p>An extensive effort to remove the knob was undertaken and eventually proved successful. However, the pressure pane was found to be damaged.<\/p>\n<p>Further analysis showed that the damage was not significant and would not interfere or impinge on safety margins during flight.<\/p>\n<p>As such, a costly and extensive pressure pane replacement \u2013 which has never occurred at the Kennedy Space Center \u2013 was avoided (a replacement that could have removed Atlantis from service for 6-months or one year or all together).<\/p>\n<p>Following resolution of this issue, Atlantis was rolled out to Pad-A in Oct 2009 for the STS-129 mission. During her stay at Pad-A, the Ares I-X test rocket was successfully launched from Pad-B. At the time, Ares I was the scheduled successor to the Space Shuttle.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-20001\" title=\"A28\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2011\/07\/A282.jpg\" alt=\"\" width=\"350\" height=\"227\">On November 16, 2009, Atlantis lifted off on the STS-129 mission, a flight that served as the first major effort to pre-position thousands of pounds of external spare parts on the ISS before the retirement of the Space Shuttle fleet.<\/p>\n<p>During ground processing of Atlantis for STS-129, a record LOW number of 54 IPRs (problem reports) were recorded on Atlantis, shattering the old record of ~70 IPRs set by sister Discovery.<\/p>\n<p>Discovery later reclaimed the record with only 47 IPRs during her ground flow toward STS-131.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>For Atlantis, the last decade of her career would be marked with many more triumphs as she joined her sisters in the most ambitious project in space to date: construction of the International Space Station. This would mean dodging the order for retirement a whooping two times to become the only Space Shuttle orbiter with [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":29545,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":"","_links_to":"","_links_to_target":""},"categories":[2],"tags":[3660,9173],"class_list":["post-40406","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","tag-atlantis","tag-feature"],"acf":[],"_links":{"self":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/40406"}],"collection":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/comments?post=40406"}],"version-history":[{"count":0,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/40406\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/media\/29545"}],"wp:attachment":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/media?parent=40406"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/categories?post=40406"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/tags?post=40406"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}