{"id":40479,"date":"2011-04-17T17:25:19","date_gmt":"2011-04-17T09:25:19","guid":{"rendered":"https:\/\/wp-productionenv-bjg9h2g2bgg5b8aa.southeastasia-01.azurewebsites.net\/news\/sts-134-endeavour-ordnance-installation-on-tap-mission-still-being-tweaked\/"},"modified":"2011-04-17T17:25:19","modified_gmt":"2011-04-17T09:25:19","slug":"sts-134-endeavour-ordnance-installation-on-tap-mission-still-being-tweaked","status":"publish","type":"post","link":"https:\/\/starpath.global\/news\/sts-134-endeavour-ordnance-installation-on-tap-mission-still-being-tweaked\/","title":{"rendered":"STS-134: Endeavour ordnance installation on tap \u2013 Mission still being tweaked"},"content":{"rendered":"<p>Following a relatively relaxed week at Pad 39A, Endeavour is preparing to enter Ordnance installation tasks on Monday and Tuesday, as the youngest orbiter in the fleet heads into her final week prior to the launch countdown. With the Flight Readiness Review (FRR) also set to take place on Tuesday, managers are making their final refinements to the baselined STS-134 mission.<\/p>\n<p>STS-134 Latest:<\/p>\n<p>With the processing flow realigned for the April 29 launch date, over one week\u2019s worth of contingency time has been naturally eroded over recent days via a reduced workload, merging into the planned schedule in order to hit its marks in the run up to the start of S0007 (Launch Countdown) operations in just over a week\u2019s time.<\/p>\n<p>As a result, Endeavour and her engineers enjoyed the weekend off, ahead of what is expected to be a ramped up flow over the coming days.<\/p>\n<h4 class=\"widget-title penci-border-arrow\">See Also<\/h4>\n<ul>\n<li>STS-134 LIVE UPDATES<\/li>\n<li>L2 STS-134 Special Section<\/li>\n<li>Click here to Join L2<\/li>\n<\/ul>\n<p>\u201cThe EMU (Space Suits) were stowed in the airlock. The functionals on the units performed. Worked some of the vehicle closeouts,\u201d noted KSC Ground Operations (L2). \u201cMonday night\/Tuesday morning, the ordnance activities will be performed. Still on track for launch April 29, 2011.\u201d<\/p>\n<p>Those EMU tasks did result in two additional Interim Problem Reports (IPRs) being charged against Endeavour\u2019s flow, both of which were resolved without delay \u2013 allowing the hatch to be closed for the final time ahead of launch day.<\/p>\n<p><img fetchpriority=\"high\" decoding=\"async\" class=\"alignleft size-full wp-image-18805\" title=\"OLYMPUS DIGITAL CAMERA\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2011\/04\/A514.jpg\" alt=\"\" width=\"339\" height=\"283\">\u201cOV-105\/SRB BI-145\/RSRM 113\/ET-122 (Pad-A): V1103 EMU functional testing was successfully completed and the airlock has been closed out for launch,\u201d noted the NASA Test Director (NTD) report (L2). \u201cNew IPR 134V-0039: During V1103, following Airlock O2 samples, observed decay on the Extra Vehicular Oxygen Supply Pressure.<\/p>\n<p>\u201cThe decay rate was approx 170sccm (70sccm is allowable). Troubleshooting found the dynatube cap at TP1 on Panel C7 was only finger tight. The cap was removed, inspected and reinstalled with proper torque, and a leak check of the O2 system was successful.<\/p>\n<p>\u201cNew IPR 134V-0040 to Integration: Following EMU 1 Battery charge termination, EMU 2 Service and Cooling Umbilical (SCU 2) was de-mated instead of SCU 1. Per design, the EMU power supply automatically shuts down when an open circuit is detected, so there was no hardware damage. SCU 2 has been re-mated and battery charging successfully completed.\u201d<\/p>\n<p>Rocket launch schedules<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>NASA mission patches<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>Space Shuttle models<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>\n<p>     (adsbygoogle = window.adsbygoogle || []).push({});<\/p>\n<p>A Problem Report (PR) was also listed prior to airlock closeout, relating to a duct in the airlock which was missing some straps and wasn\u2019t installed per nominal procedure. However, by the time the issue was listed, the correct straps were procured and installed, and the duct was properly stowed.<\/p>\n<p>With the stack now officially into S0007 launch countdown preparations, the SRB (Solid Rocket Booster) ESP (External Stowage Platform) has been lowered at the pad. The ESP will be used as part of the final ordnance installation tasks, scheduled to begin on Monday night.<\/p>\n<p>Ordnance installation tasks will be rounding up by the time managers meet for the Agency Level FRR at the Kennedy Space Center (KSC), which will officially set the launch date.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-18806\" title=\"A3\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2011\/04\/A314.jpg\" alt=\"\" width=\"348\" height=\"244\">While a large amount of work has already been completed via the Space Shuttle Program (SSP) FRR at the Johnson Space Center (JSC), the Agency level review will also evaluate the work carried out by engineers to ensure the recent severe storms did not cause any damage of concern on the stack via the lightning, hail and wind events.<\/p>\n<p>\u201cMaking progress on open paper closures for ET-122 in anticipation of the Agency FRR,\u201d noted Lockheed Martin\/External Tank on the latest Shuttle Standup\/Integration report (L2). \u201cAlso incorporating the package and will have a submittal regarding the hail damage flight rationale.\u201d<\/p>\n<p>The required flight rationale, mainly relating to two specific areas of interest \u2013 the slight hail damage to the top of ET-122 and wind loads stresses on the associated hardware with the Ground Umbilical Carrier Plate (GUCP) \u2013 was the subject of four large presentations (available on L2), which were overviewed by the Program Requirements Control Board (PRCB) on Thursday.<\/p>\n<p>The highly extensive review, which included the departments which presented a positive overview to the Engineering Review Board (ERB) earlier last week, will be the subject of an upcoming article.<\/p>\n<p>Mission Tweaking:<\/p>\n<p>Also noted of late were the evaluations into the potential Endeavour will carry out a full 16 day nominal mission, which would allow for additional work to take place to aid Atlantis\u2019 shorter \u2013 and timeline constrained \u2013 STS-135 mission. Currently, STS-134 is being baselined as a 14 day mission, with any extension decision likely to be taken during the docked phase of the flight.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-18807\" title=\"OLYMPUS DIGITAL CAMERA\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2011\/04\/A66.jpg\" alt=\"\" width=\"342\" height=\"244\">Endeavour sports the additional docked mission capability due to their SSPTS (Station to Shuttle Power Transfer System) \u2013 allowing for a reduction on the demands of the orbiter\u2019s PRSD (Power Reactant Storage and Distributation) tank loads, which supply the Fuel Cells.<\/p>\n<p>\u201cReviewing STS-134 O2 loading; have cryo to protect +2 docked days. APM (Ascent Performance Margin) is sufficient to allow reduced offload and to add cryo for FD4 (docking) protection,\u201d noted Flight Operations &amp; Integration on the Standup report. \u201cThat is ~160 lbs more of O2 to put on. That still leaves an APM above 100 lbs for a 5 minute window.\u201d<\/p>\n<p>If a 16 day mission option was taken, this would also have the addition of the End Of Mission (EOM) plus one and two days scenario. Plus one is usually classed as \u201cpick-em day\u201d in this scenario, resulting in numerous landing opportunities at KSC, Dryden (Edwards Air Force Base) and even White Sands in New Mexico if required. EOM+2 would be reserved for a technical wave off, due to the unlikely event of troubleshooting requiring the additional day in space.<\/p>\n<p>As confirmed by Flight Operations &amp; Integration, the option to pack STS-134\u2019s mission is related to the opportunity to release some of the workload from STS-135, as Atlantis\u2019 docked mission timeline continues to be worked due to the previously reported challenges.<\/p>\n<p>STS-134 Specific Articles: http:\/\/www.nasaspaceflight.com\/tag\/sts-134\/<\/p>\n<p>\u201cIt (the STS-134 extension) is being assessed for STS-135. STS-135 is a very tight flight, and the team is trying to come up with creative ways to fit it in and still get the mission content done,\u201d added FO&amp;I.<\/p>\n<p>\u201cA CR (Change Request) was approved for Outside the Board Processing yesterday to go to an April 29, 2011 launch date for STS-134. A mission duration of 15+1 days was put on that. There is some discussion of going to 16+0, so there might be a change coming (currently sticking with 14 days for the interim).\u201d<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-18808\" title=\"A4\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2011\/04\/A412.jpg\" alt=\"\" width=\"342\" height=\"261\">Also requiring late evaluation is Endeavour\u2019s docking procedure, after the Orbiter Project at the Johnson Space Center updated their evaluations into the large oscillations noted during Discovery\u2019s docking with the International Space Station during STS-133.<\/p>\n<p>\u201cLarge oscillations between Shuttle and ISS on STS-133. Misalignment reached 10 degrees pitch and 4 degrees yaw (in mechanism coordinates). Similar to STS-130, but larger,\u201d listed a point by point overview of the STS-133 issues in the SSP FRR Orbiter Presentation (all FRR presentations available in L2 \u2013 numerous).<\/p>\n<p>\u201cClearance between Orbiter forward bulkhead and PMA-2 reduced to 16.4 inches. Time from initial contact to hooks closed was 50 minutes. Timeline impact. ISS out of certified attitude. ISS power concerns. ISS longeron shadowing. Unable to model combined gravity-gradient and dynamic effects.\u201d<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-18809\" title=\"A5\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2011\/04\/A512.jpg\" alt=\"\" width=\"347\" height=\"224\">As a result of the evaluations, the Orbiter Project recommended a change to the docking procedure for STS-134, revolving around the \u201cfixers\u201d in the docking hardware.<\/p>\n<p>\u201cRecommending docking procedure update for STS-134. Current procedure pauses on loss of ring alignment. Pause disables fixers and permits vehicles to oscillate,\u201d added the Orbiter FRR presentation.<\/p>\n<p>\u201cUpdated procedure pauses on indication of initial contact. Initial contact envelopes fixers. Fixers will control misalignment throughout ring retraction. Total docking time of 15-20 minutes. Consistent with docking system design and certification. Pending two confirmations. Approvals in work.\u201d<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-18811\" title=\"A325\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2011\/04\/A325.jpg\" alt=\"\" width=\"308\" height=\"314\">The noted approval process involves numerous centers and even the Russians at RSC Energia, with an update to the Standup meeting speaking of another review being scheduled at an upcoming Joint PRCB meeting,<\/p>\n<p>\u201cWorking with the community on the change in the docking procedure. The team has performed the analysis and discovered that even with a failed fixer in the new procedure, we cannot get contact between orbiter and station,\u201d noted the Orbiter Project on the Standup report. \u201cThis will be briefed at a Special OCCB, and then a JPRCB at a later date.\u201d<\/p>\n<p>The update was also the subject of praise from SSP manager John Shannon, who also referenced the painful layoffs which underwent another round throughout the Shuttle community recently, prior to the major job cull at the conclusion of STS-135.<\/p>\n<p>\u201cIt\u2019s really good to see that the team is working things like\u2026 docking procedure changes. That is what we have to keep doing here,\u201d noted Mr Shannon on the Standup report.<\/p>\n<p>\u201cWe had our last big contractor layoff last week, until the end of the Program. The team is in place to manage the final two missions, and folks know what they need to do to accomplish them successfully. So, we are set up and ready to go for April 29, 2011. We will come back late June\/early July and do STS-135 to finish up really well.\u201d<\/p>\n<p>(Numerous articles will follow. L2 members refer to STS-134 coverage sections for internal coverage,&nbsp;presentations, images and&nbsp;and updates from engineers and managers.&nbsp;Images used: All via L2 content and L2 presentations).<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Following a relatively relaxed week at Pad 39A, Endeavour is preparing to enter Ordnance installation tasks on Monday and Tuesday, as the youngest orbiter in the fleet heads into her final week prior to the launch countdown. With the Flight Readiness Review (FRR) also set to take place on Tuesday, managers are making their final [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":29602,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":"","_links_to":"","_links_to_target":""},"categories":[2],"tags":[233,3366],"class_list":["post-40479","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","tag-iss","tag-sts-134"],"acf":[],"_links":{"self":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/40479"}],"collection":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/comments?post=40479"}],"version-history":[{"count":0,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/40479\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/media\/29602"}],"wp:attachment":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/media?parent=40479"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/categories?post=40479"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/tags?post=40479"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}