{"id":40490,"date":"2011-04-04T18:05:31","date_gmt":"2011-04-04T10:05:31","guid":{"rendered":"https:\/\/wp-productionenv-bjg9h2g2bgg5b8aa.southeastasia-01.azurewebsites.net\/news\/sts-134-launch-date-slips-to-april-29-due-to-russian-progress-conflict\/"},"modified":"2011-04-04T18:05:31","modified_gmt":"2011-04-04T10:05:31","slug":"sts-134-launch-date-slips-to-april-29-due-to-russian-progress-conflict","status":"publish","type":"post","link":"https:\/\/starpath.global\/news\/sts-134-launch-date-slips-to-april-29-due-to-russian-progress-conflict\/","title":{"rendered":"STS-134: Launch date slips to April 29 due to Russian Progress conflict"},"content":{"rendered":"<p>NASA managers \u2013 following negotiations with their Russian partners \u2013 have decided to slip STS-134 to April 29. The slip of STS-134 \u2013&nbsp;Endeavour\u2019s final mission to the International Space Station (ISS) \u2013&nbsp;allows for the Russian Progress M-10M cargo ship to remain on its April 27 launch date. The vehicle will now dock with the ISS on the same day Endeavour is scheduled to launch.<\/p>\n<p>STS-134 Slip:<\/p>\n<p>It has been known since last month that a potential conflict between STS-134 and the Progress M-10M was still to be resolved, although it was always believed that Endeavour would hold priority, with the Russians moving their launch date to allow STS-134 to remain on track to open the launch window on April 19.<\/p>\n<p>Going into the negotiations, understood to have taken place on Sunday \u2013 after NASA management arrived at the Baikonur Cosmodrome in Kazakhstan for the Soyuz TMA-21 launch \u2013 Endeavour\u2019s available launch window ran from April 19 \u2013 May 3. However, contained within that window is an April 23-29 cutout (or elimination of launch opportunities for Endeavour) due to the currently-scheduled rotation of Progress unmanned resupply vehicles at the ISS.<\/p>\n<h4 class=\"widget-title penci-border-arrow\">See Also<\/h4>\n<ul>\n<li>STS-134 LIVE UPDATES<\/li>\n<li>L2 STS-134 Special Section<\/li>\n<li>Click here to Join L2<\/li>\n<\/ul>\n<p>Only one line, in a managerial summary memo on March 21 hinted towards the Russians showing a strong preference for their vehicle to remain on schedule, mainly relating to the Progress\u2019 time-sensitive cargo, understood to be a biological experiment which needs to be placed into one of the ISS\u2019 freezers within days of launch.<\/p>\n<p>\u201cRussians have asked for launch slip for STS-134 to deconflict Progress dock\/undock,\u201d noted the memo from the Mission Operations Directorate (MOD). Options such as transferring the time-sensitive payload to Endeavour, or a plan to loiter the Progress on orbit should Endeavour\u2019s launch directly conflict, appear to have been unacceptable.<\/p>\n<p>While many people could have assumed a resupply craft would not be able to hold priority over a hugely important shuttle mission, Russian commentators have noted numerous occasions where they have altered their plans for NASA, which is likely to have been the basis for agreeing to provide assistance to Roscosmos this time around.<\/p>\n<p><img fetchpriority=\"high\" decoding=\"async\" class=\"alignleft size-full wp-image-18644\" title=\"A4\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2011\/04\/A42.jpg\" alt=\"\" width=\"349\" height=\"283\">\u201cThe STS-134 launch date is moving from April 19th to April 29th to de-conflict the upcoming vehicle traffic at the Space Station, with the Russian 41 Progress scheduled to undock on 4\/26 and the Russian 42 Progress scheduled to launch on 4\/27 and dock on 4\/29,\u201d noted a memo on the slip, acquired by L2.<\/p>\n<p>Citing the slip will allow additional breathing room in the event Endeavour\u2019s mission requires extra time during her docked mission, the update also noted work is continuing on what is known as Dual Docked Operations (DDO), a constraint of having a docked orbiter on the Station when another vehicle is scheduled to dock or undock.<\/p>\n<p>NASA mission patches<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>Aerospace industry analysis<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>SpaceX launch tickets<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>\n<p>     (adsbygoogle = window.adsbygoogle || []).push({});<\/p>\n<p>This DDO work is focusing on the contingency of Endeavour being delayed until a May launch date \u2013 in the event of a technical issue, weather, etc. \u2013 overlapping with the undocking of one of the Soyuz\u2019s from the ISS<\/p>\n<p>\u201cLaunching STS-134 on 4\/29 provides a larger launch window and gives us the best opportunity to extend the docked portion of the mission by a day or two if required,\u201d the notes added. \u201cTeams are looking at the possibility of dual docked ops with the Soyuz 25 scheduled to undock on May 16th in case we cannot get off the pad until early May. Early indications are that this will not be an issue.\u201d<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-18643\" title=\"A3\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2011\/04\/A32.jpg\" alt=\"\" width=\"347\" height=\"245\">Although the 29th is the last day of the cutout on the previously calculated cutout, because the Progress will be docking early in the day, providing all goes to plan, Endeavour would be cleared to launch on the 29th as is now official. Discovery was also counting down on her launch day, with the caveat of waiting for ATV-2 to successfully dock that same day.<\/p>\n<p>As a result of the slip, the Agency Flight Readiness Review (FRR), which sets the official launch date following a highly technical overview of Endeavour and her mission \u2013 is also in the process of moving from April 8 to approximately April 19.<\/p>\n<p>The slip may impact on the potential for a Soyuz flyabout of the ISS and Endeavour, due to the new timeline for the docked mission, due to the change in the Russian ground station passes compared to the previous schedule.<\/p>\n<p>Processing Latest:<\/p>\n<p>Following last week\u2019s severe storm over the Kennedy Space Center (KSC), inspections of the STS-134 stack were completed over the weekend, showing nothing more than minor damage to Endeavour\u2019s External Tank (ET-122). No repair work is expected as a result, although final clearance isn\u2019t expected until Tuesday.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-18645\" title=\"A411\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2011\/04\/A411.jpg\" alt=\"\" width=\"346\" height=\"254\">\u201cS0018.100 severe weather walk downs were performed. Engineering is assessing potential damage from the heavy rains, wind, lightning, and reported hail. The lightning indications were outside of the 0.3 nautical miles; therefore, the preliminary assessment showed there is no concern to the vehicle,\u201d noted the NASA Test Director (NTD) report on Monday (L2).<\/p>\n<p>\u201cThe ET sustained minor hail damage mainly near the -Y GOX seal footprint and pencil point areas. Orbiter tile completed preliminary walkdowns and have reported no damage to the orbiter. An Engineering Review Board (ERB) will be held Tuesday to evaluate all the findings.\u201d<\/p>\n<p>With the Terminal Countdown Demonstration Test (TCDT) \u2013 also known as S0017 operations \u2013 successfully completed completed on Friday, engineers are working on four new Interim Problem Reports (IPRs), most of which are related to the dress rehearsal. Most of the IPRs are listed as accidental switch throws and hold no constraint to the flow.<\/p>\n<p>With the weather-related delay to the completion of the TCDT, engineers were aiming to catch up on the pre-scheduled flow, although they now have an additional 10 days due to the launch date slip.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-18646\" title=\"A224\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2011\/04\/A224.jpg\" alt=\"\" width=\"307\" height=\"220\">Going into Monday, engineers were preparing for a week highlighted by the Hypergolic fueling of the Solid Rocket Booster (SRB) Hydraulic Power Units (HPU), along with Ordnance Installation tasks. Managers may opt to delay these tasks to realign with the new launch date target.<\/p>\n<p>\u201cIMU (Inertial Measurement Unit) calibration was completed Friday night post-TCDT. S1287 Orbiter Aft Closeouts continue. S0024 HPU hyper load is (was) scheduled to begin this morning (Monday),\u201d added the NTD report.<\/p>\n<p>\u201cPad A will (was to) be cleared at 0800 EST this morning (Monday). HPU hydrazine loading operations will (was to) begin around 0900 EST. S5009 Ordnance Installation is (was) scheduled to begin tomorrow (Tuesday) afternoon with call to stations at 1400 EST. S07134 AMS End-to-End Test is (was) scheduled for Wednesday.\u201d<\/p>\n<p>(Numerous articles will follow. L2 members refer to STS-134 coverage sections for internal coverage,&nbsp;presentations, images and&nbsp;and updates from engineers and managers.&nbsp;Images used: L2 Presentations and NASA TV).<\/p>\n","protected":false},"excerpt":{"rendered":"<p>NASA managers \u2013 following negotiations with their Russian partners \u2013 have decided to slip STS-134 to April 29. The slip of STS-134 \u2013&nbsp;Endeavour\u2019s final mission to the International Space Station (ISS) \u2013&nbsp;allows for the Russian Progress M-10M cargo ship to remain on its April 27 launch date. The vehicle will now dock with the ISS [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":"","_links_to":"","_links_to_target":""},"categories":[2],"tags":[7900,3366],"class_list":["post-40490","post","type-post","status-publish","format-standard","hentry","category-news","tag-russian","tag-sts-134"],"acf":[],"_links":{"self":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/40490"}],"collection":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/comments?post=40490"}],"version-history":[{"count":0,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/40490\/revisions"}],"wp:attachment":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/media?parent=40490"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/categories?post=40490"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/tags?post=40490"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}