{"id":40503,"date":"2011-03-14T22:40:53","date_gmt":"2011-03-14T14:40:53","guid":{"rendered":"https:\/\/wp-productionenv-bjg9h2g2bgg5b8aa.southeastasia-01.azurewebsites.net\/news\/discoverys-elaborate-deservicing-plan-put-into-work-amid-managerial-praise\/"},"modified":"2011-03-14T22:40:53","modified_gmt":"2011-03-14T14:40:53","slug":"discoverys-elaborate-deservicing-plan-put-into-work-amid-managerial-praise","status":"publish","type":"post","link":"https:\/\/starpath.global\/news\/discoverys-elaborate-deservicing-plan-put-into-work-amid-managerial-praise\/","title":{"rendered":"Discovery\u2019s elaborate deservicing plan put into work amid managerial praise"},"content":{"rendered":"<p>Although Discovery has finished her space flight career in style, she still has many months of processing ahead of her \u2013 as deserving work follows a pre-planned schedule towards her eventual ferry away from the Kennedy Space Center (KSC). Her final mission was flawless, earning managerial praise for the teams tasked with \u201cfinishing strong\u201d during what is now the final months of the Space Shuttle Program.<\/p>\n<p>Discovery Post Career Latest:<\/p>\n<p>Officially tagged as Transition and Retirement (T&amp;R) operations, Discovery still has many more months of work to undergo at KSC, including one more trip to the Vehicle Assembly Building (VAB).<\/p>\n<p>She headed back to her OPF with applause and tears from many of the crowd gathered at the space center last week, but it was notably pure professionalism from her workforce \u2013 in a sign of respect for the orbiter which many of her engineers regard as highly as the astronauts.&nbsp;<\/p>\n<h4 class=\"widget-title penci-border-arrow\">See Also<\/h4>\n<ul>\n<li>Discovery Forum Section<\/li>\n<li>L2 STS-133 Special Section<\/li>\n<li>Click here to Join L2<\/li>\n<\/ul>\n<p>Even official documentation shows the love that is embedded into the workforce for the veteran orbiter, as they prepare her for one more final flight, this time to a place of honor at an exhibition.<\/p>\n<p>\u201cDiscovery (is) back on the ground and ready to begin her final processing flow. Although none of us are ready to put Discovery into retirement, the time has come for us to share her with the public,\u201d noted one deservicing note (L2). \u201cThe official decision for where Discovery will be displayed has yet to be made, but we are anticipating the announcement in mid-April.<\/p>\n<p>\u201cAfter landing, we will spend approximately a year preparing Discovery to be able to be safely accessed by the public. Many of you may not be intimately familiar with the Transition &amp; Retirement plans for Discovery so I wanted to give a brief description of what will be occurring over the next 11 months.\u201d<\/p>\n<p>Notably, with one Orbiter Processing Facility (OPF) soon to be handed over to what is rumored to be one of the USAF\u2019s X-37Bs, only two OPFs will be available for what will be the deservicing of three orbiters, as Endeavour and Atlantis complete their final missions over the next few months.<\/p>\n<p><img fetchpriority=\"high\" decoding=\"async\" class=\"alignleft size-full wp-image-18450\" title=\"A8\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2011\/03\/A85.jpg\" alt=\"\" width=\"324\" height=\"198\" srcset=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2011\/03\/A85.jpg 324w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2011\/03\/A85-180x110.jpg 180w\" sizes=\"(max-width: 324px) 100vw, 324px\">As such, Discovery will undergo Down Mission Processing (DMP) work in OPF-2 for two months, during which time she will be stripped of her Orbital Manuevering System (OMS) pods and Forward Reaction Control System (FRCS), prior to being rolled over to High Bay 4 (HB-4) of the VAB.&nbsp;<\/p>\n<p>Aerospace industry analysis<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>Aerospace &amp; Defense<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>Company News<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>\n<p>     (adsbygoogle = window.adsbygoogle || []).push({});<\/p>\n<p>\u201cRoll in to OPF-2 (Please note: OPF-3 is being prepared for turnover to a future customer so we will be processing all T&amp;R activities out of OPFs 1 &amp; 2). Spend about two months performing standard Down Mission Processing activities and removing the OMS pods and FRCS,\u201d added the information.<\/p>\n<p>\u201cThe OMS Pods and FRCS will be sent to the HMF (Hypergolic Maintenance Facility) for initial safing and then transported to WSTF (White Sands Test Facility, New Mexico) for decommissioning. Roll OV-103 (Discovery) to VAB HB-4 for approximately 1 month of storage while OV-105\u2019s (Endeavour) Down Mission Processing occurs in OPF-2.\u201d<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-18444\" title=\"A510\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2011\/03\/A510.jpg\" alt=\"\" width=\"342\" height=\"248\">A game of musical chairs will continue with the orbiters, as Discovery then moves to OPF-1 for a series of final T&amp;R activities, which continues to follow a relatively recent plan to use Space Shuttle Main Engine (SSME) simulators, in order to save and preserve Discovery\u2019s own SSMEs for a potential future role with the Space Launch System (SLS) \u2013 as was previously revealed by this site.<\/p>\n<p>It was back in October of last year when a Program Requirements Control Board (PRCB) meeting recommended the orbiters should instead gain Replica Shuttle Main Engines (RSMEs) \u2013&nbsp; previously scrapped nozzles installed via an adaptor \u2013 for when all three of the vehicles retire to exhibitions.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-18451\" title=\"A519\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2011\/03\/A519.jpg\" alt=\"\" width=\"325\" height=\"195\">However, it remains uncertain that the SLS will be a Shuttle Derived Heavy Lift Launch Vehicle (SD HLV), flying with SSMEs \u2013 which would use the current stock of RS-25Ds, before moving to a cheaper expendable RS-25E version. Agency and political evaluations are continuing on the ability to create the SLS both on cost and schedule.<\/p>\n<p>\u201cOnce OV-104 (Atlantis) rolls out of OPF-1, OV-103 will roll into OPF-1 to complete the remainder of the T&amp;R flow,\u201d the forward plan for the orbiters continued, \u201cwhich includes: End State Safing \u2013 removing hazardous commodities and components from the vehicle.<\/p>\n<p>Preparation for Display \u2013 installing OMS pods, FRCS, and SSME simulators as well as preparing for ferry.<\/p>\n<p>\u201cDisplay Site Ops \u2013 load onto the SCA (Shuttle Carrier Aircraft), ferry to display site, offload from SCA, and perform final display site configuration activities.\u201d<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-18446\" title=\"B5\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2011\/03\/B5.jpg\" alt=\"\" width=\"345\" height=\"219\">While the orbiters would be rolled to the Shuttle Landing Facility (SLF) to be mated atop of the SCA \u2013 not unlike the days where orbiters would be ferried to Palmdale, California, for Major Modification Periods (MMPs) \u2013 only KSC and Dryden Flight Research Facility (DFRC) have the Mate-Demate Facility available for the purpose of loading and indeed offloading an orbiter from a SCA.<\/p>\n<p>This would mean the final location for the orbiters would require two large cranes to help them off the SCA, as previously seen when Enterprise was delivered to the Smithsonian National Air and Space Museum in Washington, D.C.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-18445\" title=\"A67\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2011\/03\/A67.jpg\" alt=\"\" width=\"343\" height=\"255\">The current plan is expected to see the exhibition swapping the Enterprise test orbiter&nbsp;with&nbsp;the historic Discovery.<\/p>\n<p>It is not known where Enterprise would be relocated to, other than a large amount of engineering&nbsp;evaluations were carried out on her structure, so as to ensure her ability to be ferried to a new location.<\/p>\n<p>The results were deemed to be acceptable, showing the pathfinder was in a better-than-expected condition.<\/p>\n<p>It is possible that the final locations may start to be announced from mid-April, with a battle set to take place to attract one of the national treasures to their city.<\/p>\n<p>For now, Discovery is undergoing the opening work on the T&amp;R plan, which is mainly related to the continued \u2013 and usual \u2013 safing of the vehicle, following her excellent performance on the STS-133 mission to the International Space Station (ISS).<\/p>\n<p>STS-133 News Articles (over 120 articles): http:\/\/www.nasaspaceflight.com\/tag\/sts-133\/<\/p>\n<p>\u201cOV-103 (OPF Bay 2): Roll-in operations are proceeding as planned. Fuel Cell cool down completed and SSME bearing drying has begun. PRSD (Power Reactant Storage and Distributation) Cryogenic Tank drain was completed,\u201d added the NASA Test Director (NTD) report (L2).<\/p>\n<p>\u201cOMS\/RCS and OME post-flight operations picked up. OMS trickle purge activation was completed over the weekend. Payload Bay Doors will be opened late Monday. FRCS helium tank vents will be performed late Monday evening.\u201d<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-18454\" title=\"B7\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2011\/03\/B7.jpg\" alt=\"\" width=\"345\" height=\"235\">Praise for Discovery\u2019s performance, the crew\u2019s over-achievement of their mission objectives, and the safe conclusion to the flight was never lacking from managers, nor has praise for the overall team\u2019s effort both before, during and after the mission, which specifically earned remarks from Space Shuttle Manager (SSP) manager John Shannon.<\/p>\n<p>\u201cDiscovery\u2019s landing was an outstanding end to an amazing mission. STS-133 installed the last permanent pressurized module on the ISS, provided a large amount of logistics and critical spares, and positioned the ISS to aggressively pursue its function as a research laboratory,\u201d noted Mr Shannon in an address to the workforce (L2).<\/p>\n<p>\u201cThe preparation for this mission really challenged the team. The issues that we had during the initial attempt in November were difficult and time-consuming to solve. The External Tank and Center Engineering teams did a terrific job in developing new testing and analysis methods that demonstrated that the tank was safe to fly. The training of a new crew member late in the flow challenged our schedule.<\/p>\n<p>\u201cThrough all of these issues, the team rose to the challenges and made good decisions. I couldn\u2019t have been more proud of the team when Discovery lifted off the pad \u2013 we truly \u201cearned\u201d this one through our careful pre-flight work.\u201d<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-18453\" title=\"B6\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2011\/03\/B6.jpg\" alt=\"\" width=\"343\" height=\"241\">As noted, managers were impressed by the professionalism of Discovery\u2019s teams, as they greeted her on the SLF with the same dedication and attitude she had come to expect during all of her previous missions. Although this was clearly an emotional time, the orbiter crews \u2013 despite the looming end to their careers \u2013 continue to \u201cfinish strong\u201d.<br \/>\n&nbsp;<br \/>\n\u201cI was really struck by the \u201cbusiness as usual\u201d attitude of the dedicated team that takes care of our Orbiters. Even though this was the last flight for Discovery, there was no visible negative emotion. Instead I saw extreme dedication to making sure that we do the job right and that we preserve this Program\u2019s legacy,\u201d added Mr Shannon.<\/p>\n<p>\u201cIt is vitally important that all elements of the program maintain this same attitude for our remaining two launches. We must stay focused, maintain our rigor, and make good decisions. The decisions we make as a team over the next several months will not only preserve the Shuttle legacy, but they will also demonstrate that this team is ready for the next challenge in Human Space Flight.<\/p>\n<p>\u201cTo those team members that have flown their last flight with us \u2013 You should walk away with your head held very high. You have built and kept safe a unique capability in the most extreme of environments.<\/p>\n<p>\u201cI can only hope that others that come after us will look back at the Space Shuttle team and emulate the dedication, perseverance, and excellence that this team represents. If they do, we will have an outstanding human spaceflight program. For those team members remaining.<\/p>\n<p>\u201cLet\u2019s go finish this program strong.\u201d<\/p>\n<p>(Further articles will follow, as we follow Discovery all the way to the exhibition. L2 members refer to L2\u2019s ongoing coverage sections for internal coverage,&nbsp;presentations, images and&nbsp;and updates from engineers and managers.&nbsp;Images used: Lead: Larry Sullivan\/MaxQ Entertainment\/NASASpaceflight.com. All other images via L2, bar Ferry and OPF shots \u2013 via NASA.gov).<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Although Discovery has finished her space flight career in style, she still has many months of processing ahead of her \u2013 as deserving work follows a pre-planned schedule towards her eventual ferry away from the Kennedy Space Center (KSC). Her final mission was flawless, earning managerial praise for the teams tasked with \u201cfinishing strong\u201d during [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":29548,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":"","_links_to":"","_links_to_target":""},"categories":[2],"tags":[3789,9051,9022],"class_list":["post-40503","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","tag-discovery","tag-sts-133","tag-tr"],"acf":[],"_links":{"self":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/40503"}],"collection":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/comments?post=40503"}],"version-history":[{"count":0,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/40503\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/media\/29548"}],"wp:attachment":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/media?parent=40503"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/categories?post=40503"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/tags?post=40503"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}