{"id":40512,"date":"2011-03-04T18:53:35","date_gmt":"2011-03-04T10:53:35","guid":{"rendered":"https:\/\/wp-productionenv-bjg9h2g2bgg5b8aa.southeastasia-01.azurewebsites.net\/news\/sts-133-workhorse-discovery-exemplifying-routine-orbiter-excellence\/"},"modified":"2011-03-04T18:53:35","modified_gmt":"2011-03-04T10:53:35","slug":"sts-133-workhorse-discovery-exemplifying-routine-orbiter-excellence","status":"publish","type":"post","link":"https:\/\/starpath.global\/news\/sts-133-workhorse-discovery-exemplifying-routine-orbiter-excellence\/","title":{"rendered":"STS-133: Workhorse Discovery exemplifying routine orbiter excellence"},"content":{"rendered":"<p>With Discovery enjoying her final docked mission \u2013 with glowing praise from her crew during nearly every media event \u2013 the workhorse of the fleet is providing no headaches for her engineering teams on the ground during her swansong flight. No issues of note are being worked on the orbiter in one of the \u201ccleanest\u201d missions in shuttle history, otherwise known&nbsp;as the routine excellence from the fleet during recent years.<\/p>\n<p>STS-133 Latest:<\/p>\n<p>When Discovery began suffering from launch delays, due to problems with her External Tank (ET-137), some people joked the orbiter had conspired with her problematic&nbsp;orange friend from New Orleans, in order to resist her impending retirement date. Ironically, Discovery\u2019s superb performance on orbit has resulted in just that, with two additional docked days added by the Mission Management Team (MMT).<\/p>\n<p><img fetchpriority=\"high\" decoding=\"async\" class=\"alignleft size-full wp-image-18317\" title=\"OLYMPUS DIGITAL CAMERA\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2011\/03\/A6.jpg\" alt=\"\" width=\"342\" height=\"244\">The allowance for the additional docked days on the ISS is based mainly on the performance of the Fuel Cells, as they demand sustenance from the orbiter\u2019s PRSD (Power Reactant Storage and Distributation) tank loads, eased by the help from the Station-to-Shuttle Power Transfer&nbsp;System (SSPTS).<\/p>\n<p>Some achievement, given Discovery had been slightly handicapped by the removal of one of her PRSD tanks ahead of the mission during her processing flow, in order to make allowances for the heavy payload she was tasked with delivering to the International Space Station (ISS).<\/p>\n<p>\u201cThe MMT approved an additional day on-orbit at the meeting. The first landing opportunity at KSC is now targeted for Wednesday, March 9 at approximately 11:59 EST,\u201d noted the MMT (L2). \u201cAn orbit adjustment is anticipated (in the calculations) and could affect the landing time. The new landing time will be posted once it is available.\u201d<\/p>\n<p>The change to the mission timeline will also allow Discovery to achieve yet another historic milestone, one of being in space for a full one year period over her career of 39 flights.<\/p>\n<p>\u201cThe Orbiter Discovery\u2019s performance continues to be outstanding,\u201d opened one of the numerous Mission Evaluation Room (MER) reports (L2) on Discovery\u2019s docked mission, which recently included a reboost of the station via the orbiter\u2019s Reaction Control System (RCS) thrusters.<\/p>\n<p>\u201cThe crew started the reboost at 062\/14:03:37 GMT (6\/16:10:12 MET) and terminated the burn at 062\/14:32:26 GMT (6\/16:39:01MET). The reboost resulted in a total velocity change of 3.3 feet per second (when including the attitude maneuvers) and an altitude increase of 0.92 nautical miles,\u201d added MER notes.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-18316\" title=\"OLYMPUS DIGITAL CAMERA\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2011\/03\/A52.jpg\" alt=\"\" width=\"347\" height=\"243\">\u201cThe right RCS fuel pressure reached a secondary lockup pressure of 263 psia eight hours before the reboost. Following reboost, fuel pressure dropped down to 248 psia. Leak rate will be recalculated after right pod stabilization.\u201d<\/p>\n<p>Technology News<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>Rocket building kits<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>Space Shuttle models<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>\n<p>     (adsbygoogle = window.adsbygoogle || []).push({});<\/p>\n<p>Although classed as an extremely minor issue, with zero mission impact, the Right RCS Fuel Helium Primary Regulator Creep is the only MER item which can be classed as related to Discovery\u2019s primary hardware. It will continue to be monitored, as it was during the nominal reboost.<\/p>\n<p>\u201cRRCS Fuel primary reg creep continues to be monitored. Eight hours prior to reboost activity, leakage appeared to stop while pressure was at 263 (secondary Lock up pressure). Following Reboost, ullage pressure was at 248 psia. At this time the pod environment is still stabilizing therefore leak rate will not be calculated.\u201d<\/p>\n<p>At the latest count on MER documentation, 25 of 38 primary thrusters have been fired. All required RCS thrusters will be fired \u2013 as planned \u2013 during the routine checkouts on EOM-1 (End Of Mission -1 day), as the crew prepare to take Discovery back through the atmosphere one final time.<\/p>\n<h4 class=\"widget-title penci-border-arrow\">See Also<\/h4>\n<ul>\n<li>STS-133 FLIGHT DAY LIVE<\/li>\n<li>L2 STS-133 Special Section<\/li>\n<li>Click here to Join L2<\/li>\n<\/ul>\n<p>Before that historic return takes place, the crew still have a large amount of work to do on Station, as the goal of leaving the giant laboratory in the best possible configuration continues to be achieved.<\/p>\n<p>With the two extra docked days, the strain on post STS-133 stage operations is being greatly reduced, with the advantage of six extra crewmembers aiding the outfitting of the newly delivered PMM (Permanent Multipurpose Module) Leonardo.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-18318\" title=\"A471\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2011\/03\/A471.jpg\" alt=\"\" width=\"324\" height=\"234\">Although there is a large amount of public, media \u2013 and event Presidential \u2013 interest in seeing the crew rush into the unpacking of the newest member of the ISS team \u2013 Robonaut 2 (R2) \u2013 the primary goal of outfitting includes the transfer of launch hardware used to protect the PMM\u2019s cargo from the stresses of Discovery\u2019s ride uphill.<\/p>\n<p>The materials include foam packaging, which is being transferred to the HTV-2, ahead of its planned departure from the ISS for a pre-programmed entry into a disposal corridor. Supplies from the HTV-2 also have to be transferred via carefully choreographed procedures, in order to maintain the correct center of gravity in the modules.<\/p>\n<p>These operations continued on Flight Day 10, as work elsewhere on the Station took place, relating to maintenance on the Oxygen Generation Assembly&nbsp;(OGA), which has been waiting for the arrival of Discovery to deliever a remediation kit, whilst providing a ride home to Earth for the OGA\u2019s hydrogen dome in Discovery\u2019s middeck.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-18320\" title=\"A8\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2011\/03\/A8.jpg\" alt=\"\" width=\"347\" height=\"234\">Work also took place on the Lab Carbon Dioxide Removal Assembly (CDRA), while the Russians also evaluated problems with their own CO2 scrubber \u2013 the Vozdukh \u2013 which once again failed late on Flight Day 9.<\/p>\n<p>Once Discovery departs the orbital outpost, she\u2019ll be leaving the Station with a parting donation of spare oxygen. Although it is hard to calculate exactly how many pounds of O2 the Station will be left with \u2013 due to changes in tank pressures relating to solar beta angles the ISS flies through \u2013 the Station will be left in a very healthy situation.<\/p>\n<p>\u201cOn the math from the Environmental Control and Life Support System (ECLSS) officer, we\u2019ll leave with the O2 tanks full on ISS when Discovery departs,\u201d noted ISS Lead Flight Director Royce Renfrew at the latest Mission Status Briefing on Flight Day 9.<\/p>\n<p>The crew are also tasked with adding to the ISS\u2019 water supplies, with the usual shuttle mission task of filling Contingency Water Containers (CWCs). According to MER status, two of the CWC bags were filled with water and iodine on FD 8 as an example of the operation. CWC-I number 7 was filled with 41.4 lbm water and CWC-I number 8 was filled with 42.7 lbm water.<\/p>\n<p>Saturday was&nbsp;the last full day the STS-133 crew will spend on the ISS, as they prepare for their farewells and hatch closure between the two vehicles on Sunday (Flight Day 11). Discovery is scheduled to undock from the ISS at 6:03am Central on Flight Day 12.<\/p>\n<p>(Numerous articles will follow. L2 members refer to STS-133 live coverage sections for internal coverage,&nbsp;presentations, images and&nbsp;and updates from engineers and managers \u2013 which is now into full and extensive live Flight Day coverage during the mission.&nbsp;Images used:&nbsp;Lead via NASA.gov.&nbsp;Graphics via L2).<\/p>\n","protected":false},"excerpt":{"rendered":"<p>With Discovery enjoying her final docked mission \u2013 with glowing praise from her crew during nearly every media event \u2013 the workhorse of the fleet is providing no headaches for her engineering teams on the ground during her swansong flight. No issues of note are being worked on the orbiter in one of the \u201ccleanest\u201d [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":29516,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":"","_links_to":"","_links_to_target":""},"categories":[2],"tags":[233,9051],"class_list":["post-40512","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","tag-iss","tag-sts-133"],"acf":[],"_links":{"self":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/40512"}],"collection":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/comments?post=40512"}],"version-history":[{"count":0,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/40512\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/media\/29516"}],"wp:attachment":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/media?parent=40512"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/categories?post=40512"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/tags?post=40512"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}