{"id":40618,"date":"2010-10-29T19:42:35","date_gmt":"2010-10-29T11:42:35","guid":{"rendered":"https:\/\/wp-productionenv-bjg9h2g2bgg5b8aa.southeastasia-01.azurewebsites.net\/news\/sts-133-pressurization-complete-into-checks-expected-countdown-preps\/"},"modified":"2010-10-29T19:42:35","modified_gmt":"2010-10-29T11:42:35","slug":"sts-133-pressurization-complete-into-checks-expected-countdown-preps","status":"publish","type":"post","link":"https:\/\/starpath.global\/news\/sts-133-pressurization-complete-into-checks-expected-countdown-preps\/","title":{"rendered":"STS-133: Pressurization complete \u2013 into checks, expected countdown preps"},"content":{"rendered":"<p>Engineers have completed S0071 tasks to pressurize Discovery\u2019s Right&nbsp;OMS (Orbital Maneuvering System), following the changeout of related couplings\/seals which delayed the start of the launch countdown (S0007). The repress of the OMS tank was lengthy process, with managers deciding on Saturday to move the launch date to Wednesday&nbsp;to&nbsp;avoid constricting S0007 tasks. Those tasks are complete and the countdown is to begin on Sunday.<\/p>\n<p>STS-133 Latest:<\/p>\n<p>Discovery was back into a nominal flow towards the original start of the launch countdown (S0007) \u2013 which was scheduled for 3pm local on Friday \u2013 following the repair of the Right OMS crossfeed flange, which required the changeout of two internal seals.<\/p>\n<p>\u201cOV-103 \/ SRB BI-144 \/ RSRM 112 \/ ET-137 (Pad-A): S1287 orbiter aft closeouts continue. Aft platform removals are complete. Aft confidence test is complete and the 50-1 &amp; 50-2 doors are installed,\u201d noted the NASA Test Director (NTD) processing update on Thursday (L2).<\/p>\n<p>\u201cS0007 launch countdown preps continue. S0071 pre-ops for Hyper\/MPS (Main Propulsion System) pressurization are complete. Call-to-stations is planned for 1400 EDT with pressurization picking up (Thursday) night.\u201d<\/p>\n<h4 class=\"widget-title penci-border-arrow\">See Also<\/h4>\n<ul>\n<li>STS-133 UPDATES<\/li>\n<li>L2 STS-133 Special Section<\/li>\n<li>Click here to Join L2<\/li>\n<\/ul>\n<p>IPRs during major tasks \u2013 such as pressurization of the vehicle \u2013 are not uncommon. However, Thursday\u2019s overnight operations to conduct S0071 tasks encountered two issues, though it has already been noted there is no relation to the aforementioned work on the crossfeed flange.<\/p>\n<p>The first issue, classed as IPR-52, related to a gaseous nitrogen (GN2) leak check on a Quick Disconnect (QD) fill valve \u2013 part of the system\u2019s Ground Support Equipment (GSE) \u2013 which saw engineers attempt to slam the Air Half Coupling (AHC).<\/p>\n<p>\u201cOV-103 \/ SRB BI-144 \/ RSRM 112 \/ ET-137 (Pad-A): New IPR-52. During GN2 Tank Fill Valve Leak Checks, MD525 QD indicated flow thru leakage when it should be closed. Troubleshooting attempted to slam the AHC\/GHC closed by bypassing the orifice in the GSE but this had no effect,\u201d noted the NTD report on Friday (L2).<\/p>\n<p>\u201cDe-mate of the QD revealed no obvious problems with the GHC (Ground Half Coupling) or AHC. The GHC was then removed, replaced, and re-mated to the AHC. The fill valve leak check procedure was repeated with no joy. The same flow thru leakage was seen.<\/p>\n<p>Space tourism guides<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>SpaceX launch tickets<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>Company News<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>\n<p>     (adsbygoogle = window.adsbygoogle || []).push({});<\/p>\n<p>\u201cThe problem appears to be with the AHC on the flight vehicle. The decision was made to proceed with S0071 and pressurize all the tanks as planned and then go back and fix this AHC after S0071. This part of the system is all clean gas and the QD can be isolated with the fill valve so it is possible to repair after pressurization is complete.\u201d<\/p>\n<p>As per the NTD, IPR-52 would have likely resulted in no delay to the start of the launch countdown, which includes some breathing room for minor troubleshooting tasks to be worked on without delaying the launch date itself. However, the second issue required repair work to take place ahead of S0007.<\/p>\n<p>STS-133 Specific Articles: http:\/\/www.nasaspaceflight.com\/tag\/sts-133\/<\/p>\n<p><img fetchpriority=\"high\" decoding=\"async\" class=\"alignleft size-full wp-image-16596\" title=\"A6\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2010\/10\/A610.jpg\" alt=\"\" width=\"324\" height=\"252\">Known as IPR-53, this issue is related to an o-ring being found \u201cstuck\u201d inside a helium coupling (another AHC), which required removal and replacement.<\/p>\n<p>\u201cNew IPR-53. After OMS\/RCS (Reaction Control System) stage 1 pressurization, when the GSE feeding the right OMS helium tank was isolated and vented, the vehicle side tank also vented down indicating MD515 AHC poppet was stuck open,\u201d noted the NTD.<\/p>\n<p>\u201cEngineers bypassed the GSE orifice and was able to get the poppet closed. The AHC\/GHC were demated to determine cause of the stuck poppet and half of the GHC o-ring was found stuck inside the AHC. This will drive R&amp;R the AHC on the right OMS helium tank.\u201d<\/p>\n<p>Once the R&amp;R had been completed, Discovery will have to resit her pressurization tasks on the Right OMS tank, which is conducted by using helium.<\/p>\n<p>\u201cEngineering is developing a plan and determining the parts required to vent the tank in order to perform the R&amp;R,\u201d the NTD continued. \u201cAfter the AHC is replaced, we will essentially have to perform S0071 ops again for the right OMS tank.\u201d<\/p>\n<p>*Updates will appear here. Refer to this page, live updates via the STS-133 section, and L2\u2019s live processing.*<\/p>\n<p>UPDATE 1: Mission Management Team (MMT) meeting to start at 4pm Eastern \u2013 expected to last two hours \u2013 to discuss the forward plan. Completed.<\/p>\n<p>UPDATE 2: Helium venting. IPR classed as still in work as of 10pm. Second shift is carrying out the coupler changeout. Testing will be conducted, before getting back into repress.<\/p>\n<p>UPDATE 3: Seal R&amp;R complete. Mass Spec checks in work. Will be followed by an initial load (six hours) prior to COPV full load process (16 hours). Managers to meet at 8am to discuss if they will head into S0007 Launch Countdown today, for a launch on Tuesday.<\/p>\n<p>UPDATE 4: Managers decide to delay the launch until Wednesday (3:52pm Eastern).<\/p>\n<p>UPDATE 5: Full load pressurization began at 15:10 local, and will take 16 hours to complete.<\/p>\n<p>UPDATE 6: OMS Tank repress complete. Disconnecting QDs, conducting mass specs, opening pad. Countdown to begin Sunday afternoon. A new article will be published at the start of S0007 operations.<\/p>\n<p>Meanwhile, no other issues are being reported with Discovery, with other pressurization tasks and closeouts either complete, or in the process of being completed.<\/p>\n<p>\u201cS0071 Hyper\/MPS Pressurization for flight is still in work and is expected to be completed by mid 1st shift today. The MPS\/SSME portion is complete and the team is continuing with the left OMS load to flight pressure. The right OMS tank remains locked up at 1st stage press, but will have to be vented down to resolve the AHC discrepancy in IPR-53.<\/p>\n<p>\u201cS1287 orbiter aft closeouts are complete. Final Aft confidence test is complete. MPS final preps and ODS (Orbiter Docking System) Aft confidence test are complete.\u201d<\/p>\n<p>Further updates&nbsp;will follow.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Engineers have completed S0071 tasks to pressurize Discovery\u2019s Right&nbsp;OMS (Orbital Maneuvering System), following the changeout of related couplings\/seals which delayed the start of the launch countdown (S0007). The repress of the OMS tank was lengthy process, with managers deciding on Saturday to move the launch date to Wednesday&nbsp;to&nbsp;avoid constricting S0007 tasks. Those tasks are complete [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":29611,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":"","_links_to":"","_links_to_target":""},"categories":[2],"tags":[9051],"class_list":["post-40618","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","tag-sts-133"],"acf":[],"_links":{"self":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/40618"}],"collection":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/comments?post=40618"}],"version-history":[{"count":0,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/40618\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/media\/29611"}],"wp:attachment":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/media?parent=40618"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/categories?post=40618"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/tags?post=40618"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}