{"id":40651,"date":"2010-09-22T18:07:29","date_gmt":"2010-09-22T10:07:29","guid":{"rendered":"https:\/\/wp-productionenv-bjg9h2g2bgg5b8aa.southeastasia-01.azurewebsites.net\/news\/maf-speak-of-their-pride-in-returning-et-122-to-the-shuttle-manifest\/"},"modified":"2010-09-22T18:07:29","modified_gmt":"2010-09-22T10:07:29","slug":"maf-speak-of-their-pride-in-returning-et-122-to-the-shuttle-manifest","status":"publish","type":"post","link":"https:\/\/starpath.global\/news\/maf-speak-of-their-pride-in-returning-et-122-to-the-shuttle-manifest\/","title":{"rendered":"MAF speak of their pride in returning ET-122 to the Shuttle manifest"},"content":{"rendered":"<p>NASA and Lockheed Martin managers at the Michoud Assembly Facility (MAF) have spoken pride in the manufacturing, assembly, and repair work on External Tank 122 (ET-122), which was damaged by Hurricane Katrina five years ago. On Monday morning, the tank was rolled from Building 420 to the Pegasus barge that will carry it to Kennedy Space Center over the next week.<\/p>\n<p>ET-122:<\/p>\n<p>The tank is tentatively assigned to fly on STS-134 in February, but a final decision on which tank will fly that mission \u2013 ET-138 or ET-122 \u2013 will be made between now and November.<\/p>\n<p>As noted in the Program Requirements Control Board (PRCB) presentation on the tank allocation debate, there are some slight differences between ET-138 and ET-122 \u2013 visible by a large number of repair patches on the latter, but also by way of safety modifications.<\/p>\n<h4 class=\"widget-title penci-border-arrow\">See Also<\/h4>\n<ul>\n<li>STS-134 LIVE UPDATES<\/li>\n<li>L2 STS-134 Special Section<\/li>\n<li>Click here to Join L2<\/li>\n<\/ul>\n<p>\u201cBoth ET-122 and ET-138 are very much fit to fly,\u201d said Pat Whipps, NASA resident manager at Michoud and ET deputy project manager to NASASpaceflight.com report Philip Sloss. \u201cET-122 represents a couple of design modifications less than ET-138, primarily because it was originally an older tank.<\/p>\n<p>\u201cWhen we were given the go-ahead from a program standpoint to get it fit to fly as a launch-on-need for potentially the very last Shuttle mission, the timeframe didn\u2019t allow us to incorporate all the new design return-to-flight modifications; however, the configuration that ET-122 represents is one we\u2019ve already flown several times.<\/p>\n<p>\u201cSince then, we\u2019ve also learned quite a bit more about the physics of debris liberation from the foam and are much less concerned than we would have otherwise. ET-138 represents the last of the inline production built tanks, so it does have all of those final design modifications.\u201d<\/p>\n<p><img fetchpriority=\"high\" decoding=\"async\" class=\"alignleft size-full wp-image-16085\" title=\"D1e\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2010\/09\/D1e.jpg\" alt=\"\" width=\"312\" height=\"198\">Thanks to a continuous process of mitigating the loss of Thermal Protection System (TPS) foam, those main differences relate to areas such as the Ice Frost Ramps (IFRs), previously an area of interest for small sections of foam liberating during ascent.<\/p>\n<p>     (adsbygoogle = window.adsbygoogle || []).push({});<\/p>\n<p>\u201cThe ice-frost ramps on ET-138 are a little different design than those on ET-122, which were already applied at the time of its original build,\u201d added Whipps. \u201cSecondly, the yokes that are primarily made out of titanium today were made out of aluminum prior, and so the potential might be a little bit more ice might accumulate on those yokes that hold the LOX tank feedline that runs down the side of the tank.<\/p>\n<p>\u201cWe understand those mechanisms and have less concern than we might have several years ago when we were first looking to make those modifications. But there is the potential for slightly more ice in the hours leading up to launch.\u201d<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-16083\" title=\"A3\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2010\/09\/A317.jpg\" alt=\"\" width=\"333\" height=\"230\">At the time Katrina rampaged over the region, the tank was in Cell-A of MAF\u2019s Vehicle Assembly Building (VAB), where it was already undergoing return-to-flight modification work.<\/p>\n<p>\u201cIt was in Cell A for those mods \u2013 we had taken off the old bipod ramps, we had started removing some of the PAL ramps, and various other little mods were in work,\u201d added Lockheed Martin\u2019s John DesForges, ET-122 project manager (also known as the tank\u2019s \u201cmissile mother\u201d).<\/p>\n<p>\u201cWhat happened was pieces of concrete panels came down from the roof of the building, bounced off the building structure and pieces hit the tank.\u201d<\/p>\n<p>After the hurricane passed, NASA and Lockheed Martin made initial assessments of the tank. Their early conclusions were dire, as extensive damage was observed on and around the hardware.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-16092\" title=\"A10\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2010\/09\/A10.jpg\" alt=\"\" width=\"342\" height=\"269\">\u201cThe chief engineer and myself on the NASA side for the External Tank looked at this within a few days of its original damage and we weren\u2019t sure it would ever fly,\u201d Whipps noted. \u201cThe damage looked quite extensive and there was debris everywhere, there was water in places there shouldn\u2019t be water, so it looked like it was in a rough shape.\u201d<\/p>\n<p>Following the inspections to assess the hurricane damage and to determine whether the tank could be flown, DesForges was made project manager and tasked with setting up a feasibility study on repairing the tank.<\/p>\n<p>\u201cMy first duty, about three weeks after the hurricane, was to climb the stairs in the VAB to inspect the damage and from that point on I\u2019ve been associated with it,\u201d DesForges said. \u201cI did the damage assessment, where we inspected the tank, documented all the damage, put together a repair plan, and presented that to the customer. We gave them a couple of options about how to proceed.<\/p>\n<p>\u201cWe did a whole series of NDE (Non-Destructive Evaluations] \u2013 X-ray, ultrasonic inspection, penetrant inspection \u2013 and the tank was fine, not even a contour was changed. Most of the foam damage was limited to the LOX (tank) and the intertank; back at the aft end, where the two umbilicals are located.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-16093\" title=\"A11\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2010\/09\/A119.jpg\" alt=\"\" width=\"336\" height=\"242\">\u201cThose umbilicals retained some water during the hurricane. So to be safe, we just removed those from the vehicle and replaced them with new hardware. We inspected inside the propellant lines to make sure that no contamination bypassed the seals and they were all clean.\u201d<\/p>\n<p>After the inspections and assessments, it was decided that ET-122 would be put at the end of the tank production line to minimize the impact that the unique inspections and repairs would have on the overall tank production schedule.<\/p>\n<p>\u201cWe put this tank at the end, not necessarily because it was the worst tank to fix, but because it would have impeded our ability to get all of those other tanks through on-time,\u201d Whipps added. \u201cIt made more sense to take our time, do all these inspections and repair plans, and put it at the end of the production build for all External Tanks than to interrupt \u2013 the tanks that were already in flow.<\/p>\n<p>\u201cI think we took a year or so to slowly, carefully look at its potential viability. Once we had that data in hand, the rest of the time it\u2019s been relatively simple to say let\u2019s continue on with the rest of the flow and we\u2019ll put ET-122 at the end, use it as at least the launch-on-need tank, and only recently have we really begun to see the potential that it may actually get a manifested flight.\u201d<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-16087\" title=\"A5\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2010\/09\/A56.jpg\" alt=\"\" width=\"340\" height=\"216\">In November, 2008, NASA officially directed MAF to fully restore ET-122 for flight. In addition to all the required return-to-flight modifications, all the repairs to the tank were completed \u2013 visible as white areas on the tank.<\/p>\n<p>\u201cEverywhere you see a white spot is where we had to repair foam damage,\u201d DesForges noted. \u201cThere\u2019s three large areas on the tank where we actually went down to the metal and inspected the metal to make sure that it was OK, and sure enough they were.<\/p>\n<p>\u201cOn the LOX tank and intertank, which is where most of the damage was, we combined a lot of the small locations into a larger location, simply because it was easier to repair.<\/p>\n<p>\u201cThere was quite a large area on the bottom of the intertank, near the intertank access door, where we just stripped the intertank \u2013 the full length of it, about twenty-two feet \u2013 and resprayed that entire area.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-16090\" title=\"A9\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2010\/09\/A92.jpg\" alt=\"\" width=\"333\" height=\"230\">\u201cWe inspected the structure beneath that damaged foam, and that was probably the most complicated repair that we had to put together.\u201d<\/p>\n<p>Whipps said that the repair work on ET-122 was scheduled around production of other tanks, as MAF\u2019s priority was focused on supplying the line of tanks that aided the impressive flight rate between late 2008 and early 2010.<\/p>\n<p>\u201cIf we were busy with a production tank in there otherwise, ET-122 would have to wait until we had that place free \u2013 to put it in a final assembly cell, or back in Cell A to stand it vertically. It was driven by the logistics of the other tanks at that point.\u201d<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-16088\" title=\"A8\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2010\/09\/A82.jpg\" alt=\"\" width=\"340\" height=\"255\">Along with the repair areas, the tank also incorporates a logo on the intertank access door to commemorate the tank\u2019s history designed by Jon Irving with Lockheed Martin.<\/p>\n<p>The tank\u2019s history can also be noted via some of its own hardware, with the acreage sprays approximately ten years old. Additional testing and analysis was carried out to validate that wasn\u2019t an issue.<\/p>\n<p>\u201cThere has always been the concern that we be sure that we have enveloped the potential flight range of the tank with data, so that we can be sure that it is fit to fly,\u201d Whipps said. \u201cWe needed to do some more testing on aged samples that would be similar or older than the foam that ET-122 represents.<\/p>\n<p>\u201cWe now have that data completed and it shows that there\u2019s been no degradation related to the little older foam on this tank than what we\u2019ve flown before. So this does represent a new I\u2019ll call it \u2018fleet leader\u2019 for the age of the foam, but the data shows that were within all the expected mechanical properties.<\/p>\n<p>\u201cWe had to go do due diligence, but we\u2019re very comfortable with the results of that.\u201d<\/p>\n<p>Several hundred megabytes of high quality video and images from ET-122\u2019s rollout are available on L2.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>NASA and Lockheed Martin managers at the Michoud Assembly Facility (MAF) have spoken pride in the manufacturing, assembly, and repair work on External Tank 122 (ET-122), which was damaged by Hurricane Katrina five years ago. On Monday morning, the tank was rolled from Building 420 to the Pegasus barge that will carry it to Kennedy [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":29699,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":"","_links_to":"","_links_to_target":""},"categories":[2],"tags":[9181,3366],"class_list":["post-40651","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","tag-et-122","tag-sts-134"],"acf":[],"_links":{"self":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/40651"}],"collection":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/comments?post=40651"}],"version-history":[{"count":0,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/40651\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/media\/29699"}],"wp:attachment":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/media?parent=40651"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/categories?post=40651"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/tags?post=40651"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}