{"id":40669,"date":"2010-09-01T19:38:46","date_gmt":"2010-09-01T11:38:46","guid":{"rendered":"https:\/\/wp-productionenv-bjg9h2g2bgg5b8aa.southeastasia-01.azurewebsites.net\/news\/ssp-remaining-cautious-over-political-decision-on-funding-sts-135\/"},"modified":"2010-09-01T19:38:46","modified_gmt":"2010-09-01T11:38:46","slug":"ssp-remaining-cautious-over-political-decision-on-funding-sts-135","status":"publish","type":"post","link":"https:\/\/starpath.global\/news\/ssp-remaining-cautious-over-political-decision-on-funding-sts-135\/","title":{"rendered":"SSP remaining cautious over political decision on funding STS-135"},"content":{"rendered":"<p>A major milestone is upcoming for Atlantis\u2019 final role with the Space Shuttle Program (SSP), with the crew selection of four \u2013 from a pool of 11 \u2013 astronauts, set to take place in less than two week\u2019s time. However, SSP manager John Shannon outlined caution on STS-135 biggest milestone \u2013 becoming funded, as the prospect of a Continuing Resolution (CR) adds a level of uncertainty.<\/p>\n<p>STS-135 Latest:<\/p>\n<p>As reported by this site, STS-135 took a major step forward from an internal planning standpoint, when NASA aligned Atlantis\u2019 initial role \u2013 as STS-335, the Launch On Need (LON) support for STS-134 \u2013 with the manifested launch date for the notional STS-135.<\/p>\n<p>\u201cThe date for STS-335 has been moved to be consistent with STS-135. This really helps us with our workforce \u2018smoothing\u2019, so we are not driving people to milestones and not having peaks in the workforce needed,\u201d noted Mr Shannon on the latest Shuttle Standup\/Integration report (L2).<\/p>\n<p><img fetchpriority=\"high\" decoding=\"async\" class=\"alignleft size-full wp-image-15880\" title=\"A3\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2010\/09\/A3.jpg\" alt=\"\" width=\"327\" height=\"250\">This decision came after safety reviews passed the key stage that was required in the bill language created by the US Senate\u2019s refinements into the FY2011 budget proposal \u2013 which calls for STS-135 to be added \u2013 mirrored by the House version\u2019s \u2018agreement\u2019 to utilize Atlantis for an extra mission to the International Space Station (ISS),<\/p>\n<p>\u201cThe NESC (NASA Engineering and Safety) review was completed, and was accepted by Bill Gerstenmaier (NASA Associate Administrator for Space Operations),\u201d added Mr Shannon.<\/p>\n<p>\u201cThe direction he gave to the Programs was to go off and assess the recommendations NESC made for the overall flight, specifically on some of the details on the Russian Soyuz rescue that was required. (Mr Gerstenmaier) asked the NESC to put it in a white paper, and the Programs to respond to it so that it could be submitted to Congress and the White House.\u201d<\/p>\n<p>As noted previously, NASA can\u2019t simply go fly STS-135, as the authorization and allocation of funding is required before the flight can be manifested. Also, technically Atlantis will remain as STS-335 until Endeavour \u2013 on STS-134 \u2013 safely lands, releasing her older sister from the supporting role.<\/p>\n<p>Rocket building kits<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>Space Shuttle models<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>Company News<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>\n<p>     (adsbygoogle = window.adsbygoogle || []).push({});<\/p>\n<p>\u201cThe point is that moving the date helps, and the NESC study is good, and a crew will be selected for the LON mission and to preserve training, which all preserves options for us. But this does not guarantee that the STS-135 mission will fly,\u201d Mr Shannon continued.<\/p>\n<p>It is hoped that the refinements and negotiations relating to the FY2011 budget will be agreed on in time for a speedy and smooth implementation. However, if time runs out, NASA\u2019s budget will be forced into a Continuing Resolution, which clouds just exactly what NASA can do next year, obviously causing fallout when it comes to the required funding for STS-135.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-15881\" title=\"A6121\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2010\/09\/A6121.jpg\" alt=\"\" width=\"314\" height=\"234\">Until then, SSP will continue to map out STS-135 via planning, allowing for the quick inclusion of the mission into the manifest if and when the funding is approved. The fear, Mr Shannon noted, is that it may take until the start of next year before that situation is resolved one way or another.<\/p>\n<p>\u201cIt is unknown what will be in the CR, and right now there is no funding to fly it. There are several different options out there for how that might happen, but we are just preserving the options in front of us. We could be in limbo on STS-135 until the New Year starts, until we see what the CR language is, talk about funding, and talk more about mission content.<\/p>\n<p>\u201cThe team should really focus on making sure we have preserved the options, and have done the work required to be able to fly. Actually getting the agreement among all the different stakeholders to go fly it is still a ways away.\u201d<\/p>\n<p>And the teams are doing just that, with managers working through the NESC safety assessment findings and potential routes into workable operational solutions, in the event of a Continuing Resolution.<\/p>\n<p>\u201cWorking on their response to the MOD recommendation to the NESC on flying STS-135 in June 2011. Had a good discussion this week on artifacts, so will schedule meetings with each of their recipients to talk cost estimates and define the agreements that will be documenting the Space Act Agreements,\u201d noted Mission Operations on the Standup report.<\/p>\n<p>\u201cWill be supporting with Headquarters ESMD (Exploration Systems Mission Directorate) and SOMD (Space Operations Mission Directorate) on how they will execute the Program under a continuing resolution,\u201d added the Business Office on the same Standup report.<\/p>\n<p>\u201cThe agenda includes results coming out of the NASA Capabilities Forum, any issues or gaps with STS-135 or STS-335, and an update on how ESMD is going to be able to deploy their Program under a continuing resolution. Are trying to come to an agreement on the assumptions and execution plan for the first two quarters.\u201d<\/p>\n<p>STS-335\/135 Specific Articles: http:\/\/www.nasaspaceflight.com\/tag\/sts-135\/<\/p>\n<p>STS-335\/135 Processing Latest:<\/p>\n<p>Almost as if she knows it would be helpful to remain on her best behavior, in order to gain the extra trip into space, Atlantis isn\u2019t providing any issues for her engineers inside her Orbiter Processing Facility (OPF-1).<\/p>\n<p>Even before talk of STS-135 picked up, Atlantis was always going to be processed to at least the point of rollover in the flow, as part of her STS-335 LON requirements.<\/p>\n<h4 class=\"widget-title penci-border-arrow\">See Also<\/h4>\n<ul>\n<li>STS-335\/135 Updates<\/li>\n<li>L2&nbsp;STS-135&nbsp;&nbsp;Section<\/li>\n<li>Click here to Join L2<\/li>\n<\/ul>\n<p>\u201cOV-104 (Atlantis): ODS (Orbiter Docking System) pressure dome leak checks wrapped up this week. Also completed RMS (Remote Manipulator System) testing,\u201d noted Ground Operations on the latest Standup. \u201cContinuing testing on installation of the RCCs (Reinforced Carbon Carbon); have 2 of the 11 remaining to install.\u201d<\/p>\n<p>Atlantis will be powered up on Thursday, as engineers continue to work on her Thermal Protection System (TPS), work that is being aided by the pristine condition of her heatshield, following a very \u201cclean\u201d STS-132 mission.<\/p>\n<p>\u201cOV-104 (OPF Bay 1): Drag chute installation was completed Tuesday. Orbiter ground cooling T-0 were disconnected in support of a filter R&amp;R (Removal and Replacement). Filter R&amp;R was successfully completed and ground cooling T-0\u2019s were connected in support of Thursday\u2019s vehicle power up,\u201d noted the NASA Test Director (NTD) processing update (L2).<\/p>\n<p>\u201cThe nose landing gear was raised Wednesday to support TPS work. Both ET doors closed on Wednesday to support TPS work.\u201d<\/p>\n<p>Over in the Rotation Processing and Surge Facility (RPSF), operations are continuing to build-up the boosters that have been allocated to aid Atlantis\u2019 first stage flight, ahead of stacking in the Vehicle Assembly Building (VAB) next year.<\/p>\n<p>\u201cSRB BI-146 \/ RSRM 114 (RPSF): Left Aft Booster build-up: Case Inspection; ETA Ring Stubs are in work,\u201d added the NTD processing update. \u201cExit Cone offloads are complete, Inspections are next.\u201d<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-15882\" title=\"ET-133 laydown\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2010\/09\/A4.jpg\" alt=\"\" width=\"336\" height=\"224\" srcset=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2010\/09\/A4.jpg 336w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2010\/09\/A4-263x175.jpg 263w\" sizes=\"(max-width: 336px) 100vw, 336px\">Should STS-135 receive the required funding, it is likely the new ET-138 would be allocated to Atlantis, moving ET-122 to STS-134 with Endeavour. The \u2018old\u2019 ET-122 \u2013 which was damaged during Hurricane Katrina \u2013 has almost completed its repair and processing requirements at the Michoud Assembly Facility (MAF) in New Orleans.<\/p>\n<p>\u201cOn ET-122 in Building 420, making good progress. The LH2 PAL (Protuberance Air Load) ramp base repair spray and IFR (Ice Frost Ramp) extensions are sprayed and trimmed,\u201d noted Lockheed Martin\/MAF on their latest status report (L2).<\/p>\n<p>\u201cThe LH2 IFR PAL ramp base spray is done. The IFR extensions are still to be trimmed out there. Making their way out of the intertank in good order. Have the top two levels of scaffolding down. Stopped with the lower two levels of scaffolding. Have one test left to do before finish backing out.<\/p>\n<p>\u201cWere waiting for the bipods to get sprayed. Both bipods were sprayed as of last week. Various closeouts on the tank are going on pace. Repairs around the acreage are on schedule. TPS NDE (Non Destructive Evaluation) is 75-80 percent complete.\u201d<\/p>\n<p>The tank is tracking a completion date of the third week in September, with its five day trip by barge to the Kennedy Space Center (KSC) set to set sail shortly after.<\/p>\n<p>\u201cHave targeted a September 17 complete on the tank. Right now, holding to that date,\u201d added the MAF report. \u201cWill be coordinating with Logistics on this target date.\u201d<\/p>\n","protected":false},"excerpt":{"rendered":"<p>A major milestone is upcoming for Atlantis\u2019 final role with the Space Shuttle Program (SSP), with the crew selection of four \u2013 from a pool of 11 \u2013 astronauts, set to take place in less than two week\u2019s time. However, SSP manager John Shannon outlined caution on STS-135 biggest milestone \u2013 becoming funded, as the [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":"","_links_to":"","_links_to_target":""},"categories":[2],"tags":[3659],"class_list":["post-40669","post","type-post","status-publish","format-standard","hentry","category-news","tag-sts-135"],"acf":[],"_links":{"self":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/40669"}],"collection":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/comments?post=40669"}],"version-history":[{"count":0,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/40669\/revisions"}],"wp:attachment":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/media?parent=40669"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/categories?post=40669"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/tags?post=40669"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}