{"id":40718,"date":"2010-07-09T20:38:58","date_gmt":"2010-07-09T12:38:58","guid":{"rendered":"https:\/\/wp-productionenv-bjg9h2g2bgg5b8aa.southeastasia-01.azurewebsites.net\/news\/sts-135-nasa-managers-discuss-mission-outline-ahead-of-approval-decision\/"},"modified":"2010-07-09T20:38:58","modified_gmt":"2010-07-09T12:38:58","slug":"sts-135-nasa-managers-discuss-mission-outline-ahead-of-approval-decision","status":"publish","type":"post","link":"https:\/\/starpath.global\/news\/sts-135-nasa-managers-discuss-mission-outline-ahead-of-approval-decision\/","title":{"rendered":"STS-135: NASA managers discuss mission outline ahead of approval decision"},"content":{"rendered":"<p>Managers will meet on Monday to outline mission capabilities and content for STS-135 \u2013 pending the approval of the additional flight next month. The Integrated Product Team (IPT) will discuss additions to Atlantis\u2019 payload, such as Orbital Replacement Units (ORUs) or even technology demonstration payloads, in addition to Multi-Purpose Logistics Module (MPLM).<\/p>\n<p>STS-335\/135 Processing Latest:<\/p>\n<p>Atlantis continues to enjoy a smooth processing flow, following her return into the Orbiter Processing Facility (OPF-2) at the conclusion of STS-132. Regardless of the upcoming decision on whether or not to hand her one more mission with STS-135, Atlantis is being processed for flight as part of preparations for her STS-335 LON (Launch On Need) role in support of STS-134.<\/p>\n<p>\u201cOV-104 (Atlantis): Completed the OMS (Orbital Maneuvering System) pod functional; the pods are good,\u201d noted KSC Integration (L2). \u201cAbout 30 percent complete with the removal of the RCCs (Reinforced Carbon Carbon) on the LH (Left Hand) wing. Picked up with RSB (Rudder Speed Brake) tile evaluation.\u201d<\/p>\n<h4 class=\"widget-title penci-border-arrow\">See Also<\/h4>\n<ul>\n<li>STS-335\/135 Updates<\/li>\n<li>L2&nbsp;STS-135&nbsp;&nbsp;Section<\/li>\n<li>Click here to Join L2<\/li>\n<\/ul>\n<p>The upcoming milestone of SSME (Space Shuttle Main Engine) removal undergoing preparation, which will result in the three engines being removed next week.<\/p>\n<p>\u201cOV-104 (OPF Bay 1): LO2 valve shaft seal leak checks and pre-valve retest is complete and good. Sample and drain of WSB 2 and 3 was completed. SSME removal preps (began Friday),\u201d noted the NASA Test Director (NTD) processing report (L2).<\/p>\n<p>\u201cRadar turnaround system test is expected to be completed (prior to weekend). MEC\/PIC verification control bus drops continues. Weekend work: None scheduled.\u201d<\/p>\n<p>The Solid Rocket Boosters (SRBs) which have been allocated to STS-335 \u2013 and will become part of STS-135 in the event of the LON mission being upgraded to a scheduled flight \u2013 are currently being inspected inside the Rotation Processing and Surge Facility (RPSF), while External Tank (ET-122) is closing in on final assembly in New Orleans.<\/p>\n<p>Spaceflight news subscription<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>Space Shuttle<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>Rocket building kits<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>\n<p>     (adsbygoogle = window.adsbygoogle || []).push({});<\/p>\n<p>STS-335\/135 Specific Articles: http:\/\/www.nasaspaceflight.com\/tag\/sts-135\/<\/p>\n<p>\u201cSRB BI-146 \/ RSRM 114 (RPSF): Left Forward Center segment grain inspection is now scheduled for Monday, offload Tuesday,\u201d added the NTD report.<\/p>\n<p>\u201cET-122 All hands are working on this tank. Longeron closeouts continue; this is the critical path for getting out of Final Assembly. Bipod fittings are now on. All fits are complete,\u201d added the latest report from the Michoud Assembly Facility (MAF) \u2013 which saw the last \u2018new\u2019 tank \u2013 ET-138 for STS-134 \u2013 depart on its journey to KSC late this week.<\/p>\n<p>\u201cLO2 feedline fairings installed and the camera routings in work. The crew is inside the intertank doing all the mechanical and electrical routing. The LH2 aft manhole covers are installed. Making good critical path progress to the plan to mid-July to roll out of Final Assembly.\u201d<\/p>\n<p>STS-135 Planning:<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-15274\" title=\"A3\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2010\/07\/A36.jpg\" alt=\"\" width=\"201\" height=\"241\">All PRCB (Program Requirements Control Board) documentation to date has focused solely on Atlantis\u2019 role for the STS-335 LON mission \u2013 which remains as the baselined role for the orbiter, per the Flight Definition and Requirements Directive (FDRD), which is the key body for baselining missions under the direction of NASA and the Space Shuttle Program (SSP).<\/p>\n<p>However, on Monday, the IPT will meet and overview STS-135\u2019s basic elements \u2013 by way of pre-empting a positive outcome in approving STS-135. The final decision will be made next month.<\/p>\n<p>\u201cAn STS-335 IPT is scheduled for Monday July 12. As of now, the STS-335 mission is baselined in the FDRD as a launch-on-need (LON) rescue mission for STS-134\/ULF6. The STS-335\/LON mission would only be flown in the event the STS-134 vehicle\/Endeavour was declared unsafe for entry,\u201d opened notes for the IPT meeting, acquired by L2.<\/p>\n<p>\u201cThere have been ongoing discussions within the agency over the last several months to consider making STS-335 a planned mission to the ISS; the mission would be designated STS-135.<\/p>\n<p>\u201cIt was expected that the decision whether to fly STS-135 as a planned mission would be made by the end of June, however, the agency continues to evaluate the addition of STS-135 to the manifest and is now expected to make the decision in August.\u201d<\/p>\n<p><img fetchpriority=\"high\" decoding=\"async\" class=\"alignleft size-full wp-image-15279\" title=\"A324\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2010\/07\/A324.jpg\" alt=\"\" width=\"342\" height=\"226\" srcset=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2010\/07\/A324.jpg 342w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2010\/07\/A324-263x175.jpg 263w\" sizes=\"(max-width: 342px) 100vw, 342px\">The IPT notes gave the first official-level overview of STS-135\u2019s mission content that will be up for discussion next week, confirming the flight is currently being worked for Atlantis \u2013 despite some concerns over a number of predicted issues with part of her processing flow for flight, which had lead to some discussion on whether to hand the mission to Discovery.<\/p>\n<p>It was also noted \u2013 as expected \u2013 that STS-135 would fly with a minimum of four crew, allowing for a dual-Soyuz LON plan to be utilized in the highly unlikely event Atlantis received damage to the level she would not be able to bring the crew home.<\/p>\n<p>\u201cSince there will not be a Shuttle LON rescue mission prepared in support of STS-135, the mission crew size will remain four. In the event Atlantis is declared unsafe for entry, the rescue of the four STS-135 crew members would be performed using Russian Soyuz vehicles.<\/p>\n<p>\u201cThe exact agreement and timing for their return is still being negotiated between the partners. However, NASA has determined that the proposed rescue scenario using Russian assets is an acceptable solution for the rescue of the STS-135 crew.\u201d<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-15276\" title=\"A612\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2010\/07\/A6121.jpg\" alt=\"\" width=\"314\" height=\"234\">Also noted was a slight refinement to the notional launch date, slipping four days to June 28, 2011, for a 11+1+2 mission that is without any shuttle crew EVAs (due to crew size) \u2013 although alternative options are under consideration.<\/p>\n<p>\u201cIf STS-135 is indeed added to the manifest as a real mission, the expected launch date would be June 28, 2011, the crew size 4 up 4 down, mission duration 11+1+2, the payload an MPLM, the Orbiter Atlantis\/OV-104, and no planned EVAs,\u201d the notes added.<\/p>\n<p>\u201cThe assumption for STS-135 flying only four Shuttle crew members is that there will be no planned EVAs. However, it is unclear whether an EVA could be planned using ISS crew members.\u201d<\/p>\n<p>In the event of STS-335 launching on a rescue mission to the ISS, baselining documentation showed Atlantis would carry a MPLM \u2013 mainly for the purpose of restocking the Station, following its hosting of the STS-134 crew prior to STS-335\u2019s arrival.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-15277\" title=\"A2B1\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2010\/07\/A2B1.jpg\" alt=\"\" width=\"345\" height=\"235\">The MPLM remains as part of Atlantis\u2019 payload for the notional STS-135 mission, per IPT notes, although confirmation that discussions earlier in the year \u2013 for the addition of a LMC (Lightweight Multi-Purpose Carrier) in the aft of the orbiter\u2019s payload bay \u2013 is becoming part of the mission\u2019s planning.<\/p>\n<p>More interesting will be the forward plan on what types of payloads could ride uphill on the LMC, with the obvious opportunity to aid the ISS\u2019 long-term future via ORUs, but also the potential to launch technology demonstration payloads.<\/p>\n<p>\u201cThere have been discussions about further optimizing the mission by either adding or protecting for additional payloads, namely Goddard Space Flight Center technology demonstration payloads, or possibly ISS ORUs (if required) which could be integrated on a Lightweight Multi Purpose Experiment Support Structure (MPESS) Carrier (LMC) which would be installed in the cargo bay aft of the MPLM,\u201d continued the notes.<\/p>\n<p>\u201c(EVA) capability needs to be evaluated\/considered to determine whether adding payloads to an LMC which require EVA for removal is viable option. The possibility of using the Special Purpose Dexterous Manipulator (SPDM \u2013 Dextre) to remove FRAM (Flight Releasable Attachment Mechanism) based payloads from the LMC must also be understood.<\/p>\n<p>\u201cDuring the STS-335 Cargo Integration Review which was conducted early March, the decision was made to generate engineering products which protected for the late addition of an LMC to the flight. This decision has provided the Agency\/Programs the flexibility to accommodate future payloads beyond the normal template date for adding payload.\u201d<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-15278\" title=\"A6\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2010\/07\/A63.jpg\" alt=\"\" width=\"296\" height=\"208\">Those payloads will be decided over the coming weeks, likely as part of the approval decision \u2013 although the late June 2011 flight may allow for launching the Variable Specific Impulse Magnetoplasma Rocket (VASIMR) engine&nbsp;\u2013&nbsp;providing it can&nbsp;support its original scheduled \u2013 which is questionable.&nbsp;VASIMR would be tested by aiding the ISS altitude control \u2013 such as reboosts.<\/p>\n<p>The engine \u2013 otherwise know as an Electro-thermal Plasma Thruster or Electro-thermal Magnetoplasma engine \u2013 uses radio waves to ionize and to heat propellant and magnetic fields to accelerate the resulting plasma to generate thrust.<\/p>\n<p>However, due to the power requirements at the ISS, the engine will only be put through minimal testing. Several other working assumptions are also pre-empted for the notional mission, which will undergo evaluation during Monday\u2019s meeting.<\/p>\n<p>Such assumptions include the need to move to a Flight Day 4 rendezvous and docking, Thermal Protection System (TPS) inspection timelines and the length of the docked phase to the mission.<\/p>\n<p>\u201cThe purpose of the July 12 STS-335 Flight IPT is to determine the actual mission capabilities, based on current assumptions, and discuss possible changes and determine the feasibility to accommodate them,\u201d continued the overview.<\/p>\n<p>\u201cThe mission timeline for flying only four Shuttle crew members assumes rendezvous occurs on flight day (FD) 4 (vs. FD3). Due to the increased workload placed on a 4 vs. 7 member crew during the pre dock time frame, a FD4 rendezvous was determined to be required to protect shuttle crew scheduling constraints.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-15281\" title=\"A318\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2010\/07\/A318.jpg\" alt=\"\" width=\"332\" height=\"220\" srcset=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2010\/07\/A318.jpg 332w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2010\/07\/A318-263x175.jpg 263w\" sizes=\"(max-width: 332px) 100vw, 332px\">\u201cThe possibility of deferring some of the FD2 Orbiter TPS inspection until the post docked timeframe has been mentioned as a possible way to provide additional MPLM transfer time. (We) would like to better understand the risks and timeline trades to determine if this is indeed a viable solution for increasing the docked timeframe.<\/p>\n<p>\u201cAs of now we don\u2019t even know if additional docked time is required to meet mission requirements; STS-135 mission requirements documentation does not yet exist.<\/p>\n<p>\u201cSo again, the primary focus of the IPT will be to discuss and gain a better understand of current mission capabilities, identify possible design solutions to accommodate changes, and review schedules and major program milestone and baseline dates, New Payloads Development\/Documentation, Payload Cargo Engineering\/VLA, Vehicle Processing, Shuttle &amp; ISS Crew Training.).\u201d<\/p>\n<p>The IPT will then be able to to identify critical decision dates to ensure the Agency and related programs understand what options are still viable for the STS-135 mission, in the event of approval being gained.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Managers will meet on Monday to outline mission capabilities and content for STS-135 \u2013 pending the approval of the additional flight next month. The Integrated Product Team (IPT) will discuss additions to Atlantis\u2019 payload, such as Orbital Replacement Units (ORUs) or even technology demonstration payloads, in addition to Multi-Purpose Logistics Module (MPLM). STS-335\/135 Processing Latest: [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":29524,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":"","_links_to":"","_links_to_target":""},"categories":[2],"tags":[3659],"class_list":["post-40718","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","tag-sts-135"],"acf":[],"_links":{"self":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/40718"}],"collection":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/comments?post=40718"}],"version-history":[{"count":0,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/40718\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/media\/29524"}],"wp:attachment":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/media?parent=40718"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/categories?post=40718"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/tags?post=40718"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}