{"id":40754,"date":"2010-06-13T17:52:24","date_gmt":"2010-06-13T09:52:24","guid":{"rendered":"https:\/\/wp-productionenv-bjg9h2g2bgg5b8aa.southeastasia-01.azurewebsites.net\/news\/shuttle-fleet-deep-in-processing-for-their-new-launch-dates\/"},"modified":"2010-06-13T17:52:24","modified_gmt":"2010-06-13T09:52:24","slug":"shuttle-fleet-deep-in-processing-for-their-new-launch-dates","status":"publish","type":"post","link":"https:\/\/starpath.global\/news\/shuttle-fleet-deep-in-processing-for-their-new-launch-dates\/","title":{"rendered":"Shuttle fleet deep in processing for their new launch dates"},"content":{"rendered":"<p>While&nbsp;the three shuttle orbiters&nbsp;continue to enjoy nominal processing&nbsp;flows, managers are continuing to evaluate the exact launch&nbsp;date targets for the upcoming&nbsp;missions. Those launch dates have slipped at a program level, with&nbsp;STS-133\u2019s mission to the International Space Station (ISS) now baselined for No Earlier Than (NET) late October,&nbsp; slipping STS-134&nbsp;to February\/March, 2011, with the potential&nbsp;for&nbsp;STS-135 to launch \u2013 if added \u2013 in&nbsp;late June, 2011.<\/p>\n<p>STS-133 Processing Latest:<\/p>\n<p>Discovery is looking forward to an eventful period next week, as she begins receiving her Space Shuttle Main Engines (SSMEs) from Monday, while in the Vehicle Assembly Building (VAB) her External Tank (ET-137) will be mated with the awaiting twin Solid Rocket Boosters (SRBs) on Tuesday.<\/p>\n<p>\u201cOV-103 (STS-133) Got the LH2 tank removed from the midbody, part of the Tank Set #5. Continuing with the system testing, working the detailed testing. Got the aft ballast installed. That clears the way for the engines that are going in next week,\u201d noted KSC Ground Operations (L2).<\/p>\n<h4 class=\"widget-title penci-border-arrow\">See Also<\/h4>\n<ul>\n<li>Shuttle Fleet Updates<\/li>\n<li>L2 STS-133 Special Section<\/li>\n<li>L2 Manifest\/Schedule Section<\/li>\n<li>L2&nbsp;ISS Section<\/li>\n<li>To Join L2 \u2013 click here<\/li>\n<\/ul>\n<p>\u201cContinuing to work main engine installation preps. Continuing with TPS (Thermal Protection System) processing, with 103 cavities remaining for tile bonding.\u201d<\/p>\n<p>Discovery is being processed for what is currently her final flight \u2013 pending what is only a very slight possibility of an extension, or the gaining of the notional STS-135 mission, should managers opt to remove Atlantis from converting her STS-335 flow into a baselined mission.<\/p>\n<p>With the addition of two EVAs, \u201ccrew loading\u201d (training) schedules pushed the launch date out to late October, although final updates on the schedule for other visiting vehicle to the ISS \u2013 due to Dual Docked Operations (DDO) constraints \u2013 and solar beta angle cutouts, need to be worked prior to an official launch date NET announcement.<\/p>\n<p>STS-133 Specific Articles: http:\/\/www.nasaspaceflight.com\/tag\/sts-133\/<\/p>\n<p>The slip results in Discovery gaining several weeks of additional processing flexibility, although she is the only orbiter that is being worked on over the weekend.<\/p>\n<p>Aerospace &amp; Defense<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>Spaceflight<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>SpaceX<path d=\"M7.59009 18.59L9.00009 20L17.0001 12L9.00009 4L7.59009 5.41L14.1701 12\" style=\"animation: initial !important; background: initial !important; border: 0px !important; box-shadow: none !important; color: inherit !important; cursor: inherit !important; direction: inherit !important; display: inline !important; fill: currentcolor !important; filter: initial !important; float: none !important; margin: 0px !important; opacity: initial !important; outline: 0px !important; overflow: initial !important; padding: 0px !important; stroke: initial !important; transform: initial !important; vertical-align: initial !important; visibility: inherit !important;\"><\/path>\n<p>     (adsbygoogle = window.adsbygoogle || []).push({});<\/p>\n<p><img fetchpriority=\"high\" decoding=\"async\" class=\"alignleft size-full wp-image-14978\" title=\"A3\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2010\/06\/A310.jpg\" alt=\"\" width=\"320\" height=\"214\" srcset=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2010\/06\/A310.jpg 320w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2010\/06\/A310-263x175.jpg 263w\" sizes=\"(max-width: 320px) 100vw, 320px\">\u201cOV-103 (OPF Bay 3): S-band troubleshooting (IPR-0005): Complete to date. No Dropouts were experienced. Data evaluation in work,\u201d added the NASA Test Director (NTD) processing latest (L2). \u201cPre-ops for SSME installation complete. SSME installation scheduled to start Monday. Pratt &amp; Whitney Rocketdyne\/KSC: Have the STS-133 engines ready to go to support the vehicle schedule.<\/p>\n<p>\u201cDrag chute installation update: The galled screws were replaced and drag chute installation was completed. Update Interim Problem Report (IPR) 0022 update: The IPR condition \u2013 LH2 Relief Valve Functional Test, PV12 relief valve did not get expected crack pressure \u2013 was caused by a valve that was left open. The IPR is being closed as a procedural error.<\/p>\n<p>\u201cWeekend Work: TPS waterproofing as well as mid body Orbiter electrical repair and keel installations.\u201d<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-14979\" title=\"A4\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2010\/06\/A410.jpg\" alt=\"\" width=\"329\" height=\"208\">Work in the Hypergolic Maintenance Facility (HMF) \u2013 relating to Discovery\u2019s faulty helium isolation valve on the Right OMS (Orbital Maneuvering System) RRCS (Right Reaction Control System) \u2013 is also on track, as the month long repair enjoyed the milestone of the replacement hardware\u2019s arrival.<\/p>\n<p>\u201cAt the HMF, continuing with the repair on the RH (Right Hand) pod. That is still on schedule to be back the second week of July,\u201d noted KSC Logistics on the latest Shuttle Standup\/Integration report. \u201cThe spare He ISO valve was delivered to HMF to support that R&amp;R.\u201d<\/p>\n<p>As expected, the SE&amp;I (Systems Engineering and Integration) ET\/SRB Mate review for STS-133 found no constraints for the mating operations to begin on Tuesday, as engineers finalize their preparations by completing TPS foam repairs \u2013 caused by the intertank plug\/pull tests \u2013 on the tank.<\/p>\n<p>\u201cSRB BI-144 \/ RSRM 112 (VAB HB-3): Left Forward joint closeout complete less PR (Problem Report) on a de-bond. Right Heater cable: Damaged sensor wire. Awaiting hardware (solder kit) delivery. Parts coming from Utah no earlier than June 15. Not an ET mate constraint,\u201d outlined NTD processing information. \u201cNo constraints for ET mate scheduled for June 15.<\/p>\n<p>\u201cET-137 (VAB HB-4E): TPS repairs are continuing and on schedule to be completed (by weekend). ET mate preps continue with inspections and platform operations.\u201d<\/p>\n<p>STS-134 Processing Latest:<\/p>\n<p>Endeavour\u2019s flow inside OPF-2 is also on track, even if managers decide to advance the flight ahead of STS-133 in the mission order, as has been intimated as a possibility via the ongoing evaluations.<\/p>\n<p>STS-134 Specific Articles: http:\/\/www.nasaspaceflight.com\/tag\/sts-134\/<\/p>\n<p>\u201cOV-105 (OPF Bay 2): Audio\/Video interface testing completed. Window #7 inserts will be replaced. Window installation will continue through next week,\u201d noted the NTD\u2019s processing status. \u201cWeekend Work: None.\u201d<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-14980\" title=\"A5\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2010\/06\/A54.jpg\" alt=\"\" width=\"332\" height=\"220\" srcset=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2010\/06\/A54.jpg 332w, https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2010\/06\/A54-263x175.jpg 263w\" sizes=\"(max-width: 332px) 100vw, 332px\">Work is also taking place on installing a Boundary Layer Transition (BLT) Detailed Test Objective (DTO), which involves a small bump being added to one of the tiles on the orbiter\u2019s belly. The goal of the experiment is to measure the effects of increased heating from an early boundary layer transition as the orbiter returns to Earth.<\/p>\n<p>Discovery has been the only orbiter to fly with the BLT DTO, opening with STS-119, prior to the Program Requirements Control Board (PRCB) approval to add a protuberance to one of Endeavour\u2019s tiles.<\/p>\n<p>\u201cGot approval to do the BLT on OV-105 (Endeavour) similar to what was done on OV-103 (Discovery). There was discussion regarding protuberance height. The team brought forward rationale for 0.5 inch height, which will go forward to the Program for approval,\u201d noted the Standup report, with a full article based on the resulting PRCB presentation to follow.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-14981\" title=\"A6\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2010\/06\/A61.jpg\" alt=\"\" width=\"333\" height=\"225\">Meanwhile, with the Mobile Launch Platform (MLP) \u2013 used during STS-132\u2019s launch \u2013 now back inside the VAB, preparations for booster stacking are picking up inside the Rotation Processing and Surge Facility (RPSF).<\/p>\n<p>\u201cSRB BI-145 \/ RSRM 113 (RPSF): Left Aft Booster Buildup: Acrymax application to RT-455 complete. Preps to transfer of AFT Booster to pallet in work. Right Aft Booster Buildup: Aft skirt transition floor plate RTV complete,\u201d noted processing information.<\/p>\n<p>With stacking set to take place after managerial approval, Endeavour\u2019s ET-138 \u2013 the final ET to be constructed at the Michoud Assembly Facility (MAF) \u2013 is set to arrive at the Kennedy Space Center (KSC) next month. Engineers in New Orleans are tracking a June 20 completion date, followed by a rollout ceremony on July 8.<\/p>\n<p>\u201cET-138: In Building 420, the TPS closeouts are going well. Testing is going well. Shakedowns continue. Are off the top of most of the hydrogen tank, and have started the process of pulling the scaffolding out of the intertank,\u201d noted contractor Lockheed Martin on the Standup report.<\/p>\n<p>\u201cOnly around half a day down from the commitment day right now. Still building confidence that they will hit the ET complete date of June 20.\u201d<\/p>\n<p>STS-335\/STS-135 Processing Latest:<\/p>\n<p>Atlantis is still at least a few weeks away from knowing if she\u2019ll get to fly on a baselined mission, with her current processing flow in OPF-1 continuing on the pre-planned STS-335 LON (Launch On Need) rescue support for the final scheduled flight of the shuttle.<\/p>\n<p>STS-135 Specific Articles: http:\/\/www.nasaspaceflight.com\/tag\/sts-135\/<\/p>\n<p>\u201cRCC (Reinforced Carbon Carbon) thermography inspections are on-going. Orbiter window inspections continue with completion expected Monday. Windows 9 and 10 will be inspected next week. FRCS (Forward Reaction Control System) functional and checkout is complete. OMS pod functional checkout continues into next week,\u201d noted NTD processing information, which also noted the addition of a ninth IPR to her flow.<\/p>\n<p>\u201cNew IPR 0009 \u2013 Detected During FRCS functional and checkout. GSE (Ground Support Equipment) delta pressure transducer stuck at upper limit. Troubleshooting released the transducer indication. Weekend Work: None.\u201d<\/p>\n<p>Following Atlantis\u2019 highly successful STS-132 mission, her flight crew are being debriefed by managers, as the IFA (In Flight Anomaly) review closes in on being presented to the PRCB next Thursday.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-14982\" title=\"A211\" src=\"https:\/\/www.nasaspaceflight.com\/wp-content\/uploads\/2010\/06\/A211.jpg\" alt=\"\" width=\"314\" height=\"239\">As part of the post-mission flow, the orbiter\u2019s Flow Control Valves (FCVs) have been removed and shipped back to their fabricator Vacco in California. There they will be inspected for any signs of cracks, relating to the mitigation of liberations from the poppet area of the valve, as seen during STS-126, leading to a year long investigation into the incident.<\/p>\n<p>\u201cOV-104 (STS-132): FCV (Flow Control Valve) removal has been completed. The FCVs from the last flight are back at Vacco,\u201d noted KSC Integration. \u201cNext week, will pick up with OMS Pod checkout. Continuing with post-flight TPS inspection; 70 percent complete at this time.\u201d<\/p>\n<p>STS-335 was assigned ET-122, a tank that is undergoing repairs after suffering damage during Hurricane Katrina. Processing of the tank has been proceeding to plan, although a reference to the evaluations on the final manifest running order was noted on the latest ET-122 flow report.<\/p>\n<p>\u201cET-122: Making progress on the critical path. Have the STS-134 crew coming in to look at their ride,\u201d the Standup report noted, before adding: \u201cThey will be shown both tanks (ET-122 and ET-138) since it is not certain which one will end up as theirs.\u201d<\/p>\n<p>Shuttle managers are hoping for a decision on STS-135 by the end of this month.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>While&nbsp;the three shuttle orbiters&nbsp;continue to enjoy nominal processing&nbsp;flows, managers are continuing to evaluate the exact launch&nbsp;date targets for the upcoming&nbsp;missions. Those launch dates have slipped at a program level, with&nbsp;STS-133\u2019s mission to the International Space Station (ISS) now baselined for No Earlier Than (NET) late October,&nbsp; slipping STS-134&nbsp;to February\/March, 2011, with the potential&nbsp;for&nbsp;STS-135 to launch [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":"","_links_to":"","_links_to_target":""},"categories":[2],"tags":[9051,3366,3659],"class_list":["post-40754","post","type-post","status-publish","format-standard","hentry","category-news","tag-sts-133","tag-sts-134","tag-sts-135"],"acf":[],"_links":{"self":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/40754"}],"collection":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/comments?post=40754"}],"version-history":[{"count":0,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/posts\/40754\/revisions"}],"wp:attachment":[{"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/media?parent=40754"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/categories?post=40754"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/starpath.global\/blog\/wp-json\/wp\/v2\/tags?post=40754"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}